{"id":8,"title":"Reference Projects","slug":"reference-projects","last_published_at":"2025-03-17T06:10:11.663320Z","template":"reference-projects-page","content":{"Project":[{"id":150,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/Is_402_-_Maaden_Fosfat_3_Faz_1_Was_Cevher_Zenginlestirme_Projesi_yeni.jpg","project_type":{"title":"Chemical","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-chemical.png"},"project_status":"Ongoing","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/Is_402_-_Maaden_Fosfat_3_Faz_1_Was_Cevher_Zenginlestirme_Projesi_yeni.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/Is_402_-_Maaden_Fosfat_3_Faz_1_Was_Cevher_Zenginlestirme_Projesi_yeni.jpg","commence":"08-08-2024","complete":"11-02-2026","title":"Ma’aden Phosphate 3 Phase 1 Was-Beneficiation Project","slug":"maaden-phosphate-3-phase-1-was-beneficiation-project","job_no":"402","portion":100.0,"client":"Saudi Arabian Mining Company (Ma'aden)","latitude":31.6758,"longitude":38.6714,"contractor":"Tekfen Construction and Installation Co. Inc.","description":"<p>Ma’aden Phosphate 3 Phase 1 WAS-Beneficiation is one of the integrated production facilities of the Ma’aden Phosphate 3 Phase 1 Project, launched to increase the phosphate fertilizer production capacity of The Saudi Arabian Mining Company (Ma’aden).</p><p>The Ma’aden Phosphate 3 Phase 1 WAS-Beneficiation Project involves the construction of a Beneficiation Plant with a capacity of 2.05 Mt/year. The project includes receiving raw ore from the mine, processing it, and discharging the final concentrate to either the Phosphoric Acid Plant or storage for external sale, while directing tailings to the Temporary Site Facilities.</p><p>Facts and Figures</p><ul><li>Primary Crusher Building</li><li>Inner Land, Reception and Disposal Conveyors, and Transfer Towers</li><li>Crushed Ore Silo</li><li>Secondary &amp; Tertiary Crusher Building</li><li>Tertiary Screening Building</li><li>Mill Feed Bin Building</li><li>Milling &amp; Classification Building</li><li>Grinding Media Storage Shed</li><li>Laboratory Building</li><li>Soda Ash Area</li><li>Flotation Area</li><li>Reagent Package Area</li><li>Process Water Basin</li><li>Tailing Thickening Area</li><li>Product Thickening Area</li><li>Buffalo Feeder, Repulping Tank &amp; Kaolin Dosing Area</li><li>Pipe Racks Area</li><li>Substations</li><li>Brine Water Pipeline</li></ul><p>The project scope covers all civil, utility, structural, steel, mechanical, electrical, instrumentation, telecommunication, fire protection, and CCTV works, along with landscaping, road, and lighting works.</p><p>Main Works and Relevant Quantities</p><ul><li>Excavation: 377,074 m³</li><li>Structural Fill &amp; Backfill: 370,773 m³</li><li>Reinforced Concrete: 67,462 m³</li><li>Asphalt Roads: 38,900 m²</li><li>Steel Structure: 8,850 tons</li><li>Piping: 103,303 WDI</li><li>Mechanical Equipment: 6,202 tons</li><li>Instrumentation: 6,429 units</li><li>Electrical Equipment: 1,008 units</li><li>Electrical Cable: 770,275 m</li><li>Telecommunication Cable: 113,610 m</li><li>Instrument Cabling: 227,790 m</li><li>HVAC System: 4 units</li></ul>","text_promotion":""},{"id":140,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/2024_Baku_9065.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Azerbaijan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/2024_Baku_9065.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/2024_Baku_9065.jpg","commence":"09-02-2021","complete":"26-09-2024","title":"The Central Bank Of The Republic Of Azerbaijan Project","slug":"central-bank-republic-azerbaijan-project","job_no":"376","portion":100.0,"client":"Central Bank of the Republic of Azerbaijan","latitude":40.379334,"longitude":49.847478,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>The New Headquarters Building for the Central Bank of the Republic of Azerbaijan project is located at the Haydar Aliyev Avenue, Baku, Azerbaijan, where Tekfen had completed various landmark projects over the years in the same avenue.</p><p>Total construction area of the project is 68.326 m<sup>2</sup>, mainly comprises a tower which is harmonious with the planned architectural intent of the region, an energy center and various structures located in the landscape area. The tower is in 163.80 mt height and consists of 2 underground and 35 aboveground floors.</p><p>The envelope of the tower is designed as a sculptural all glazing facade which emphases its unique geometry. Beyond its strong architectural appearance, it will serve as a semipermable layer between interior and exterior environments in terms of technical and physical requirements.</p><p>Below ground floors consist of technical areas and parking spaces. Above ground floors comprise office areas.</p><p>Contract scope of the Tekfen includes structural works, architectural works, map works with the execution of design development, procurement, construction and handover activities.</p><p></p><p><b>FACTS AND FIGURES</b></p><ul><li>Earthworks: 120.496 m<sup>3</sup></li><li>Number of Piles: 162 ea</li><li>Structural Concrete: 86.925 m<sup>3</sup></li><li>Rebar: 18.197 ton</li><li>Structural Steel: 5.652 ton</li><li>Facade Area: 26.030 m<sup>2</sup></li><li>Lifts: 10 ea</li></ul>","text_promotion":""},{"id":139,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/TITAS_Toros_Jetty_2.jpg","project_type":{"title":"Terminal","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-terminal.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/TITAS_Toros_Jetty_2.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/TITAS_Toros_Jetty_2.jpg","commence":"01-03-2021","complete":"11-06-2023","title":"Toros Ceyhan Jetty Project","slug":"toros-ceyhan-jetty-project","job_no":"377","portion":100.0,"client":"Tekfen Agri-Industry Group","latitude":36.919823,"longitude":35.987777,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Toros Tarım Industry and Trade Inc. In Adana – Ceyhan planned to construct 3 liquid platforms to serve the fuel oil tankers with a maximum of 150,000 DWT (deadweight tonnage) and a minimum of 25,000 DWT; an approach road with piles and reinforced concrete superstructure to connect these platforms to the land; a breakwater and tugboat pier for tugboats that will provide piloting service to the entire port on the land side of these platforms; and a steel pipe gallery starting from the end of the breakwater fill (400 m away from the land) that connects these platforms to the old pier in order to respond to the development of the Iskenderun Bay for the next 50 years.</p><p>The project scope covers the strengthening the existing approach road of the old west pier belonging to the Employer; engineering, material supply, construction of the breakwater and 1st Stage 80,000 DWT pier extension works (excluding electrical, mechanical, piping and process equipment and their labor). The project includes engineering, procurement and construction (EPC) works.</p><p></p><p><b>FACTS AND FIGURES</b></p><p><b>The project consists of following process sections: </b></p><ul><li>1 80,000 DWT (Dead Weight Tonnage) platform,</li><li>8 mooring dolphins,</li><li>2 LOOPs</li><li>Pipe bridge from land to final mooring dolphin (MD8) (end of 1st stage), (1,385 m)</li><li>The approach road (818 m) that will continue from the existing Pier to the last mooring dolphin (MD8) (end of 1<sup>st</sup> stage),</li><li>New breakwater and shelter pier to be used by tugboats on the land side of the platform,</li><li>Strengthening the existing liquid dolphin loading platform,</li><li>Supply and installation of marine equipment</li><li>Cathodic protection works</li></ul><p></p><p><b>The Main Works and The Relevant Quantities:</b></p><ul><li>Steel Piles: 12,210.74 tons</li><li>Number of Steel Pipe Piles: 463 pieces</li><li>Steel Pipe Pile Length: 18,804.33 m</li><li>Concrete: 16,864.90 m<sup>3</sup></li><li>Rebar: 1,860.25 tons</li><li>Breakwater Filling: 88,308 m<sup>3</sup></li><li>Steel Structures: 2,430,490 kg</li><li>Precast Units: 479 pieces</li><li>Highway Guardrail: 1,346 mt</li></ul>","text_promotion":""},{"id":138,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/369-cover.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/Leed-Certificate.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/369-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/369-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/369-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/369-5.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/369-6.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/369-7.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/369-1.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/369-cover.jpg","commence":"01-07-2019","complete":"13-11-2020","title":"Tekfen FNN Sustainability Center","slug":"tekfen-fnn-sustainability-center","job_no":"369","portion":100.0,"client":"Tekfen Construction and Installation Co., Inc.","latitude":37.0286,"longitude":35.812821,"contractor":"YOO Architecture Co., Inc.","description":"<p>FNN Sustainability Center is located on Tekfen Construction&#x27;s main repair and maintenance facility (GAT) site at Ceyhan, Adana province at southern Anatolia. FNN Project construction area is 2325 m<sup>2</sup>, and it was designed and built to include closed and open office areas, meeting rooms, conference hall (with a seating capacity of 100 people), a 3-storey mezzanine shelf system for in-house archiving (approximately 27,000 box storage capacity) for Tekfen’s own archiving purposes. The project also offers exhibition and museum areas (to exhibit the machinery and equipment in the company&#x27;s past inventory collection), a hydraulic elevator for the disabled people, indoor and outdoor gardens with ornamental pools, the green terrace area on the roof to increase relaxation and recreation areas for employees and visitors.</p><p>Our goal in bringing life of such a symbolic structure for archiving in general sense yet with integrated functionalities open to visits is mainly for letting infrastructure and attractions in Ceyhan / Adana where Tekfen roots lie to increase self-education and awareness, and to carry on Tekfen’s heritage to next generations over a futuristic building always to be recognized as a prominent landmark with a powerful identity.</p><p>FNN Sustainability Center, has been certified as worthy of LEED Platinum on 28.11.2020, under «LEED BD+C: New Construction (v4)» category (Building Design and Construction) for fully satisfying the criteria as per the following evidenced outcome.</p><p></p><p><b>FACTS AND FIGURES</b></p><p><b>Main Project Work Volumes</b></p><ul><li>Concrete: 1.656,11 m<sup>3</sup></li><li>Steel Re-Bar: 165,86 ton</li><li>Formwork: 2.709,18 m<sup>2</sup></li><li>Structural Steel: 65,77 ton</li><li>Facade (Perforated Metal Sheet): 1.359,16 m<sup>2</sup></li><li>Facade (Glass): 802,98 m<sup>2</sup></li><li>PV Panel Area: 450 m<sup>2</sup>; Panel Surface Area: 240 m<sup>2</sup>; No.of Panels: 147</li></ul>","text_promotion":""},{"id":1,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0021_213_1_HuWbwTG.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Azerbaijan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0021_213_1_HuWbwTG.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0021_213_1_HuWbwTG.jpg","commence":"28-04-1997","complete":"15-03-1999","title":"Western Route Pipeline, Azeri Section","slug":"western-route-pipeline-azeri-section","job_no":"213","portion":50.0,"client":"AIOC, Azerbaijan International Operating Company","latitude":40.192164,"longitude":49.484514,"contractor":"Tekfen Construction and Installation Co., Inc. - AZFEN Alliance","description":"<p>Baku - Supsa Pipeline Project covers the construction of 20” x 444 km FBE (Fusion Bonded Epoxy) coated new crude oil pipeline between Caspian Sea and Azerbaijan - Georgia border to be used to export the Azerbaijan crude oil to the Black Sea Coast, to Supsa.<br/></p><p>The system, with a capacity of 115.000 bpd, is the main route of Azerbaijan, exporting Chiraq field crude oil through Georgia.<br/></p><p>The project, first planned as a rehabilitation scheme, was later turned into a completely new lay system.<br/></p><p>The project scope covered 335 canal, 40 stream, 51 minor water, 15 river, 6 railway, 32 bored road and 87 open-cut road crossings. Open-cut method was applied to cross a 487 m wide river with 2,5 m depth.<br/></p><p>31 manual, 3 check valves, 607 test posts, 16 ground-beds, 16 transformer rectifier units were installed along the Azerbaijan portion of the pipeline.<br/></p><p>During the construction, work force peaked at 805. Though, at its peak, the welding production rate reached 3 km level, relevant repair rate never exceeded 3%.<br/></p><p>The project also achieved considerable success on HSE aspects, by being awarded for “3 million man-hours without a lost time incident / LTI”.<br/></p><p>The project was implemented according to an “Alliance” agreement signed between Tekfen and its sister company Azfen (a J.V. between Tekfen and State Oil Company of Azerbaijan SOCAR); responsibility was equally shared in accordance with an organization plan.<br/></p><p>The works from the Georgian border to the city of Gence was overtaken by Tekfen while Gence-Sangachal (tie-in) section was successfully accomplished by Azfen.</p>","text_promotion":""},{"id":2,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0020_273_2_ZVGXJ6Z.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Azerbaijan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/273.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/273-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/273-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/273-1.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/273.jpg","commence":"15-05-2002","complete":"01-05-2003","title":"Apsheron Peninsula High Pressure Natural Gas Pipeline And Associated Compressor Station","slug":"apsheron-peninsula-high-pressure-natural-gas-pipeline-and-associated-compressor-station","job_no":"273","portion":50.0,"client":"Azerigaz JSC","latitude":40.464053,"longitude":49.957589,"contractor":"Tekfen Construction and Installation Co., Inc. - Azfen J.V.","description":"<p>Apsheron Peninsula High Pressure Natural Gas Pipeline and Associated Compressor Station Project in Azerbaijan has been undertaken by Tekfen - Azfen J.V. on EPC basis.<br/></p><p>The project aims to provide natural gas from the SOCAR’s, (State Oil Company of Azerbaijan), Gas Processing Facilities in Karadag to the 400 MW Severnaya Gas Combined Cycle Power Plant, located 40 km north-east of Baku. While the Project, upon completion, will serve the needs of the power plant, it is the intention of JSC Azerigaz to utilize the project as a component of its future expansion plan to supply gas to other end-users on the Apsheron Peninsula.<br/></p><p>The project consists of two phases, the one presently undertaken by Tekfen - Azfen being within the scope of the first phase. The second phase, which is still under consideration, shall include the expansion of the Compressor Station.<br/></p><p><b>Karadag Compressor Station</b><br/></p><p>The compressor station receives natural gas from SOCAR treatment plant and delivers compressed gas into an 87 km long pipeline feeding the Severnaya Power Plant.<br/></p><p>The Compressor Station, located at Karadag, consists of the following:</p><ul><li>2 gas turbine driven (approximately 11 MW each) compressors each rated at 5 million m3 / day at 37 barg discharge pressure to deliver natural gas to Severnaya Power Plant,</li><li>2 (100% motor - driven) start up fuel gas compressors to provide fuel to the main gas turbine drives,</li><li>Air / gas coolers,</li><li>Emergency Auxiliary Diesel or Gas Generator Set,</li><li>Three pig stations at Karadag, Digah and Severnaya,</li><li>2 Line Valve Stations at Karadag - Digah and Digah - Severnaya,</li><li>Cathodic Protection System,</li><li>2 Branch Tie-Ins,</li><li>2 Gas Metering Facilities.<br/></li></ul><p><b>Karadag - Digah Pipeline</b><br/></p><p>42 km long Karadag - Digah Pipeline transports natural gas from the Karadag Compressor Station to the Digah Pig Station. The pipeline, 1.000 mm in diameter with the wall thickness varying between 11,01 and 19,10 mm is designed for 45 barg and operated at 37 barg.<br/></p><p>Digah - Severnaya Pipeline Digah - Severnaya Pipeline is 45 km long and transports natural gas from Digah Pig Station to the Severnaya Power Plant. This pipeline, which is designed for 45 barg and operated at 37 barg, is 700 mm in diameter with the pipe wall thickness varying between 9,52 and 13,00 mm.<br/></p><p><b>Pig Stations</b></p><ul><li>1 Pig Station at Karadag Compressor Station consisting of a pig launcher and vent stack,</li><li>1 Pig Station at Digah consisting of a pig receiver, pig launcher and vent stack,</li><li>1 Pig Station at Severnaya Power Plant consisting of a pig receiver and vent stack.<br/></li></ul><p><b>Line Break and Branch Tie - In Valve Stations</b></p><ul><li>LVS - 1 at kp 23+855</li><li>LVS - 2 at kp 63+500<br/></li></ul><p><b>5 Branch Tie-Ins</b></p><ul><li>BV 1 at 0+907</li><li>BV 2 at 23+050</li><li>BV 3 at 34+350</li><li>BV 4 at 41+950</li><li>BV 5 at 87+117<br/></li></ul><p><b>Gas Metering Facilities</b><br/><br/>Karadag Outlet Metering Facility (At outlet of compressor station Karadag - Digah - Severnaya Pipeline at the territory of the Severnaya Power Plant).<br/></p><p><b>Other Associated Systems and Facilities within the project’s scope are</b></p><ul><li>Corrosion inhibitor injection facilities for internal corrosion protection,</li><li>Internal corrosion monitoring facilities,</li><li>Cathodic protection system,</li><li>Electrical system,</li><li>Grounding and lightning protection.<br/></li></ul><p>The project has been successfully completed 60 days prior to scheduled completion date by Tekfen - Azfen J.V</p>","text_promotion":""},{"id":3,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0019_220-221-SUPSAM2.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Georgia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/221-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/221-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/221-3.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0004_221.jpg","commence":"27-10-1997","complete":"28-02-1999","title":"Pump Stations, Pressure Reducing Stations And Mobile Radio Stations Along Baku - Supsa Pipeline","slug":"pump-stations-pressure-reducing-stations-and-mobile-radio-stations-along-baku-supsa-pipeline","job_no":"221","portion":50.0,"client":"Georgian Pipeline Company","latitude":42.027038,"longitude":41.757095,"contractor":"Tekfen Construction and Installation Co., Inc. - AZFEN Alliance","description":"<p>The scheme is part of the Azerbaijan Early Oil Transportation Project.<br/></p><p>Civil, Mechanical, Piping, Instrumentation and Electrical Works of 3 Pump, 2 Pressure Reducing and 10 Radio Stations along Georgian portion of the Baku - Supsa Pipeline which transports Azerbaijan’s Caspian crude oil to the Black Sea port of Georgia, Supsa.<br/></p><p>The stations (Pump, Reduction, Radio) were spread all along the 368 km pipeline crossing Georgia which added to the challange of the project, as each station had to be handled as a separate project site.<br/></p><p>Major items within Tekfen’s scope were:</p><ul><li>Civil Works (site leveling, grading, construction of cable canals, underground piping, construction of equipment foundations, fencing and landscaping),</li><li>Mechanical Works (fabrication and erection of all piping, equipment erection, structural steel and framing, pre-commissioning and commissioning assistance),</li><li>Electrical &amp; Instrumentation Works (cabling, terminations, instrument installation, automatic control, pre-commissioning assistance).</li></ul>","text_promotion":""},{"id":4,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/repair-generic.png","project_type":{"title":"Repair, Maintenance And O&M Services","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-repair.png"},"project_status":"Completed","project_location":"Georgia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/repair-generic.png"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/repair-generic.png","commence":"19-03-2018","complete":"19-03-2021","title":"Pipelines Repair And Enhancement Project","slug":"pipelines-repair-and-enhancement-project","job_no":"365","portion":16.7,"client":"BP Exploration (Caspian Sea) LTD","latitude":41.948176,"longitude":41.817551,"contractor":"Tekfen Construction and Installation Co., Inc. & Azfen Joint Venture","description":"<p>Project 365 Georgia Pipelines Repair and Enhancement Project frame contract agreement has been signed on 19th March of 2018 with the client BP Exploration (Caspian Sea) Ltd a frame agreement, which has a similar scope with the ongoing BTC projects within Turkey with Tekfen Job no. 363. Georgia is the main pipeline route for Caspian Sea gas and oil resources and these pipelines demand continuous maintenance and enhancement. With the extensive experience on pipelines, Oil&amp;Gas facilities and infrastructure, TEKFEN - AZFEN JV has joined the competition against the local companies and/or locally established Companies like AZFEN itself. The contract for the Project 365 will be expired by the 19th March of 2021.</p><p><b>Major works in the scope of Project 365;</b></p><ul><li>Landslide Areas</li><li>Camp Sites Reinstatements (SCP)</li><li>Pump – Compressor Stations Enhancement Works</li><li>Various Civil, Mechanic, Electrical Works. The work scope within Georgia to be defined with in the Call offs to be issued under the frame contract.</li></ul><p></p><p><b>Work Locations</b><br/></p><p>The projects are being performed at several locations on the pipelines &amp; pump - compressor stations when the pipeline is operating.<br/></p><ul><li>Rustavi BP Yard</li><li>Marneuli</li><li>PSG1 BTC</li><li>PSG2 BTC</li><li>Tsalka</li><li>Borjomi</li><li>Borjomi OSR</li><li>Bakuriani</li><li>Andeziti Camp</li><li>Kodiana SB</li><li>Akhaltsikhe C.</li><li>Area 80 (Vale Border)</li><li>Poti</li><li>Batumi</li><li>PS11 WREP</li><li>PS13 WREP</li><li>PS15 WREP</li><li>PRS1 WREP</li><li>PRS2 WREP</li></ul><p>All along pipeline routes in Georgia (BTC, WREP, SCP). The work locations could be at any related point within Georgia as to be defined with in the Call offs to be issued under the frame contract.</p>","text_promotion":""},{"id":5,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0018_132_1_dkqln8z.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Iraq","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0018_132_1_dkqln8z.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0018_132_1_dkqln8z.jpg","commence":"21-11-1985","complete":"05-06-1987","title":"Iraq - Turkey Crude Oil Pipeline & Tank Farm, 2nd Expansion","slug":"iraq-turkey-crude-oil-pipeline-tank-farm-2nd-expansion","job_no":"132","portion":17.0,"client":"BOTAŞ, Petroleum Pipelines Corporation","latitude":35.467127,"longitude":44.377725,"contractor":"Tekfen Construction and Installation Co., Inc. - Saipem SpA (Italy) - Kutlutaş (Turkey) Consortium","description":"<p>The first pipeline (981 km) transporting crude oil from Iraq (Kirkuk) to Turkey (Ceyhan) was constructed between 1975 - 1977. Tekfen was part of the contracting group, which successfully accomplished the construction of the challenging project.<br/></p><p>Tekfen was also among the contractors overtaking the 2nd expansion works of Iraq - Turkey Crude Oil Pipeline as a consortium between 1985 - 1987.<br/></p><p>The description of works are as following:<br/></p><p>1 - Iraq - Turkey Crude Oil Pipeline &amp; Tank Farm, 2nd Expansion Project, Turkish Section<br/> (Job No: 132, US$ 71.428.427)<br/></p><p>The project scope (of the Pipeline’s Turkish Section) includes EPC works of 5 x 135.000 m3 (total 4.218.000 bbl) floating roof crude oil storage tanks (dia 100,59 m &amp; height 17, 16 m) including commissioning and maintenance services during the warranty period. Erection of the tank farm (at Ceyhan, Turkey), its loading facilities and related piping works were executed by Tekfen Construction and Installation Co., Inc. while the tankage manufacturing works were executed by its affiliate, Tekfen Manufacturing and Engineering Co., Inc.<br/></p><p>The project scope also covered;</p><ul><li>Engineering and construction works of 30’’ x 56 km and 46’’ x 556 km pipelines with two major river crossings; Euphrates River 46’’ x 308 m crossing, 4-6 m depth, 2 m / sec flow rate; Göksu River 46” x 320 m crossing and Bahçe River 30’’ x 550 m (concrete buried pipe) crossing,</li><li>Procurement and installation of 3 pump stations, 1 metering station and 4 scraper stations,</li><li>Construction of a ballast treatment plant with capacity of 800 m3 / hr.<br/></li></ul><p>2 - Iraq - Turkey Crude Oil Pipeline &amp; Tank Farm, 2nd Expansion Project, Iraqi Section<br/> (Job No: 133, US$ 12.300.000)<br/></p><p>The scheme under Tekfen’s scope in Iraqi section (Baiji) covered the design, procurement, fabrication, erection, testing, painting, commissioning, all related piping, electrical, instrumentation works and maintenance services during warranty period of 6 floating roof storage tanks each with a capacity of 60.000 m3 (total 2.250.000 bbl, dia 79,86 m &amp; height 12 m) and one 15.000 m3 (93.750 bbl) fire water tank.<br/></p><p>3 - Iraq - Turkey Crude Oil Pipeline, Interconnecting Facilities at Ceyhan Marine Terminal<br/> (Job No: 141, US$ 4.070.000)<br/></p><p>The scope of the project overtaken by Tekfen covered the construction and installation works of interconnecting facilities between two separate pipeline systems:<br/></p><p>(a) Iraq (Kirkuk) - Turkey (Ceyhan) and<br/>(b) Yumurtalık - Kırıkkale Crude Oil Pipeline System located within central Turkey. The interconnecting works were executed at Ceyhan Marine Terminal located at the Mediterranean Coast of Turkey.<br/></p><p>* In March 2003 Tekfen started construction of a new Marine Terminal at Ceyhan, this time in the framework of another mega scheme, Baku - Tbilisi - Ceyhan, BTC Crude Oil Pipeline Project, transporting the Caspian crude oil to the Mediterranean shores.</p>","text_promotion":""},{"id":6,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/2024_TITAS_20250119_080543.jpg","project_type":{"title":"Oil & Gas Facility","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-oil-gas.png"},"project_status":"Completed","project_location":"Iraq","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/2024_TITAS_20250119_080543.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/2024_TITAS_20250119_080543.jpg","commence":"04-01-2017","complete":"30-06-2023","title":"Rumaila General Installation Services","slug":"rumaila-general-installation-services","job_no":"355","portion":100.0,"client":"BP Iraq NV","latitude":30.230524,"longitude":47.41132,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>The Rumaila oilfield, located 50 kilometers west of Basra in Southern Iraq, is one of the largest oil fields in the world. Rumaila is a supergiant oil field requiring significant investment to continue to modernize and deliver future production growth – vital revenue for the Government of Iraq and its people. Therefore, bp and PetroChina have established Basra Energy Company Limited (BECL), an incorporated joint venture (IJV). From 1 June 2022, BECL owns and manages their interests at the Rumaila field. BECL is expected to enable optimized and continued investment throughout the duration of the existing Technical Service Contract – due to expire at the end of 2034 – including enhanced access to external financing. COMPANY acts as lead contractor and enters into all contractual arrangements required by the ROO.</p><p>The oilfield production capacity is around 1,5 million barrels as of 2023.</p><p>In order to sustain or grow oil production the capacity at Rumaila Oilfield as the field matures, several oil (Dehydrator &amp; Desalter-D&amp;D, new trains, separators, etc.) and water projects (Free Water Knock out projects-FWKO, Produced Water projects, pipelines, treatment plants, etc.) are being implemented at the existing degassing stations in phases.</p><p>Scope of the project, Tekfen is establishing the FWKO and PWT facilities at the Iraq-Rumaila DS3 (Degassing Station-3). The FWKO facility is designed to process 170.000 barrels of oil per day. The project which started as construction works in 2017, continued as EPC-C (Engineering-Procurement-Construction and Commissioning) project after the mandatory stoppage in the coronavirus pandemic. The FWKO facility which was established for the separation of oil coming from the wells in the Rumaila region, consist of two main separation trains, chemical injection packages including vessels and pumps, instrument air vessel and systems, flare systems, E-house and tie-in elements. The PWT facility, which was established to transfer the separated water at the FWKO to the PWRI(Produced Water Re-Injection) facilities, consist of produced water transfer pumps, recovered oil pumps, skimmer vessel and connection elements of PWT system. DS3 FWKO and PWT facilities are a comprehensive project in which engineering, procurement, construction and commissioning works are carried out together.</p><p>The General Installation Services Contract Tekfen signed with BP Iraq NV is a frame contract. This frame contract defines the type of activities/services that might be required though out the contract. However the specific work scope and related technical and commercial extent is being determined based on the Call offs to be issued by Client for each specific project. Forty-two Call offs have been issued in the project scope.</p><p></p><p><b>FACTS AND FIGURES</b></p><p>The project call offs consist of following work scopes:</p><ul><li>Engineering Works</li><li>Procurement Works</li><li>Brownfield Enabling Works</li><li>Civil Works</li><li>Structural Steel Fabrication &amp; Installation Works</li><li>Mechanical Installation Works</li><li>Pipe Fabrication &amp; Installation Works</li><li>Tie-in Installation Works</li><li>Equipment Installation Works</li><li>Electrical &amp; Instrument Installation Works</li><li>Mechanical Completion and Commissioning Works</li></ul><p><b>The main works and the relevant quantities:</b></p><ul><li>Excavation: 6.975,00 m<sup>3</sup></li><li>Backfilling: 2.482,00 m<sup>3</sup></li><li>Reinforced Concrete: 7.568,00 m<sup>3</sup></li><li>Structural Steel Fabrication and Installation: 1.751,00 t</li><li>Equipment Installation: 1.190,00 t</li><li>Piping Fabrication and Erection: 1.632,00 t</li><li>Cable Tray Erection: 5.055,00 m</li><li>Cable Laying: 94.065,00 m</li></ul>","text_promotion":""},{"id":7,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0000_205_MOK9L7k.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Kazakhstan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/205_3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/205_2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/205_4.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0000_205_MOK9L7k.jpg","commence":"14-08-1996","complete":"12-07-1997","title":"Saztube - Yelemez - Aporni Crude Oil Pipeline","slug":"saztube-yelemez-aporni-crude-oil-pipeline","job_no":"205","portion":96.0,"client":"Kazaktürkmunay Ltd. (TPAO, Turkish Petroleum Co., Inc. - Ministry of Geology of Kazakhstan J.V.)","latitude":43.690392,"longitude":51.306123,"contractor":"KAZFEN J.V. (Tekfen Construction and Installation Co., Inc. - Munaygaskurylys Ltd.)","description":"<p>Saztube - Yelemez - Aporni Crude Oil Pipeline scheme was Tekfen’s first project in Kazakhstan and covered construction of:</p><ul><li>6” x 26 km crude oil pipeline from Saztube to Yelemez,</li><li>10” x 62 km crude pipeline from Yelemez to Aporni,</li><li>2 Scraper Trap Stations, 2 Mainline Valves and Cathodic Protection System were also within the project scope,</li><li>2 Railway Crossings (2 x 30 m) and one Road Crossing of 25 m were successfully implemented.<br/></li></ul><p>The pipeline transports crude oil of Saztube and Yelemez fields to the main line crossing nearby Aporni which connects Western Kazakhstan fields to Samara (RF). The oil fields are operated by Kazaktürkmunay Ltd., a J.V. of Turkish Petroleum Co., Inc. and Ministry of Geology of Kazakhstan.<br/></p><p>Seamless pipes as per API 5L Gr. B standard were supplied by the client. Tekfen was responsible for the supply of all other material (line valves, fittings, scraper traps, cathodic protection and wrapping material).<br/></p><p>Tekfen successfully accomplished the project within the schedule despite harsh winter conditions of Kazakhstan.</p>","text_promotion":""},{"id":8,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0017_245-146-4659_fAxG10O.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Kazakhstan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/245.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/245-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/245-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/245-3.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/245.jpg","commence":"29-03-2000","complete":"01-06-2002","title":"Caspian Pipeline Consortium Pipeline, Kazakhstan Section (Cpc-k)","slug":"caspian-pipeline-consortium-pipeline-kazakhstan-section-cpc-k","job_no":"245","portion":100.0,"client":"Caspian Pipeline Consortium (CPC)","latitude":43.250651,"longitude":76.436497,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>CPC is the first post-Soviet era export project of Kazakhstan, transporting rich Tengiz oil to world markets through Russia’s Novorossisk Terminal on the Black Sea Coast. Pipeline will also be transporting the production from other fields in Kazakhstan such as Kashagan and Karachaganak. Russian produced volumes will also be fed to the pipeline through various tie-in points in Russia along the route.<br/></p><p>The total length of the pipeline between Tengiz Field and Novorossisk Terminal is 1.510 km with an invested amount of US$ 2,6 billion. The amount of crude oil expected to flow through the pipeline is 28 million t per year.<br/></p><p>Tekfen’s scope covered the construction of 452 km, 40” and 28” pipeline (partly rehabilitation, partly new-built) starting from Tengiz Field and reaching Russian / Kazakh border over the north of the Caspian Sea; revamping of the Tengiz Pump Station and construction of a new Pump Station at Atyrau. Pipeline’s original throughput capacity, 28 MTA will ramp up to its final, 67 MTA, with the construction of additional pump stations.<br/></p><p><b>SCOPE OF WORKS</b><br/></p><ul><li>452 km, 40” and 28” existing pipeline rehabilitation,</li><li>Existing pipeline hydro-test and insulation,</li><li>22 valve stations and communication system,</li><li>16 road / rail crossings,</li><li>kp (kilometer point) 204,0 Atyrau Pig Launcher / Receiver Station Construction,</li><li>kp 203,0 Tengiz - Chevron Oil Meter Station,</li><li>kp 0,0 - kp 452,0 10 kV Main Energy Line Rehabilitation,</li><li>kp 0,0 Tengiz Pump Station Expansion and Rehabilitation,</li><li>2 main line pumps,</li><li>6 foam generation buildings,</li><li>1 fire fighting building,</li><li>2 x 2.500 m<sup>3</sup> fire water tanks,</li><li>10 kV high voltage energy line,</li><li>115 km electrical / instrumentation cable lay,</li><li>150 instrument installation,</li><li>2.500 loop test,</li><li>New motor control unit,</li><li>Control buildings,</li><li>SCADA System,</li><li>kp 204,0 Atyrau Grass Root Pump Station,</li><li>Construction of Central Pump Station in Kazakhstan with, 3.200 m<sup>3</sup> / hr capacity,</li><li>7.000 m<sup>3</sup> concrete, 1.800 m pile, 40.000 m<sup>3</sup> earth works, tank dikes and sewage system,</li><li>Main control building,</li><li>2 foam generation buildings,</li><li>Fire fighting building,</li><li>Air floatation building,</li><li>Service water and waste water treatment units,</li><li>EPC works for 2 x 20.000 m<sup>3</sup> crude oil storage tanks,</li><li>2 x 2.500 m<sup>3</sup> fire water tanks,</li><li>2 x 400 m<sup>3</sup> static settling tanks,</li><li>570 t equipment installation,</li><li>17 km - 850 t steel, cast iron and HDPE pipe fabrication, painting, isolation, insulation, test tracing and installation works,</li><li>Installation of 2 x 40 t main line pumps,</li><li>Fabrication and installation of 200 t steel platform, lighting towers and various supports,</li><li>230 km electrical / instrument cable pulling,</li><li>450 loop test,</li><li>Project Material and Equipment Procurement worth of US$ 14.000.000,</li><li>HSE Achievement Certificate of 4,5 million Man-hours without LTI.<br/></li></ul><p>The challenging project also created a unique opportunity for Tekfen to test the new procurement environment in the (post-Soviet) CIS countries.</p>","text_promotion":""},{"id":9,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0016_203-17_1_ILAlkCu.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Kuwait","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0016_203-17_1_ILAlkCu.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/203.jpg","commence":"05-05-1996","complete":"26-01-1997","title":"Design And Construction Of Wafra - Mina Saud Crude Oil Pipeline","slug":"design-and-construction-wafra-mina-saud-crude-oil-pipeline","job_no":"203","portion":100.0,"client":"Kuwait Oil Company - Saudi Arabian Texaco Inc. (Joint Operations)","latitude":28.596471,"longitude":48.10047,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Wafra Oil Field is situated at the neutral zone between Kuwait and Saudi Arabia. The facilities of Saudi Arabian Texaco at Mina Saud are accepted to lie on the Saudi Arabian soil.<br/></p><p>The aim of the project is to transport the crude oil from the Main Storage / Tankage Center at Wafra (also constructed by Tekfen) to the facilities of Saudi Arabian Texaco at Mina Saud.<br/></p><p>The project consists of design and construction of 20” x 50 km steel crude oil pipeline and laying of 53 km optical fiber cable between Wafra and Mina Saud. 16 road crossings with a total length of 370 m, various hot-tap operations and control room modification were also included in the project scope.<br/></p><p>The project was part of the joint operations of Kuwait Oil Company / KOC and Saudi Arabian Texaco Inc.<br/></p><p>Tekfen successfully delivered the project within schedule and complying with the highest international standards.</p>","text_promotion":""},{"id":10,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0015_300_IXSrAs7.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Libya","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/300-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/300-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/300-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/300-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/300-5.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/300.jpg","commence":"06-06-2006","complete":"01-03-2011","title":"Al Khufra - Tazerbo Water Conveyance System","slug":"al-khufra-tazerbo-water-conveyance-system","job_no":"300","portion":67.0,"client":"GMMRA, The Great Man Made River Authority of Libya","latitude":24.566652,"longitude":20.746535,"contractor":"Tekfen Construction and Installation Co., Inc. - TML J.V.","description":"<p>GMMRA - The Great Man Made River Authority of Libya awarded one of the most challenging sections of Libya’s mega water transmission scheme to Tekfen - TML partnership in 2005: Construction of 380 km Al Khufra - Tazerbo Water Conveyance System.<br/></p><p>Free issue post-tensioned concrete pipes, each with a length of 7,5 m, a diameter of 4 m and a weigh of 72 t, are to be transported and erected in the harsh conditions of Sahara Desert.<br/></p><p>The source of the water is the Nubian Aquifer (a geological formation extending from Western Cameroon to Eastern Palestine) in the south - east part of Libya. The project is part of a multinational scheme monitored and supported by International Fund for Agricultural Development (IFAD), an organization under United Nations.</p><p></p><p><b>HIGHLIGHTS</b></p><ul><li>Number of Pipes: 51.080</li><li>Concrete Works: 160.900 m<sup>3</sup></li><li>Reinforcement Steel: 22.800 t</li><li>Insulation Works: 140.000 m<sup>2</sup></li><li>Pre-excavation of Pipeline Route: 2.100.000 m<sup>3</sup></li><li>Trench Excavation: 21.750.000 m<sup>3</sup></li><li>Number of manholes for Pipeline: 854<br/></li></ul><p><b>FACTS</b></p><p>In 1953, the search for the new oilfields in the deserts of southern Libya led to the discovery not only of significant oil reserves, but also vast quantities of fresh water trapped in the underlying strata. The majority of this water was accumulated around 38.000 to 14.000 years ago, though some aquifers are only 7.000 years old. Al Khufra basin, lying in the south east of Libya, near the Egyptian border, covers an area of 350.000 km<sup>2</sup>, with an aquifer formation over 2.000 m deep.</p>","text_promotion":""},{"id":11,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0014_325_aNI8aFZ.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Morocco","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/325-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/325-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/325-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/325.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/325-4.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/325.jpg","commence":"20-12-2010","complete":"31-01-2014","title":"OCP Slurry Pipeline Project","slug":"ocp-slurry-pipeline-project","job_no":"325","portion":100.0,"client":"Groupe Chérifien Des Phosphates","latitude":33.161568,"longitude":-8.629316,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>OCP Slurry Pipeline project has been designed to deliver several grades of phosphates to Jorf Lasfar Terminal. Project location is between Korigba and Jorf Lasfar.<br/></p><p>Project duration is 28 Months after Contract signature.<br/></p><p>Phosphate grades and throughputs listed below are based on design data received from OCP. The facilities are designed to handle a throughput of 30 Mt/y initially and 38 Mt/y in the future.<br/></p><p>The project scope includes Detail Engineering, Procurement, and Construction (EPC) services to supply, install, and commission the facilities including all associated works .<br/></p><p>Project consist of approximately 240 km of pipelines including the feeder lines , Doui Pump station, MEA Head Station, Halasaa pump Station and Jorf Terminal. Feeder pipelines from each wash plant pump station will deliver sequential batches of each grade to segregated tanks at the head station at MEA. From the head station sequential phosphate batches will be pumped through the main pipeline into storage tanks at the terminal. One slurry grade will be supplied to the local acid plants and all slurry grades will be supplied for export purposes.<br/></p><p>The pipeline scope consists generally of:<br/></p><ul><li>Slurry feeder pump stations and pipelines from the wash plants to the central pipeline</li></ul><p>Head Station as summarized below;<br/></p><ul><li>Pipeline Head Station</li><li>Main Slurry Pipeline from Head Station to Terminal</li><li>Daoui Feeder Pipeline</li><li>2. MEA Low Grade Feeder Pipeline</li><li>MEA High Grade Feeder Pipeline</li><li>Halassa Feeder Pipeline</li><li>Pipeline Terminal at Jorf Lasfar</li><li>SCADA and Telecommunication Facilities</li><li>Valve Stations</li><li>Slurry Storage and Pump Stations</li><li>Slurry feeder pipelines</li><li>Fresh water pipeline</li></ul>","text_promotion":""},{"id":12,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0013_297_bsGF710.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Qatar","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/297.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/297-1.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/297.jpg","commence":"04-07-2005","complete":"31-08-2008","title":"Ras Laffan - Mesaieed, Ethane Transmission Pipeline","slug":"ras-laffan-mesaieed-ethane-transmission-pipeline","job_no":"297","portion":100.0,"client":"Qatar Petroleum","latitude":25.887115,"longitude":51.545102,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Ras Laffan Industrial City is located on the north shore of Qatar, 80 km north of the capital Doha, while the other industrial city Mesaieed lies 45 km south of the capital.<br/></p><p>Ras Laffan - Mesaieed Ethane Transmission Pipeline Construction Project, the inaugural contract of Tekfen in Qatar, is a showcase for the skilled Tekfen team in a country with high competition among international contractors.<br/></p><p>The ethane feedstock to the cracker is supplied from nearby EGU and Dolphin projects’ on-shore facilities.<br/></p><p>Tekfen has undertaken the construction of 137 km long ethane transmission pipeline (dia 20&quot; &amp; 24&quot;)* from Ras Laffan to Mesaieed; construction of 2 new valve stations and expansion of 9 existing valve stations were also within the same scheme.<br/></p><p><i>* (20&quot; x 124 km &amp; 24&quot; x 13 km)</i></p>","text_promotion":""},{"id":13,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0012_304_WlXOaYd.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Qatar","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/304-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/304-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/304-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/304-4.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/304.jpg","commence":"06-11-2006","complete":"02-09-2009","title":"Umm Bab - Mesaieed Crude Oil Pipeline","slug":"umm-bab-mesaieed-crude-oil-pipeline","job_no":"304","portion":100.0,"client":"Qatar Petroleum","latitude":25.209406,"longitude":50.800781,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Qatar’s main oil wells are located on the west part of the country, called Dukhan Area. The oil, from this area, is transported to Mesaieed Refineries in the southern part of the country.<br/></p><p>The newly constructed crude oil pipeline is 80 km long and has a diameter of 20&quot;. It is an above ground pipeline on sleepers tied with anchor blocks. Pig launcher and receiver facilities are also in the project scope.<br/></p><p>Also de-oiling and demolishing works of 62,5 km long old pipeline is part of the scope. De-oiling works are completed in May 2008.<br/></p><p>Another part of the scope is upgrading 3 existing crossover stations that will be used in case of emergency. Emergency Shut Down Valves will be installed in these crossovers to stop oil flow in case of necessity.<br/></p><p>Main scope can be described as:</p><p><b>PIPELINES</b></p><ul><li>20&quot; x 80 km (aboveground)</li><li>16&quot; x 62,5 km (De-oiling &amp; demolishing of existing pipeline)<br/></li></ul><p><b>STATIONS</b></p><ul><li>Upgrading of 3 existing Cross-over Valve Stations</li></ul>","text_promotion":""},{"id":14,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/kharampur-cover_8lxWYTN.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Russian Federation","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/kharampur-1_vt846IL.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/kharampur-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/kharampur-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/kharampur-4.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/kharampur-cover_rD1MtjH.jpg","commence":"01-02-2020","complete":"30-05-2022","title":"Kharampur Gas Pipeline Project","slug":"kharampur-gas-pipeline-project","job_no":"372","portion":100.0,"client":"Kharampurneftegaz Limited Liability Company","latitude":66.307521,"longitude":74.304826,"contractor":"Tekfen Construction and Installation Co., Inc.& RUSFEN Limited Liability Company Consortium","description":"<p>Rosneft and BP together have established the company Kharampurneftegaz LLC which operates as an oil and gas exploration and production company. The Kharampur Gas Pipeline Project shall transfer the gas explored from the “Senoman Deposit and the Turonian Deposit Territory” in Yamalo-Nenets Region to Gazprom main gas transfer network.</p><p></p><p><b>FACTS &amp; FIGURES</b></p><ul><li>Total pipe length: 90 Km</li><li>Pipe Diameter: 48”</li><li>HDD River Crossings: 2 nos</li><li>Road Crossing: 3 nos</li><li>Block Valve Stations : 7 nos</li><li>Substation: 1 nos</li><li>Pig Launcher and Receiver: 1nos</li><li>Electrical Overhead Line: 85 km</li></ul>","text_promotion":""},{"id":15,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/127.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/127.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/127.jpg","commence":"29-05-1985","complete":"01-12-1989","title":"Al Jubail - Riyadh Line-c Pipeline","slug":"al-jubail-riyadh-line-c-pipeline","job_no":"127","portion":100.0,"client":"SWCC, Saline Water Conversion Corporation","latitude":26.966955,"longitude":49.561204,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Line-C is one of the major water transmission system projects successfully accomplished in Saudi Arabia by Tekfen.<br/></p><p>The purpose of the project was to supply potable water from Al Jubail Desalination Plant to Riyadh High Point Terminal.<br/></p><p>Line-C Pipeline Project was one of the 4 phases constituting the Water Supply System; Tekfen’s responsibility covered construction of 60” x 375 km pipeline, pump stations and an underground reservoir system.<br/></p><p>TECHNICAL SPECIFICATIONS<br/></p><p>The project consists of 375 km, 60” diameter steel pipeline system with 4 pumping stations, a delivery terminal and a storage reservoir system of 6 x 60.000 m3 underground concrete tanks. Line pipe materials are API X-52 and X-60 with wall thicknesses ranging between 14,27 mm and 17,48 mm. Interior of the pipeline is lined with 14 - 16 mm cement mortar layer and exterior is coated with 6 mm polyethylene.<br/></p><p>Design flow rate of the pipeline system is 4,4 m3 / sec, which gives and average daily throughput of 380.000 m3.<br/></p><p>Water has to be pumped from the Desalination Plant, located at sea level, to 700 m elevation at Riyadh High Point Terminal. For this purpose 4 pump stations are used, each delivering in the range of 40 to 55 bars dynamic pressure with 20 - 30 MW installed capacity.<br/></p><p>Operation of the system is designed to be automatically controlled by telemetering with computer back up from the center at Al Jubail.<br/></p><p>ENGINEERING<br/></p><p>Tekfen has also performed the following tasks:<br/></p><ul><li>Hydraulic design verification of the pipeline system,</li><li>Pipeline strength calculations and verification of pipe wall thickness distribution,</li><li>Optimisation of route and right-of-way,</li><li>Preparation of all pipeline construction drawings,</li><li>Detailed design of all crossings,</li><li>Detailed design of Cathodic Protection System,</li><li>Preparation and implementation of the Hydrostatic Test Procedure,</li><li>Preparation of the as-built drawings.<br/></li></ul><p>CROSSINGS<br/></p><p>On the route, 28 Aramco Oil Transmission Pipelines have been crossed. Additionally, a twin 60” SWCC A and B lines, brine water line of Sadaf Plant in Jubail Area and twin 40” asbestos-cement water pipelines supplying Riyadh in Wasia Area have been crossed.<br/></p><p>Al Jubail - Abu Hadriyah 6 lane expressway, Aramco’s heavy lift roads and several local roads of different sizes have also been crossed along the route.<br/></p><p>In the rocky sections towards Riyadh, approximately 20 valleys have been crossed at extra depth and surface erosion protection was applied according to the specifications.<br/></p><p>A WORLD RECORD IN PIPELINE CONSTRUCTION<br/></p><p>Automatic welding technique was used on all joints (other than tie-ins) and average daily production of one shift has ranged between 40 and 50 welds. On one exceptional day, October 31, 1988, front-end welding crew completed 130 joints (60” / 15,88 mm); project was completed and delivered to the Client as scheduled.</p>","text_promotion":""},{"id":16,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline-generic_tJ4GHnS.png","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline-generic_tJ4GHnS.png"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline-generic_tJ4GHnS.png","commence":"18-10-1992","complete":"15-06-1993","title":"Aramco Hawiyah Area Gas Pipeline","slug":"aramco-hawiyah-area-gas-pipeline","job_no":"179","portion":100.0,"client":"Saudi Aramco","latitude":24.803847,"longitude":49.352624,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>The project consists of:<br/></p><ul><li>The construction of 32” x 47 km and 20” x 8,5 km, high pressure (600 psig), gas pipeline system in the Hawiyah Area,</li><li>Upgrading of piping and instrumentation associated with the two Utmaniyah Gas Plant slug catchers,</li><li>30 road crossing of which 4 were made by thrust boring,</li><li>21 power line and 3 buried cable crossings,</li><li>52 underground and above ground pipeline crossings.<br/></li></ul><p>In this project another important task was to change the 42” Gate Valve in the Utmaniyah Gas Plant during the operation of the Plant.<br/></p><p>Due to very tight schedule and inconvenient placement of the valve, a special steel structure was designed and erected.<br/></p><p>Hot-tap and stopple operation was carried out by Tekfen’s specialized crew and the valve was changed with a successful operation in a very short time providing the client normal conditions of operation as per their schedule.</p>","text_promotion":""},{"id":17,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0011_211_lSMRjkx.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0011_211_lSMRjkx.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/211-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/211-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/211-1.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/211.jpg","commence":"25-03-1997","complete":"08-03-2002","title":"Eastern Province Water Transmission System","slug":"eastern-province-water-transmission-system","job_no":"211","portion":100.0,"client":"SWCC, Saline Water Conversion Corporation","latitude":26.221096,"longitude":50.19663,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>KSA Al Khobar (Al Aziziah) Desalination Plant has sea water treatment capacity of 432.000 m<sup>3</sup> / day.<br/></p><p>Eastern Province Water Transmission Project transmits and distributes the increased (desalinated) sea water capacity to the cities of Al Khobar, Dhahran, Dammam, Qatif, Sayhat, Safwa and Ras Tanurah.<br/></p><p>The EPC project comprises of approximately 127 km of PE coated and CM lined carbon steel pipeline, diameters ranging from 24” to 60” with 7 underground Line Valves, 80 Drain &amp; Vent and 70 Cathodic Protection Stations, modification of 7 Blending Stations and Expansion of Al Aziziah Pump Station.<br/></p><p>The project’s scope covered basic / detail design and engineering works, procurement of the pipes, equipment and consumables, all construction activities including electrical and instrumentation works, control and SCADA systems.<br/></p><p>Main components of the project also include:<br/></p><ul><li>Installation of 3 new pump units each 850 kW. Design and erection of a 1.200 m<sup>3</sup> surge vessel plant,</li><li>2 Units of 15,75 kV / 6,6 kV / 30 MVA substations with 15,75 kV / 1.200 kA Switchgear System,</li><li>Control Center connecting the power, pumping, valve and blending stations by a Fiberoptic Telecommunication System in full automation.</li></ul>","text_promotion":""},{"id":18,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0010_218_PDLdKyB.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/218-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/218-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/218.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/218.jpg","commence":"09-04-1997","complete":"31-12-2001","title":"Western Province Water Transmission System","slug":"western-province-water-transmission-system","job_no":"218","portion":100.0,"client":"SWCC, Saline Water Conversion Corporation","latitude":21.492496,"longitude":39.184792,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>KSA Shoaibah Desalination Plant has seawater treatment capacity of 249.000 m3 / day.<br/></p><p>Western Province Water Transmission System comprises of 60” x 164 km steel pipeline delivering potable water from Shoibah Desalination Plant to storage, blending and distribution plants at Jeddah.<br/></p><p>The project has been another successful accomplishment of Tekfen under the harsh and challenging desert conditions of Saudi Arabia.<br/></p><p>Project includes steel pipeline construction with Cement Mortar Lining and 3-layer Polyethylene coating; wall thickness ranging from 4,5” to 6,3”; API 5L Grade X-60 Steel pipes were used.<br/></p><p>Work scope also included construction and installation of Line Valves and Cathodic Protection System.</p>","text_promotion":""},{"id":19,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline-generic_tJ4GHnS.png","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline-generic_tJ4GHnS.png"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline-generic_tJ4GHnS.png","commence":"17-12-2000","complete":"30-06-2002","title":"Juaymah Gas Plant To Berri Ethane Pipeline","slug":"juaymah-gas-plant-berri-ethane-pipeline","job_no":"255","portion":100.0,"client":"Saudi Arabian Oil Company (Saudi Aramco)","latitude":26.754203,"longitude":49.905704,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>The scope of the project covers;<br/></p><ul><li>Construction of (Fusion Bonded Epoxy, FBE coated) buried 38’’ x 36 km and 30’’ x 0,47 km pipelines from Juaymah to Berri Junction,</li><li>Above ground (painted) 20’’ x 0,580 km and 16’’ x 1,90 km loop lines at Royal Commission Area and installation of by-pass line 20’’ x 0,580 km at Berri Junction,</li><li>Upgrading of piping at Juaymah Gas Plant and Berri Junction,</li><li>Procurement of (below 24’’ dia) pipes, fittings and valves.<br/></li></ul><p>High amount of Hot Tap and Stopple Operations was a challenging aspect of the project.<br/></p><p>TEKFEN was able to prove its skills and capability once again coping with S. Aramco’s high engineering, construction and safety standards.</p>","text_promotion":""},{"id":20,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0009_256_PH9ELxr.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/256.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/256-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/256-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/256-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/256-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/256-5.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/256.jpg","commence":"01-08-2001","complete":"30-06-2003","title":"Haradh Gas Plant, Downstream Gas And Condensate Pipelines","slug":"haradh-gas-plant-downstream-gas-and-condensate-pipelines","job_no":"256","portion":70.0,"client":"Saudi Arabian Oil Company (Saudi Aramco)","latitude":24.146948,"longitude":49.05343,"contractor":"Technip-Germany (Tekfen Construction and Installation Co., Inc.; Lump Sum-under service agreement with Technip)","description":"<p>The scope of the project covers;<br/></p><ul><li>Construction of (Fusion Bonded Epoxy, FBE coated) buried 18’’ x 101 km and 24’’ x 128 km pipelines between Haradh and Abqaiq Plants;</li><li>48’’ x 142 km pipeline from Haradh Gas Plant to Uthmaniyah Scraper Facilities; 48’’ x 57 km pipeline from Uthmaniyah to Berri Gas Plant; 56’’ x 151 km pipeline from Shedgum to E/W Pipeline Pumping Stations 1 &amp; 3, 56’’ x 46 km pipeline from Uthmaniyah to Berri Junction. Above ground (painted)</li><li>42’’ x 4,3 km pipeline from Jubail interface to Royal Commission.<br/></li></ul><p>This challenging project was a high performance work proving TEKFEN’s skills and capability once again in the conditions of the Gulf Area; over 600 km of pipeline (26 Million inch-m) welding and laying work was successfully delivered within 16 months’ period.<br/></p><p>Saudi Aramco is one of the most demanding companies of the world working with very high Safety Standards; TEKFEN was able to cope with the given time schedule while complying with S. Aramco’s high engineering, construction and safety standards.</p>","text_promotion":""},{"id":21,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline-generic_tJ4GHnS.png","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline-generic_tJ4GHnS.png"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline-generic_tJ4GHnS.png","commence":"15-03-2004","complete":"31-12-2005","title":"Quad - 1 Pipeline For Ain Dar & Shedgum Seawater Conversion System","slug":"quad-1-pipeline-ain-dar-shedgum-seawater-conversion-system","job_no":"284","portion":100.0,"client":"Saudi Arabian Oil Company (Saudi Aramco)","latitude":25.822398,"longitude":49.337763,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Ain Dar and Shedgum lie on the inner eastern deserts of Saudi Arabia on Ghawar Oil Fields, by far the world&#x27;s largest conventional oil field accounting for more than half of Saudi Arabia&#x27;s cumulative oil production. Although it is a single field, it is divided into six areas: Fazran, Ain Dar, Shedgum, Utmaniyah, Haradh and Hawiyah.<br/></p><p>Tekfen has been active in the area as a successful hydrocarbon and civil projects contractor since the beginning of the 80&#x27;s.<br/></p><p>78,2 km x 56&quot; QUAD-1 Pipeline connects Qurayah Desalination Plant to the Water Injection Plant at Ain Dar. North Ain Dar Injection Header extends as a 32,8 km pipeline with dia. range between 10&quot;and 30&quot; whereas the Central Header lies on 4,3 km with a 16&quot; dia. The system also includes Surge Tank Facilities and Scraper Trap relocation.</p>","text_promotion":""},{"id":22,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/126.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/126.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/126.jpg","commence":"23-11-1984","complete":"01-12-1991","title":"Taif Sewerage And Storm Water System","slug":"taif-sewerage-and-storm-water-system","job_no":"126","portion":100.0,"client":"Ministry of Municipal and Rural Affairs, Water and Sewage Department","latitude":21.279434,"longitude":40.401481,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Taif Sewerage and Storm Water System Project, a challenging &quot;inner city&quot; task undertaken by Tekfen, was successfully accomplished despite major urban restrictions.<br/></p><p>The project comprises of the construction of potable water supply system of 283.600 m, non-potable water supply system of 304.500 m, sanitary sewer system of 252.030 m and storm water disposal system of 31.800 m.<br/></p><p>The details of the project are as follows:<br/></p><ul><li>Potable Water Supply System<br/> - 80.000 m of 300 mm - 600 mm ductile iron main pipeline<br/> - 124.000 m of 100 mm - 200 mm ductile iron distribution pipeline<br/> - 71.500 m of 50 mm - 80 mm PE service pipeline<br/></li><li>Non-Potable Water Supply System<br/> - 35.600 m of 300 mm - 800 mm steel main pipeline<br/> - 189.700 m of 75 mm - 200 mm PVC distribution pipeline<br/> - 79.200 m of 25 mm - 80 mm PVC service pipeline<br/></li><li>For Water Supply System<br/> - 13.310 m boxes for house connections<br/> - 600 fire hydrants<br/> - 3.915 valves<br/></li><li>Sanitary Sewer System<br/> - 160.900 m at 250 mm - 400 mm vitrified clay main and trunk gravity sewers<br/> - 11.930 m at 500 mm - 1400 mm GRP main trunk gravity sewers<br/> - 79.200 m at 150 mm - 20 mm vitrified clay house connection<br/> - 4.650 manholes<br/></li><li>Storm Water Disposal System<br/> - 4.200 m at concrete box culverts<br/> - 27.600 m at 300 mm - 2000 mm asbestos cement pipes<br/> - 400 storm water inlets<br/> - 350 manholes</li></ul>","text_promotion":""},{"id":23,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline-generic_tJ4GHnS.png","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline-generic_tJ4GHnS.png"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline-generic_tJ4GHnS.png","commence":"15-11-2016","complete":"31-12-2021","title":"Yanbu - North Jeddah Pipelines Project","slug":"yanbu-north-jeddah-pipelines-project","job_no":"352","portion":100.0,"client":"Saudi Arabian Oil Company (Saudi Aramco)","latitude":24.101107,"longitude":38.139543,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p></p><p>Yanbu Jeddah Pipelines Project is a Lumpsum Turnkey Project including engineering, procurement (except main pipelines’ pipes) and construction works. Project consists of two parallel pipelines (339 km 20”/YNJ-1 and 339 km 24”/YNJ-2). The purpose of the project is to efficiently meet the increasing refined product demands in Makkah Province.</p><p>Constructed pipelines (YNJ-1 &amp; YNJ-2) with ultimate capacity of 577 thousand barrels (240 thousand barrels/YNJ-1 &amp; 337 thousand barrels/YNJ-2) will deliver refined products from Yanbu Distribution Hub to North Jeddah Bulk Plant facility.</p><p>The pipelines shall use a dual pipeline arrangement to deliver two grades of gasoline (PG91 &amp; PG95) with YNJ-1 and refined products (ULSD and Jet A-1) with YNJ-2.</p><p></p><p>FACTS AND FIGURES<br/> • 2 nos Pig Receiver Stations <br/> • 2 nos Pig Launcher Stations <br/> • 6 nos Underground Valve Stations<br/> • 2 nos Aboveground Valve Stations<br/> • 3 nos Railway Crossings<br/> • 14 nos Trenchless Road Crossings <br/> • 23 nos Open-cut Road Crossings<br/></p><p>The main works and the relevant quantities: <br/> • Excavation: 2.253.623 m<sup>3</sup><br/> • Bedding and Padding: 848.068 m<sup>3</sup><br/> • Backfilling: 858.244 m<sup>3</sup><br/> • Reinforced Concrete: 9.810 m<sup>3</sup><br/> • Fiber Optic Cable: 360.685 m<br/> • Automatic Welding: 25.445 joints<br/> • Manuel Welding: 1.892 joints<br/> • Joint Coating: 28.217 joints</p>","text_promotion":""},{"id":24,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/Haradh_pipeline_1.jpeg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/Haradh_pipeline_1.jpeg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/Haradh_pipeline_1.jpeg","commence":"24-06-2018","complete":"29-11-2023","title":"Satellite Gas Compressor Pipelines Project","slug":"satellite-gas-compressor-pipelines-project","job_no":"367","portion":100.0,"client":"Saudi Aramco","latitude":24.0579,"longitude":49.20183,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Saudi Aramco is installing gas compression facilities at Haradh &amp; Hawiyah Saudi Arabia under the Southern Area Energy Efficiency Program. The Program in Southern Area provides for improving and sustaining gas production from Haradh and Hawiyah fields by reducing choke pressure at the wellhead to 300 pounds per square inch gauge (psig). The program will extend plateau life at the same production rates for both fields for the next 20 years. The program will also provide for boosting the production by around 1.3 billion standard cubic feet per day supplementing sales gas and condensate production.</p><p>As part of the Program, the Satellite GCP Pipelines Project will be constructed in the vicinity of the Saudi Aramco Haradh Field near to the Haradh Gas Plant which is located in the Southern Area of the Eastern Province of Saudi Arabia. Project includes a combination of Greenfield / Brownfield work within a large and remote geographic operating area.</p><p></p><p><b>FACTS AND FIGURES</b></p><p>The project consists of following Construction, </p><ul><li>Pipeline Construction. (Metallic &amp; Non-metallic)</li><li>OPTF Construction</li><li>Well Head Modification.</li><li>New Remote Header Constructions and Existing Remote Header Modifications.</li><li>Gas Gathering Manifolds Construction.</li><li>Liquid Separation Station Construction.</li><li>Main line Valve Station Construction.</li><li>Gas Compression Plant Construction.</li><li>Over Head Pipeline Construction.</li><li>Security &amp; Operation Buildings Construction.</li><li>Mothballing Works.</li><li>Commissioning Support<br/></li></ul><p><b>The main works and the relevant quantities:</b></p><ul><li>Total pipe length: 1107 Km.</li><li>Pipe Diameter: (4”-6’’): 177 km, (8”-10”): 388Km, (12”-24”):499Km, (30’’- 40’’):43Km.</li><li>OPTF flowline connectivity:60</li><li>Remote headers (new 6 ea and existing 11 ea) : 17 ea</li><li>New Gas Gathering Manifolds:1</li><li>LSS (inlet/outlet pipeline tie ins only):4</li><li>Compressor Stations LSS (inlet/outlet pipeline tie ins only):3</li><li>MLV Stations:7</li><li>Scraper Launcher and Receivers: 53 nos.</li><li>Well Heads to be modified: 130 nos.</li><li>Total FOC length to be laid: 132 km.</li><li>Total Major Crossing: 84 nos.<ul><li>Total Road Crossing: 79 nos.</li><li>Total Rail Crossing: 5 nos.</li></ul></li><li>Total Minor Crossing”: 2,279 nos.</li><li>Total Earthworks: 3.05 mio. m3</li><li>Total Spool Installation: 104,070 WDI</li><li>Total Installation of Steel Work: 3130 MT</li></ul>","text_promotion":""},{"id":25,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0007_299_DkXZD59.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Sultanate of Oman","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/299.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/299-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/299-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/299-3.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/299.jpg","commence":"17-12-2005","complete":"07-12-2010","title":"Harweel Cluster Phase Ii Facilities, Gas & Oil Pipeline","slug":"harweel-cluster-phase-ii-facilities-gas-oil-pipeline","job_no":"299","portion":100.0,"client":"Petroleum Development Oman, PDO - Petrofac","latitude":17.910102,"longitude":54.756466,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Harweel Cluster Phase II, the inaugural contract of Tekfen in The Sultanate of Oman is an EPC development scheme of Petroleum Development Oman.<br/></p><p>The main contractor being Petrofac International, Tekfen has undertaken detail engineering and construction works of 168 km of 14 carbon steel (6&quot; to 18&quot; dia.) and corrosion resistant alloy (14&quot; &amp; 16&quot; dia.) flow lines, trunk lines and main pipeline system for gas and oil.</p><p>HIGHLIGHTS<br/></p><ul><li>18&quot; Oil Export Line: 89 km</li><li>16&quot; Gas Export Line: 28 km</li><li>10&quot; Gas Injection Line: 7 km</li><li>6&quot; Sour Water Injection Line: 4 km</li><li>8&quot; Trunkline: 1 km</li><li>5 x 6&quot; Gas Injection Line: 11 km</li><li>14&quot; &amp; 16&quot; CRA Lines: 28 km</li></ul>","text_promotion":""},{"id":26,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0006_64_1_uRvLsYT.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0006_64_1_uRvLsYT.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0006_64_1_uRvLsYT.jpg","commence":"07-04-1975","complete":"08-05-1977","title":"First Iraq - Turkey Crude Oil Pipeline, Turkish Section","slug":"first-iraq-turkey-crude-oil-pipeline-turkish-section","job_no":"64","portion":100.0,"client":"BOTAŞ, Petroleum Pipelines Corporation","latitude":36.773244,"longitude":35.776393,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Iraq - Turkey Crude Oil Pipeline, one of the two major export routes of Iraq, transports the crude oil mainly produced in Kirkuk Area, north of Iraq. 986 km long First Pipeline System has an annual transport capacity of 35 million t. Out of 986 km, 345 km section is in Iraq and the remaining 641 km section is in Turkey, reaching Ceyhan export terminal situated in the south of Turkey, on the Mediterranean Coast. Tekfen undertook the construction of two sub-sections of 70 km and 85 km crude oil pipeline system within Turkey and successfully delivered according to the schedule.</p><p></p><p><b>SCOPE OF WORKS</b></p><p></p><p>1- The 84 km section between Bahçe - Yumurtalık<br/> (Job No: 64, US$ 10.924.396)</p><ul><li>Construction of 30” x 84 km section between kp 557 and kp 641,</li><li>Opening 25 m wide right-of-way,</li><li>Transportation of pipes from İskenderun Port and stringing along right-of-way,</li><li>Ditching,</li><li>Pipe bending,</li><li>Welding,</li><li>X-ray of welds,</li><li>Coating and lowering-in,</li><li>Backfilling,</li><li>Hydrostatic testing,</li><li>Installation of cathodic protection,</li><li>Preparation of service roads,</li><li>Cleaning-up,</li><li>3 rail road crossing,</li><li>8 highway crossing,</li><li>15 km long concrete enveloped section in river bed.</li></ul><p>2- The 70 km section between Mazıdağı - Ömerli<br/> (Job No: 65, US$ 3.958.845)</p><ul><li>Construction of 40” x 70 km section between kp 150 and kp 220,</li><li>Pipe Bending,</li><li>Welding,</li><li>X-ray of welds,</li><li>Coating and lowering-in,</li><li>Installation of cathodic protection.</li></ul>","text_promotion":""},{"id":27,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0005_115_jk2LUix.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0005_115_jk2LUix.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0005_115_jk2LUix.jpg","commence":"24-05-1983","complete":"15-02-1986","title":"Yumurtalik - Kirikkale Crude Oil Pipeline","slug":"yumurtalik-kirikkale-crude-oil-pipeline","job_no":"115","portion":100.0,"client":"BOTAŞ, Petroleum Pipelines Corporation","latitude":36.773244,"longitude":35.776393,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>The scope of this major pipeline project, accomplished by Tekfen, in Turkey, covers engineering, procurement and construction works of 24” x 457 km crude oil transmission line including a 3 x 50.000 m3 capacity floating roof tankage system and 2 pump stations.<br/></p><p>API 5LS X-60 pipes with wall thicknesses ranging from 6,35 mm to 11,92 mm were used. Part of the terrain crossed was a 57 km long special zone, where the pipes were transported by a special overhead cable lifting system over the steep slopes.<br/></p><p>The pipeline which supplies crude oil from Ceyhan, where the terminal of the Iraq - Turkey Pipeline System is, to Central Anatolian Refinery, crosses rough and rocky area of the Toros Mountains which stretch through southern Turkey parallel to the Mediterranean Coast. The project’s financing was also arranged by Tekfen.</p>","text_promotion":""},{"id":28,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/BTC_Pipeline_Night_-_Horizontal_doublespread_or_smaller_use.jpg","project_type":{"title":"Repair, Maintenance And O&M Services","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-repair.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/BTC_Pipeline_Night_-_Horizontal_doublespread_or_smaller_use.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/BTC_Pipeline_Night_-_Horizontal_doublespread_or_smaller_use.jpg","commence":"30-10-2007","complete":"12-09-2016","title":"Provision Of Pipeline Repair Services","slug":"provision-pipeline-repair-services","job_no":"308","portion":100.0,"client":"The Baku-Tbilisi-Ceyhan Pipeline Company - Turkey Branch","latitude":36.768695,"longitude":35.789977,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Within Project308, 1.2 Capacity Expansion System via Drag Reducing Agent (DRA) project has been performed in order to improve the flow capacity of the pipeline up to 1.2 million barrels at all of the pump stations and block valve terminals over the BTC Crude Oil Pipeline. Final acceptance of the project was issued on 15 September 2010.<br/></p><p>Within Project313 - Enhancement project, in addition to construction of IDS, camera systems, access control systems, sliding gates, road blockers and security buildings on behalf of improved security, also some auxiliary buildings, patrol roads and lighting, fire&amp;gas systems, pig cleaning stations, oily seperator systems, earthing systems, illimunated buoys etc. have been constructed over the BTC Crude Oil Pipeline as well as power backup&amp; compensation and pump&amp;valve changeout works. Finall acceptance of all enhancement works was issued on 10 December 2010.<br/></p><p>Within Project318, Security Upgrade &amp; Reinstatement project has been completed at BVT30 valve terminal. Provisional acceptance of all enhancement works was issued on 15 December 2010.<br/></p><p>Within Project315 – Repair and Enhancement project, miscellaneous repair works have been performed under the umbrealla contract with Call off orders over the BTC Pipeline, Turkish Section. There has been a total of 37 call of orders as of April 2011, which included engineering services by Tekfen Muhendislik, and various Civil, Mechanical, Electrical and instrumentation, security systems works. The Project315 has been completed by the end of 2013 during which 105 Call offs issued. Project315 includes main oil pipeline rerouting and bypass, main oil line dent repairs, Fortifications and Security Systems at Block Valve stations, valve changeouts, piping works and shutdown activities at Pump Stations and Intermediate Pigging Stations geohazard improvement works at rivercrossings and landslide areas over the pipeline, Pump stations and Block Valve subsidence works. The Provisional and Final acceptances certificates are being obtained for each Call off scope as they are completed.<br/></p><p>Project340 the new Repair and Enchancement Contract was signed with BTC Co. on September 11th, 2013 and related Call offs had been issued by the beginning of year 2014. Similiar to Project315, Project340 scope also includes main oil pipeline rerouting and bypass, main oil line dent repairs, Fortifications and Security Systems at Block Valve stations, valve changeouts, piping works and shutdown activities at Pump Stations and Intermediate Pigging Stations geohazard improvement works at rivercrossings and landslide areas over the pipeline, Pump stations and Block Valve subsidence works. The contract for Project340 will be expired by September 12th, 2016.<br/></p><p><b>MAIN PROJECT WORK VOLUMES:</b></p><ul><li>3.000.000 Manhour (Direct + Indirect Manpower)</li><li>Main pipeline Reroute and bypass at 2 locations</li><li>Enchancements at Pump stations, Pigging stations and Marine Terminal (8 locations)</li><li>200.000 m3 Riprap works</li><li>Block Valve Fortification works at 18 ea</li><li>Block Valve Subsidence works 5 ea</li><li>Landslide goehazard improvements at 6 loc.</li><li>Rivercrossing geohazard improvement works 52 loc.</li><li>Valve changeout and piping works at 6 loc.</li><li>Shutdown Activities 15 ea at 32 loc.</li><li>Total 120 ea Call offs at 96 different loc.</li></ul><p></p><p><b>WORK LOCATIONS:</b></p><p><br/>The projects are being performed at several locations on the pipeline &amp; Pump stations &amp; Block Valve stations etc. When the pipeline is operating.<br/></p><ul><li>Pump Station PT-1, PT-2, PT-3, PT-4,</li><li>Intermediate Pigging Stations IPT-1, IPT-2,</li><li>Marine Terminal CMT,</li><li>Block Valve stations: 51 ea</li><li>All along the BTC Co. Crude Oil pipeline Turkish Branch 1.076 km.</li></ul>","text_promotion":""},{"id":30,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0003_346_DfcrT5W.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0003_346_DfcrT5W.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/203-GS8_4120.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/DJI_0002.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/160-GS7_4309.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/155-GS8_4906.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/117-TANAP-1016-14.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/113-DSC_6698.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/103-DSC_6676.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0003_346_DfcrT5W.jpg","commence":"28-01-2015","complete":"25-12-2017","title":"Tanap Trans Anatolian Natural Gas Pipeline Project– Lot 3","slug":"tanap-trans-anatolian-natural-gas-pipeline-project-lot-3","job_no":"346","portion":100.0,"client":"TANAP Doğalgaz İletim A.Ş.","latitude":41.58383,"longitude":42.818105,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<h3><a href=\"https://youtu.be/3oFROGxhXpg\">Project Movie »</a></h3><p></p><hr/><p><br/></p><p>The TANAP starts from the Georgia/Turkey border at Türkgözü/Posof/Ardahan where it connects to South Caucasus Pipeline (SCP) and ends at the Turkey/Greece border in Ipsala/Edirne, where it feeds into the TAP Pipeline. There is an off-take station at Eskişehir, Turkey, and another one at Thrace, Turkey to connect to the Turkish natural gas distribution network.<br/></p><p>The proposed TANAP Project is a 56-inch and 48-inch pipeline system of 1805 km, and will transport natural gas to the required specifications and quantity. The initial capacity of TANAP is expected to be 16 billion cubic meters (bcm) of gas per year, gradually increasing to 31 bcm. 6 bcma will be delivered to Turkish consumers within Turkey via off-take stations by Gas Transport Agreement (GTA).</p><ul><li>Total pipe length: 513 Km</li><li>Pipe Diameter: 56”</li><li>Nominal capacity: 31 bcma in high-flow case</li><li>Design Pressure: 95,5 barg</li><li>Total FOC conduit length to be laid: 2 x 513 Km</li><li>Pig Launcher and Receiver Stations: 2 nos</li><li>Block Valve Stations: 14 nos in accordance with ASME B31.8, 2012 requirements</li><li>Total Province/Town/Village on the Pipeline Route: 6 province / 21 town / 146 village</li><li>Total Crossing: 1631 nos</li><li>Total Road Crossing: 814 nos</li><li>Total River Crossing: 548 nos</li><li>HDD River Crossing: 2 nos (655m / 657m)</li><li>Total Excavation: 6,6 mio. m3</li></ul>","text_promotion":""},{"id":31,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0002_347_rCFgj8t.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0002_347_rCFgj8t.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/25-GS8_6143.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/37-GS8_6750.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/38-TNP-Damal-34.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/39-TNP-Damal-24.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/28-GS8_6452.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/03-GS8_6185.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/18-TNP-Damal-32.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/13-TNP-Damal-17.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/09-TNP-Damal-9.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/05-TNP-Damal-5.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/21-GS8_6921.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0002_347_rCFgj8t.jpg","commence":"17-02-2016","complete":"31-05-2019","title":"Tanap Trans Anatolian Natural Gas Pipeline Project– Compressor And Metering Stations","slug":"tanap-trans-anatolian-natural-gas-pipeline-project-compressor-and-metering-stations","job_no":"347","portion":100.0,"client":"TANAP Doğalgaz İletim A.Ş.","latitude":41.58383,"longitude":42.818105,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<h3><a href=\"https://youtu.be/YkS8pu_aNGg\">Project Movie 1 »</a> <a href=\"https://youtu.be/QACsVziC92g\">2 »</a></h3><p></p><hr/><p><br/></p><p>The TANAP starts from the Georgia/Turkey border at Türkgözü/Posof/Ardahan where it connects to South Caucasus Pipeline (SCP) and ends at the Turkey/Greece border in Ipsala/Edirne, where it feeds into the TAP Pipeline. There is an off-take station at Eskişehir, Turkey, and another one at Thrace, Turkey to connect to the Turkish natural gas distribution network.<br/></p><p>The TANAP Project is a 56-inch and 48-inch pipeline system of 1805 km, and will transport natural gas to the required specifications and quantity. The initial capacity of TANAP is expectedto be 16 billion cubic meters (bcm) of gas per year, gradually increasing to 31 bcm. 6 bcma will be delivered toTurkish consumers within Turkey via off-take stations by Gas Transport Agreement (GTA).<br/></p><ul><li>Throughput capacity: 6 bcma During Phase 0 of Operation – Supplied to Turkey</li><li>Throughput capacity: 16 bcma During Phase 1 of operation– Supplied to Turkey &amp; Europe</li><li>Number of Compressor Stations (including off-take): 3</li><li>Number of Metering Stations: 4</li><li>Buildings: 105 buildings; 55,000 m<sup>2</sup></li><li>Piping: 14,545 ton</li><li>Equipment installation: 8,050 ton</li><li>Excavation: 1,570,000 m<sup>3</sup></li><li>Backfill: 1,000,000 m<sup>3</sup></li><li>Concrete 81,000 m<sup>3</sup></li><li>Formwork: 255,000 m<sup>2</sup></li><li>Reinforcement Steel: 7,000 ton</li><li>Structural Steel: 8,000 ton</li><li>Instruments: 1,645 ea</li><li>Transformers: 25 ea</li><li>Cabling: 267,350 m</li><li>Complete HVAC and Fire Fighting Works</li></ul>","text_promotion":""},{"id":32,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/363.jpg","project_type":{"title":"Repair, Maintenance And O&M Services","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-repair.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/363.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/363.jpg","commence":"01-02-2018","complete":"30-09-2023","title":"BTC Repair And Enhancement Projects","slug":"btc-repair-and-enhancement-projects","job_no":"363","portion":100.0,"client":"BTC Co.","latitude":36.768387,"longitude":35.788788,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Project 363 BTC Repair and Enhancement Project have been signed on the 1st February of 2018 with the client BTC Co., as a follow up project to Project 340. Tekfen will be responsible for executing many challenging works during the contract period as it has been since 2007. These challenging works will be executed on a very large geography. The contract for Project 363 will be expired by the 1st February of 2021.<br/></p><p>Major works in the scope of Project 363;<br/></p><ul><li>Pipeline Re-routings</li><li>River Crossing Works</li><li>Spool Production - Installation and Valve Replacement Works At Pump Stations</li><li>Seismic Investigation Works</li><li>Perimeter Intruder Detection System Enhancement Works</li><li>Pump Stations Fire Fighting Improvement Works</li><li>Security System (PIDS &amp; CCTV) Enhancement Works</li><li>UPS Replacement Works</li><li>Various Mechanical and Electrical Works on Shutdown Periods<br/></li></ul><p><b>Work Locations</b><br/></p><p>The projects are being performed at several locations on the pipeline &amp; Pump stations &amp; Block Valve stations etc. When the pipeline is operating.<br/></p><ul><li>Pump Station PT-1, PT-2, PT-3, PT-4,</li><li>Intermediate Pigging Stations IPT-1, IPT-2,</li><li>Marine Terminal CMT,</li><li>Block Valve stations: 51 ea</li><li>All along the BTC Co. Crude Oil pipeline Turkish Branch 1.076 km.</li></ul>","text_promotion":""},{"id":33,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0001_327_NbJnq2Y.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Turkmenistan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/327-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/327-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/327-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/327-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/327-5.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline_0001_327_NbJnq2Y.jpg","commence":"28-02-2011","complete":"31-12-2013","title":"Galkynysh Gas Field Development Project","slug":"galkynysh-gas-field-development-project","job_no":"327","portion":100.0,"client":"Petrofac International (UAE) LLC","latitude":37.294562,"longitude":62.366552,"contractor":"Tekfen Construction and Installation Co., Inc., Petrofac UIL","description":"<p>Galkynysh gas field is in Mary region of Turkmenistan. The overall gas development project targets upstream and treatment and downstream works of 40 billion cubic meters natural gas annually.<br/></p><p>Out of this 40 billion cubic meters, the EPC works for 10 billion cubic meters including upstream works, flow lines, trunk lines, GTUs, central gas processing facility and 56” gas export pipeline are under the scope of Petrofac UIL. Accordingly, Tekfen has been awarded for the &quot;utilities and offsites&quot; works of the Central Gas Processing facility including civil, mechanical, electrical and instrumentation works and the installation of the 100 km long 56&quot; cross-country export sales gas pipeline together with assistance to commissioning works after the mechanical completion of the aforementioned works.<br/></p><p><b>Project Major Quantities</b></p><ul><li>Excavation &amp; Backfill: 1.000.000 m<sup>3</sup></li><li>Reinforced Concrete: 25.000 m<sup>3</sup></li><li>Building: 1.300 m2 Central Control Room (EPC)</li><li>Steel Structure Erection: 6.100 Ton</li><li>Tank Erection: 3.143 ton</li><li>Other Static Equipment Erection: 4.735 ton</li><li>Rotating Equipment Erection: 2.300 ton</li><li>Plant Piping Erection: 129.000 Dia inch; 4,620 ton</li><li>Sales Gas Export Pipeline: 100 Km Cross-country 56&quot; pipeline</li><li>River Crossing: 1 nos. (850 m 56” HDD)</li><li>Electrical Cabling: 650 Km</li><li>Telecom Cabling: 57 Km</li><li>Instrumentation Cabling: 345 Km</li><li>Fiber Optic Cabling: 100 Km</li><li>Pipe Insulation: 33,700 m<sup>2</sup></li><li>Equipment Insulation: 19,270 m<sup>2</sup></li></ul>","text_promotion":""},{"id":34,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/topside-generic.png","project_type":{"title":"Topside / Offshore Platform & Modules","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-topside.png"},"project_status":"Completed","project_location":"Azerbaijan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/237_1.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/237_1.jpg","commence":"05-08-1999","complete":"31-01-2000","title":"Chiraq-1 Platform Fabrication And Assembly Of Water Injection Module","slug":"chiraq-1-platform-fabrication-and-assembly-water-injection-module","job_no":"237","portion":50.0,"client":"AIOC, Azerbaijan International Operating Company","latitude":39.893257,"longitude":50.909376,"contractor":"Tekfen Construction and Installation Co., Inc. - Azfen Alliance (TKAZ)","description":"<p>The Chiraq Offshore Oil Field is located 120 km south-east of Baku in the Caspian Sea. The platform was commissioned in November 1997. In order to maintain reservoir pressure a water injection system was designed and installed at the “live” platform.<br/></p><p>The project scope covers fabrication of 150.446 t of steel piping, 916 m of GRE (Glass Reinforced Epoxy) Piping and 255 t of structural steel for Chiraq-1 Water Injection Module of AIOC.<br/></p><p>The water injection system has capacity of 220.000 bwpd at a pressure of 32.000 kPa and the designed system is within the 600 t total weight limit.</p><p></p><p><b>Fabrication and assembly scope of work consists of the following items:</b></p><ul><li>Material handling and management of storage facilities and all associated plant and equipment,</li><li>Establish and maintain a program for onshore fabrication and assembly works, comprising a three level program with 3.222 activities,</li><li>Produce welding qualification specifications; apply various systems including “Gas Shielded Flux Core Arc Welding”,</li><li>Special training for GRE piping installation.</li><li>Fabrication pipe spools, including carbon steel and galvanized steel. Fabrication of GRE spools,</li><li>Fabrication of supporting steel,</li><li>Fabrication of structural steel including equipment base frames,</li><li>Installation of Turbine and Pumps (2 x 47 t) on the module structure,</li><li>Installation of LER (16 t) on the module structure,</li><li>Installation of heat exchanger and shut down valves on the module, fabrication of turbine exhaust tower,</li><li>Installation of turbine inlet and outlet ductwork on the module &amp; supply of manpower for offshore installation works and onshore electrical instrumentation works,</li><li>Quality Assurance and Control of the onshore fabrication works and preparation of the fabrication certifications,</li><li>The repair rates for carbon steel welding and structural steel were 0,44% and 2,10% respectively while no repair was necessary for GRE pipes,</li><li>Stress relieving of the heavy wall pipe-work, hydro-testing and painting of all steel surfaces, preparation and submission of all testing and fabrication certificates,</li><li>Offshore installation &amp; assembly of fabricated spools and structural steel.</li></ul>","text_promotion":""},{"id":35,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/plant_0024_leuna.jpg","project_type":{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},"project_status":"Completed","project_location":"Germany","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/plant_0024_leuna.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/leuna-cover.jpg","commence":"15-03-1995","complete":"30-09-1997","title":"Leuna 2000 Refinery","slug":"leuna-2000-refinery","job_no":"0","portion":100.0,"client":"Thyssen-Lurgi-Technip J.V","latitude":51.324067,"longitude":12.024311,"contractor":"HMB * Hallesche Mitteldeutsche Bau AG form Germany is a 100% subsidiary of Tekfen","description":"<p>Grass root construction of the Leuna 2000 Refinery in Germany represents one of the largest industrial projects undertaken at the end of the 20th century. Following the country&#x27;s reunification in 1990, Elf Aquitaine had purchased Minol, the state concern for storage, transportation and distribution of oil products in the former East- Germany, subsequently getting permission to build a new refinery to replace the two outdated refineries of Leuna and Zeitz.<br/></p><p>HMB - Hallesche Mitteldeutsche Bau AG, Tekfen&#x27;s 100% owned subsidiary in Germany, undertook to perform majority of the civil works at the Refinery and tank farm units, as well as engineering, procurement and construction of 7 satellite control buildings; the works were awarded to HMB in two separate contracts by the main contracting group Thyssen - Lurgi - Technip J.V. in March&#x27;95.<br/></p><p>The work scope also included construction of pipe racks, pipeways, culverts, ducts and underground utility piping of the Refinery. The contractual obligations of HMB were successfully fulfilled at the end of September&#x27;97.<br/></p><p>Located at the center of a demanding and quality conscious market, Leuna 2000 Refinery became one of Europe&#x27;s most modern and environmentally friendly oil processing plants, with an annual crude oil processing capacity of 10 million t.<br/></p><p><b>HIGHLIGHTS</b></p><ul><li>15 Road Culverts,</li><li>15 km of Plant Roads,</li><li>7 Satellite Control Center Buildings,</li><li>Foundations for 13 ea Pumping Stations,</li><li>15 km of Drainage Ditches,</li><li>150.000 m<sup>2</sup> of Gravelled Areas,</li><li>1 km<sup>2</sup> of Earth Works / Levelling,</li><li>2,5 km of Pipe Racks,</li><li>40 Fire Protection Walls,</li><li>16 km of GR Fire Fighting Piping Systems,</li><li>14,6 km of Concrete DA Underground Oil-Contaminated Water Pipeline,</li><li>8 km of HDPE Underground Pressure Piping,</li><li>500 Firewater, 200 Waste Oil &amp; 300 Rain Water Manholes,</li><li>10.000 m<sup>2</sup> of Concrete Paving,</li><li>100 Pits for Storage Tanks,</li><li>11,5 km of Pipe Support Foundations,</li><li>3,5 km of Surface Water Drainage,</li><li>5 km of Drinking Water Piping.</li></ul>","text_promotion":""},{"id":36,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/plant_0023_330.jpg","project_type":{"title":"Project Management","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-project-management.png"},"project_status":"Completed","project_location":"Iraq","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/330-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/330-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/330-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/330-4.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/330.jpg","commence":"13-05-2011","complete":"31-12-2014","title":"Rumaila Field Development Project Provision Of Engineering And Project Management Services","slug":"rumaila-field-development-project-provision-engineering-and-project-management-services","job_no":"330","portion":100.0,"client":"BP Iraq, NV","latitude":33.884095,"longitude":43.663611,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Provision of Project Management Services for Rumaila Oil Field is Tekfen’s first job in the discipline of project management.<br/></p><p>Within Project 330, Project Management, General Construction Management, and Engineering Services are provided to BP Iraq, NV and Rumaila Operating Organization for the Rehabilitation and Expansion Project of the Rumaila Oil Field. General Construction Management Services include detailed design and engineering and project management for flowlines, temporary power generation of electrical submerged pump oil wells, repairs and/or installation of crude oil tanks, and rehabilitation of systems within degassing stations. Management Services for the construction and repair jobs of crude oil flowlines and storage tanks, Water Treatment Facility improvements, water pipeline construction, clustre pump stationrepairs, well water injection pipelines construction, Quality Assurance and Quality Control services are also being performed with this project.<br/></p><p><b>WORK LOCATIONS:</b><br/></p><p>Project Management and Quality Assurance and Quality Control tasks are being performed on a number of well heads, flowlines, and degassing Stations as wells as technical office functions such as project planning, and administritive functions in order to support the client with the rehabilitation and development of the oil field. Below are the work locations at which field tasks are accomplished.</p><ul><li>North Rumaila Oil Field Degassing Stations: DS 1, DS 2, DS3, DS4, DS 5</li><li>South Rumaila Oil Field Degassing Stations: Qurainat, Shamia, Rumaila, Janubia, Ratqa</li><li>Flowlines-Free Flow: Wellhead tie-ins, flowlines, and degassing station tie-ins of free flow oil wells</li><li>Flowlines-ESP: Wellhead tie-ins, and flowlines of ESP oil wells (125 Wells, 500 km 6”/8”)</li><li>Qarmat Ali Water Treatment Plant, water pipeline 48”/30”/18”, cluster pump stations (CPS-1,2,.....5) and well water injection pipelines</li></ul>","text_promotion":""},{"id":37,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/281-cover.jpg","project_type":{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},"project_status":"Completed","project_location":"Kazakhstan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/281.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/281-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/281-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/281-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/281-4.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/281.jpg","commence":"11-05-2004","complete":"30-11-2005","title":"Atyrau Refinery, Reconstruction Works","slug":"atyrau-refinery-reconstruction-works","job_no":"281","portion":50.0,"client":"KazMunaiGaz, Kazakhstan Oil & Gas Company","latitude":47.097991,"longitude":51.930114,"contractor":"GATE (Tekfen Construction and Installation Co., Inc. - Gama) as cooperating partner of JGC, Japan","description":"<p>GATE, a partnership of Tekfen &amp; Gama has undertaken Atyrau Refinery Reconstruction (ARR) Project in Kazakhstan in partnership with the JGC of Japan.<br/></p><p>The purpose of the project is to modernize the existing Gasoline and Sulphur Units in the Refinery in order to increase the production to 6 mtpa and enhance the quality of the products.<br/></p><p>The project scope includes civil, mechanical, electrical and instrumentation works.<br/></p><p><b>HIGHLIGHTS</b></p><ul><li>Pile Head Treatment: 1.380</li><li>Excavation: 10.200 m<sup>3</sup></li><li>Structural Concrete: 6.500 m<sup>3</sup></li><li>Reinforcing Steel: 1.000 t</li><li>Forming: 25.000 m<sup>2</sup></li><li>Paving: 20.500 m<sup>2</sup></li><li>Steel Fabrication: 1.650 t</li><li>Steel Erection: 1.650 t</li><li>Claddings: 6.000 m<sup>2</sup></li><li>Equipment Erection: 3.500 t</li><li>Prefabrication (Piping): 160.000 wid</li><li>Erection (Piping): 80.000 wid</li><li>Pipe Support Fabrication: 153 t</li><li>Radiographic Film (Piping): 83.000 sheet</li><li>Equipment Insulation: 2.500 m<sup>2</sup></li><li>Piping Insulation: 151.500 I.M</li><li>Blasting &amp; Priming: 41.000 m<sup>2</sup></li><li>Finish Painting: 59.000 m<sup>2</sup></li><li>Central Control Building: 576 m<sup>2</sup></li><li>Sulphur Solidification Building: 469 m<sup>2</sup></li><li>Modification of AT-2 Room: 1.548 m<sup>2</sup></li><li>Floor Heatings: 149 m<sup>2</sup></li></ul>","text_promotion":""},{"id":38,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/294-295-cover.jpg","project_type":{"title":"Oil & Gas Facility","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-oil-gas.png"},"project_status":"Completed","project_location":"Kazakhstan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/294-295.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/294-295-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/294-295-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/294-295-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/294-295-1.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/294-295.jpg","commence":"12-07-2005","complete":"31-08-2012","title":"Kashagan Main Works Construction Project","slug":"kashagan-main-works-construction-project","job_no":"294, 295","portion":50.0,"client":"AGIP Kazakhstan North Caspian Operating Co. N.V.","latitude":47.347695,"longitude":52.799095,"contractor":"NCC (Tekfen Construction and Installation Co., Inc. - Gama)","description":"<p>Kashagan, an offshore field located at the north of the Caspian Sea, in the Kazakh territory, was discovered in July, 2000. Owned by a group of partners led by Agip, presently Kashagan could prove to be the world’s fifth largest oil field. The field, 75 km SSE of Atyrau, lies in just 3,7 m of water. The field holds an estimated of 7 to 9 billion barrels of recoverable oil resources with a total geological reserve of 38 billion barrels.<br/></p><p>Scope of works contains execution of the Main Construction Works at Karabatan which is 35 km north east of Atyrau, Kazakhstan of AGIP KCO Agip Kazakhstan North Caspian Operating Company N.V. Scope of work contains procurement of civil discipline materials, all construction and precommissioning works.</p><ul><li>Processing Units (Main piperack)</li><li>Oil Processing TR1 / TR2 / TR3</li><li>Gas Compression Unit 361</li></ul><p></p><p><b>Major Commodities:</b></p><ul><li>Excavation - Backfill: 214.000 m<sup>3</sup>, 140.000 m<sup>3</sup> Backfill</li><li>Roads: 17.425 m<sup>2</sup> Asphalt Road</li><li>Concrete: 74.431 m<sup>3</sup>, 34.721 m<sup>2</sup> paving, 6.299 m<sup>3</sup> menhole concrete</li><li>Buildings: 8 no Transformer building: 4.560 m<sup>2</sup>, 3 no control building: 4.185 m<sup>2</sup>, 3 no compressor building: 4.985 m<sup>2</sup></li><li>Pipe: 357.000 m (23.986 Tonnes) 965.235 WDI welding (730.374 WDI pipe fabrication, 234.861 WDI field erection)</li><li>Equipment: 389 no</li><li>Cable: Out of scope</li><li>Terminations: Out of scope</li><li>Painting: 614.417 m<sup>2</sup> Steel Painting (388.643 m<sup>2</sup>) and Pipe Painting (225.774 m<sup>2</sup>)</li><li>Insulation: 85.092 m<sup>2</sup> insulation (6.531 m<sup>2</sup> equipment, 78.561 m<sup>2</sup> pipe)<br/></li></ul><p><b>(Oil Tranche-3):</b></p><ul><li>Roads: 8.263 m<sup>2</sup></li><li>Concrete: 2.337 m<sup>3</sup> foundations, 14.972 m<sup>2</sup> pavings</li><li>Steel: 2.916 tonnes</li><li>Pipe: 169.290 WDI welding (122.132 WDI pipe fabrication, 47.158 WDI field erection)</li><li>Equipment: 99 no</li><li>Cable: Out of scope</li><li>Terminations: Out of scope</li><li>Painting: 91.145 m<sup>2</sup> Steel Painting (72.734 m<sup>2</sup>) and Pipe Painting (18.411 m<sup>2</sup>)</li><li>Insulation: 12.814 m<sup>2</sup> insulation (2.899 m<sup>2</sup> equipment, 9.915 m<sup>2</sup> pipe)</li></ul>","text_promotion":""},{"id":39,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/plant_0020_324.jpg","project_type":{"title":"Chemical","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-chemical.png"},"project_status":"Completed","project_location":"Morocco","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/324.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/324-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/324-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/324-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/324-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/324-5.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/324-7.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/324-8.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/324.jpg","commence":"16-08-2010","complete":"31-05-2013","title":"DAP (Diammonium Phosphate) Fertilizer Plants Project","slug":"dap-diammonium-phosphate-fertilizer-plants-project","job_no":"324","portion":100.0,"client":"Maroc Phosphore S.A.","latitude":33.161604,"longitude":-8.629402,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Project location is in a industrial area at Jorf Lasfar, 120km away from Casablanca and situated on the Atlantic coast of Morocco. It’s main center for export of phosphate and production of fertilizer. Maroc Phosphore S.A. is a company involved in the production of phosphoric acid and fertilizers and it is launching an important investment program in its production sites for which it needs state of the art construction services. The Project consists of two DAP (Diammonium phosphate ) fertilizer plants that have 1.700.000 ton/year production capacity in total. The Project also includes conveyor systems and acid storage tank areas.<br/></p><p><b>Main components are;</b></p><ul><li>2 DAP Plants with capacity of 850.000 t/year each</li><li>2 Substation Buildings</li><li>Raw Material and Product Handling System</li><li>4 Phosphoric Acid tanks (2000 m<sup>3</sup> each)</li><li>2 Coating Oil tanks (500 m<sup>3</sup> each)</li><li>1 Sulphuric Acid (300 m<sup>3</sup>)</li><li>Compressor Air station<br/></li></ul><p><b>HIGHLIGHTS</b></p><ul><li>Excavation: 100.000 m<sup>3</sup></li><li>Backfill: 125.000 m<sup>3</sup></li><li>Reinforced Concrete: 30.000 m<sup>3</sup></li><li>Reinforcement: 2.500 t</li><li>Offices and Substation Buildings: 4.100 m<sup>2</sup></li><li>Structural Steel: 5.000 t</li><li>Anchor Bolts, Embedded Parts : 40 t</li><li>Equipment Erection: 3.600 t</li><li>CS Piping: 660 t</li><li>SS Piping: 230 t</li><li>GRP piping: 45.000 dia-inch</li><li>Electrical &amp; Instrumentation Cabling: 320 km</li><li>Electrical &amp; Instrumentation Cable Tray: 14 km</li><li>Insulation: 20.000 m<sup>2</sup></li></ul>","text_promotion":""},{"id":40,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/321-cover.jpg","project_type":{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},"project_status":"Completed","project_location":"Morocco","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/321.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/321-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/321-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/321-3.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/321.jpg","commence":"03-06-2010","complete":"31-12-2012","title":"Topping Unit 4 (Cdu-4) Project","slug":"topping-unit-4-cdu-4-project","job_no":"321","portion":100.0,"client":"Société Anonyme Marocaine De L'industrie Du Raffinage (SAMIR)","latitude":33.684661,"longitude":-7.379969,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Société Anonyme Marocaine de l’Industrie du Raffinage (SAMIR) is one of the largest companies operating in Morocco and owns the sole refinery of the country. The refinery located at Mohammedia, on the Atlantic coast, about 30 km north east of Casablanca.<br/></p><p>Crude oil distillation and Kerosene treatment units will have a yearly capacity of 4 million tons and 600 thousand tons respectively.<br/></p><p>With this Project, the new unit of crude oil distillation (CDU-4) will feed the entries of recently completed Upgrade Project.<br/></p><p>Tekfen&#x27;s scope of work include detailed engineering for civil works, purchasing of civil, steel structure,painting, insulation material, construction works including civil, mechanical, electrical, instrumentation, painting, insulation, fabrication of steel structures, pipe spools and pipe supports and assistance to precommisioning, commisioning, start up and performance tests.<br/></p><p><b>Main Project Work Volumes (Estimated):</b></p><ul><li>Excavation / Backfilling: 38.000 m<sup>3</sup></li><li>Roads: 1.000 m<sup>2</sup></li><li>Concrete:7.200 m<sup>3</sup></li><li>Buildings: 636 m<sup>2</sup></li><li>Steel Structure: 830 ton</li><li>Piping (A/G &amp; U/G): 1.870 ton</li><li>Pipe Support: 430 ton</li><li>Equipment: 3.000 ton</li><li>Cable Installation: 95 m</li><li>Termination: 6.850 ea.</li><li>Painting: 38.100 m<sup>2</sup></li><li>Insulation: 43.300 m<sup>2</sup></li></ul>","text_promotion":""},{"id":41,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/292-cover.jpg","project_type":{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},"project_status":"Completed","project_location":"Morocco","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/292.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/292-7.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/292-6.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/292-5.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/292-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/292-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/292-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/292-1.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/292.jpg","commence":"01-09-2005","complete":"31-10-2009","title":"Samir Refinery, Upgrading Project","slug":"samir-refinery-upgrading-project","job_no":"292","portion":100.0,"client":"Société Anonyme Marocaine de l’Industrie du Raffinage (SAMIR)","latitude":33.684661,"longitude":-7.379969,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Société Anonyme Marocaine de l’Industrie du Raffinage (SAMIR) is one of the largest companies operating in Morocco and owns the sole refinery of the country.<br/></p><p>The refinery (125.000 bpd), located at Mohammedia, on the Atlantic coast, about 30 km north of Casablanca, has started a major expansion program as of 2005 to upgrade and add new units to the existing ones.<br/></p><p>Front End Engineering and Design (FEED) works completed by Foster Wheeler foresee a project configuration based on the installation of a new processing complex, which will be integrated into the existing refinery.<br/></p><p>The major elements of the Upgrading Project, the new process units are listed as follows:<br/> • Vacuum Distillation Unit 54.300 bpsd (360 m3/h) • Fuels Hydrocracker Unit 36.000 bpsd (239 m3/h) • Distillate Hydrotreater Unit 55.000 bpsd (364 m3/h) • Hydrogen Production Unit 102.000 Nm3/h (220 TPD) • Sulphur Recovery Unit 253 TPD per train (2 trains)<br/> The project also includes necessary expansion of the refinery infrastructure covering offsite and utility systems, amine treatment and sour water stripping facilities, plus 398 tie-ins to the existing system.<br/></p><p>The upgrade scheme is designed to enable the Samir Refinery to meet future domestic demand of Morocco for refined products, particularly middle distillates and also to manufacture products for the European and other markets.<br/></p><p><b>The objectives of the upgrade scheme are:</b></p><ul><li>To process 1.22 mio t of atmospheric residue,</li><li>To decrease the proportion of the heavy oil production by upgrading the heavy oil to valuable middle distillate products, and,</li><li>To improve quality of distillate fuel products, namely diesel.<br/></li></ul><p>Chevron Lummus Global (hydrocracker), UOP (hydrotreater), Parsons (sulphur recovery unit) are the technology licensors.<br/></p><p>In the project all construction works and procurement of civil, structural steel, insulation and painting materials are within Tekfen’s scope.<br/></p><p><b>HIGHLIGHTS</b></p><ul><li>Excavation: 265.725 m<sup>3</sup></li><li>Reinforced Concrete: 81.357 m<sup>3</sup></li><li>Paving Concrete: 53.412 m<sup>2</sup></li><li>Asphalt Road: 21.000 m<sup>2</sup></li><li>Offices and Substation Buildings: 6.400 m<sup>2</sup></li><li>Structural Steel: 8.000 t</li><li>Equipment Erection: 20.500 t</li><li>Heavy Lift Erection: 3.150 t</li><li>Piping Erection (supports incl.): 11.822 t</li><li>Electrical &amp; Instrumentation Cabling: 1.000 km</li><li>Insulation: 160.000 m<sup>2</sup></li><li>Painting: 313.370 m<sup>2</sup></li></ul>","text_promotion":""},{"id":42,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/316-cover.jpg","project_type":{"title":"Chemical","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-chemical.png"},"project_status":"Completed","project_location":"Qatar","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/316.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/316-6.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/316-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/316-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/316-5.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/316-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/316-1.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/316.jpg","commence":"01-06-2009","complete":"30-06-2012","title":"QAPCO Low Density Polyethylene Plant (LDPE3) Project","slug":"qapco-low-density-polyethylene-plant-ldpe3-project","job_no":"316","portion":100.0,"client":"Qatar Petrochemical Company Limited (Q.S.C) QAPCO","latitude":24.993209,"longitude":51.548477,"contractor":"UHDE Gmbh, Tekfen Construction and Installation Co., Inc.","description":"<p>QAPCO Petrochemical complex is located in Mesaieed Industrial City of Qatar, about 40 km south of Doha. In addition to the existing low density polyethylene plants LDPE1 and LDPE2 at the petrochemical complex, QAPCO intends to construct and operate a new Low Density Polyethlene Plant (LDPE3) of 250,000 expandable to 300,000 tons per year capacity.<br/></p><p>QAPCO awarded the management, engineering, procurement and supply, construction and commissioning of the LDPE3 Plant to UHDE Gmbh. Tekfen&#x27;s scope of work shall include procurement and supply of steel structures, civil construction, insulation and painting materials and construction, erection of all mechanical, electrical and instrumentation works including precommissoning and assistance to commissioning, start up and performance test activities.<br/></p><p><b>MAIN PROJECT WORK VOLUMES:</b></p><ul><li>Excavation and Backfilling: 90.000 m<sup>3</sup></li><li>Piling: 9.000 m</li><li>Reinforced Concrete: 25.000 m<sup>3</sup></li><li>Paving Concrete: 8.800 m<sup>2</sup></li><li>Asphalt Road: 1.400 m<sup>2</sup></li><li>Buildings: 4.300 m<sup>2</sup></li><li>Supply and Erection of Structural Steel: 4.200 t</li><li>Equipment Erection: 6.000 t</li><li>Piping Prefabrication and Erection (supports incl.): 2.500 t</li><li>Painting: 59.000 m<sup>2</sup></li><li>Electrical &amp; Instrumentation Cabling: 800 km</li><li>Hot and Cold Insulation: 62.000 m<sup>2</sup></li></ul>","text_promotion":""},{"id":43,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/306-cover.jpg","project_type":{"title":"Chemical","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-chemical.png"},"project_status":"Completed","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/306.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/gak_7049.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/gak_7042.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/gak_6996.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/gak_6965.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/gak_6929.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/gak_6920.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/gak_6901.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/gak_6876.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/306.jpg","commence":"31-05-2007","complete":"30-06-2010","title":"Wet Phosphoric Acid Plant","slug":"wet-phosphoric-acid-plant","job_no":"306","portion":35.5,"client":"Saudi Arabian Mining Co. - Ma’aden","latitude":24.701532,"longitude":46.846589,"contractor":"Tekfen Construction and Installation Co., Inc. - Litwin Consortium","description":"<p>Tekfen signed Contract for Ma’aden Wet Phosphoric Acid Plant in consortium with Litwin. The project covers LSTK contract for the engineering, procurement, construction and erection of Wet Phosphoric Acid Plant with a capacity of 4.380 t/day P2O5 as 48% concentrated Phosphoric Acid, together with neutralization unit, its sludge pond and phosphoric acid / sulphuric acid truck and railway car loading station nearby the plant area.<br/></p><p>Tekfen was responsible for the whole construction and erection works as consortium partner and was implementing all construction and erection works at site.<br/></p><p>HIGHLIGHTS</p><ul><li>Excavation: 170.000 m<sup>3</sup></li><li>Backfilling: 175.000 m<sup>3</sup></li><li>Piles: 4.200 Nos</li><li>Structural Reinforced Concrete: 50.000 m<sup>3</sup></li><li>Structural Steel Installation: 9.000 t</li><li>Piping: 2.100 t<ul><li>CS Pipes: 340 t</li><li>RLCS Pipes: 1.200 t</li><li>SS Pipes: 130 t</li><li>Others: 430 t</li></ul></li><li>Equipment Installation: 6.500 t<ul><li>Storage Tanks: 900 t</li><li>Reactor: 1.100 t</li><li>Others: 4.500 t</li></ul></li><li>Cables: 490.000 m</li><li>Cable Trays: 380.000 kg</li></ul>","text_promotion":""},{"id":44,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/plant_0015_305.jpg","project_type":{"title":"Oil & Gas Facility","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-oil-gas.png"},"project_status":"Completed","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/plant_0015_305.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/plant_0015_305.jpg","commence":"17-02-2007","complete":"31-07-2009","title":"Khurais, Water Injection Facilities & Utilities","slug":"khurais-water-injection-facilities-utilities","job_no":"305","portion":100.0,"client":"Snamprogetti S.A.","latitude":25.087768,"longitude":48.043997,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>The Khurais oilfield development is the largest of several Saudi Aramco projects intended to boost the production capacity of Saudi Arabia’s oilfields from 11.3 million bpd to 12.5 million bpd by 2009.<br/></p><p>The Khurais project as a whole covers three oil fields: Khurais, Abu Jifan and Mazalij. The Khurais field, with an area of 2.890 km<sup>2</sup> and 127 km long, located about 250 km southwest of Dhahran and 300 km north southeast of Riyadh, is the biggest in the project. Abu Jifan covers 520 km<sup>2</sup> southwest of Khurais and Mazalij covers 1.630 km<sup>2</sup> southeast of Abu Jifan.<br/></p><p>There will be four injection plants with capacity of over four million barrels of treated seawater per day. FEED works have been completed by Foster Wheeler.<br/></p><p>Tekfen has been awarded Khurais Water Injection Facilities and Utilities Project, Mechanical Works, Package-1 and Package-2 by Snamprogetti of Italy acting as the EPC Contractor for Aramco in February 2007. The works cover steel erection for the main pipe rack as well as other pipe racks and structures, piping &amp; support fabrication and erection, fire water system, erection of equipment &amp; machinery including boilers, turbines &amp; utilities, hydrotesting and painting &amp; insulation.<br/></p><p><b>HIGHLIGHTS</b></p><ul><li>Steel structure erection: 17.200 t</li><li>Pipe fabrication: 3.140 t</li><li>Support fabrication: 1.237 t</li><li>Piping erection: 20.800 t</li><li>Welding: 388.000 wdi (dia-inches)</li><li>Equipment erection: 5.020 t</li><li>Painting: 138.000 m<sup>2</sup></li><li>Insulation: 32.200 m<sup>2</sup></li></ul>","text_promotion":""},{"id":45,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/301-302-cover.jpg","project_type":{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},"project_status":"Completed","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/301.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/301-302-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/301-302-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/301-302-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/301-302-4.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/301.jpg","commence":"16-07-2006","complete":"31-03-2009","title":"Petrorabigh,Utilities & Offsites Umbrella (Uou) And Utilities & Offsites Package No 1 (Uo1) Schemes","slug":"petrorabighutilities-offsites-umbrella-uou-and-utilities-offsites-package-no-1-uo1-schemes","job_no":"301, 302","portion":100.0,"client":"PETRORabigh Refining and Petrochemical Co.","latitude":22.793249,"longitude":39.018554,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Rabigh, a new industrial zone under development, is located on the Red Sea coast, about 150 km northwest of Jeddah, the Kingdom of Saudi Arabia. Tekfen has been awarded civil, mechanical, piping and structural steel works of the Utilities and Offsites Umbrella (UOU) scheme and civil, mechanical, piping, structural steel, electrical and instrumentation works of the Utilities and Offsites Package No 1 (UO1) scheme of the Rabigh Development Project.<br/></p><p>The client, PETRORabigh Refining and Petrochemical Co. is a 50/50 joint venture between Saudi Aramco and Sumitomo Chemical Company of Japan. The client representative for the UOU and UO1 are Foster Wheeler Arabia Ltd. and Hitachi Plant Technologies Limited respectively.<br/></p><p><b>The main works for the UOU Project and the relevant quantities are as follows:</b></p><ul><li>Civil works do comprise 1.159 off Bored Piles,</li><li>90.000 m<sup>3</sup> of excavation,</li><li>42.000 m<sup>3</sup> of reinforced concrete,</li><li>27 km of Underground Piping Works,</li><li>1.230 m of a 3x3 Discharge Box Culvert,</li><li>8.000 precast,</li><li>5.250 cast-in situ-pipe sleepers.<br/></li></ul><p>Mechanical works do comprise supply, fabrication and erection of 9.400 t of pipe rack and structural steel and implomentation of 400 km of aboveground piping works (360 km of carbon steel + 40 km of stainless steel) together with equipment erection works for 180 off equipments including drums, vessels, tanks, LPG vaporizers and pumps.<br/></p><p><b>The main work activities for the UO1 Project are the followings:</b></p><p>Civil, mechanical, electrical and instrumentation works of</p><ul><li>5 Cooling Towers,</li><li>1 Air Separation Unit,</li><li>1 Incinerator Unit,</li><li>1 Wet Air Oxidizing Unit,</li><li>1 Compressed Air Station,</li><li>1 Seawater Intake Facility and</li><li>1 Sulphur Forming- and Ship Loading - Unit.</li></ul>","text_promotion":""},{"id":46,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/plant_0013_336.jpg","project_type":{"title":"Chemical","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-chemical.png"},"project_status":"Completed","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/plant_0013_336.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/plant_0013_336.jpg","commence":"13-11-2012","complete":"31-07-2015","title":"Propylene Oxide Process Unit","slug":"propylene-oxide-process-unit","job_no":"336","portion":100.0,"client":"Sadara Chemical Corp.","latitude":26.966746,"longitude":49.579713,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Tekfen was awarded the construction of LSPB contract for Propylene Oxide Plant at Sadara Petrochemical Complex. The scope of work covers all civil works, erection of prefabricated columns and vessels, installation of electrical and Instrumentation including central control building.</p><p></p><p><b>HIGHLIGHTS</b></p><ul><li>Structural Reinforced Concrete: 52.000 m<sup>3</sup></li><li>Rebar: 3550 t</li><li>Steel Erection: 8000 t<ul><li>Equipment Erection: 7.644t</li><li>Tanks: 356 t</li></ul></li><li>Structural Steel: 3575 t</li><li>Piping: 2321 t<ul><li>CS: 898 t</li><li>SS: 1328 t</li><li>Misc.: 95 t</li></ul></li><li>Cabling: 28.000 m</li></ul>","text_promotion":""},{"id":47,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/285-cover.jpg","project_type":{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},"project_status":"Completed","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/285.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/285.jpg","commence":"26-04-2004","complete":"02-07-2005","title":"Yanbu Refinery DHT Complex","slug":"yanbu-refinery-dht-complex","job_no":"285","portion":100.0,"client":"Saudi Aramco","latitude":24.028187,"longitude":38.173843,"contractor":"Technicas Reunidas, Spain - Tekfen as cooperating partner","description":"<p>The Industrial City of Yanbu, located in western Saudi Arabia on the Red Sea north of Jeddah, is a new development area and key industrial complex with mission. The massive investment in Yanbu and Jubail industrial cities has as its major objective a reduction in the Kingdom’s dependence on oil revenues by gaining access to the world’s petrochemical markets.<br/></p><p>Tekfen undertook Civil Works scheme of Yanbu Refinery (DHT) Diesel Hydro-treating Complex Project in cooperation with Technicas Reunidas of Spain.<br/></p><p>Tekfen’s scope covers pipe rack, track, equipment and structure foundations, paving, under-ground piping, roads and culverts, structural steel, firefighting, grounding and substation works of the DHT Complex.<br/></p><p>The client, Saudi Aramco is one of the most demanding companies of the world with very high Quality and HSE Standards; Tekfen has been serving the client successfully also in other challenging industrial schemes of S. Arabia.</p><p></p><p><b>Highlights</b></p><ul><li>Trench Excavation: 24.693 m<sup>3</sup></li><li>Foundation Excavation: 63.425 m<sup>3</sup></li><li>Foundation Back Filling: 52.605 m<sup>3</sup></li><li>Plant-Mix Sub-base Course: 17.817 m<sup>3</sup></li><li>Trench Back Filling: 15.289 m<sup>3</sup></li><li>Asphalt Paved: 11.935 m<sup>2</sup></li><li>Wooden Formwork: 46.622 m<sup>2</sup></li><li>Anchor Bolt Formwork: 6.895 dm<sup>3</sup></li><li>Concrete Class C25: 13,929 m<sup>3</sup></li><li>Lean Concrete: 35.781 m<sup>2</sup></li><li>Reinforcing Steel: 1.255.373 kg</li><li>Steel Wire Mesh: 206.489 kg</li><li>Pre-cast Manhole Installation: 114 units</li><li>Storm Manhole: 6 units</li><li>Valve Chamber: 7 units</li><li>GRP Pipe and Installation: 9.963 m</li><li>Transformer Building: 840 m<sup>2</sup></li><li>Generator Room: 118 m<sup>2</sup></li><li>Operation Building: 121 m<sup>2</sup></li><li>Grease Trap: 320 m<sup>3</sup></li></ul>","text_promotion":""},{"id":48,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/332-cover.jpg","project_type":{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/332-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/332-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/332-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/332-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/332-5.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/332.jpg","commence":"10-11-2011","complete":"28-02-2015","title":"Tüpraş - Residuum Upgrading Project Of The Izmit Refinery","slug":"tupras-residuum-upgrading-project-of-the-izmit-refinery","job_no":"332","portion":100.0,"client":"TÜPRAŞ, Turkish Petroleum Refineries Co., Inc.","latitude":40.753101,"longitude":29.764609,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>TUPRAS is the 7<sup>th</sup> biggest refining company in Europe and 29<sup>th</sup> biggest refining company in World with 28.1 million ton production capacity and a pioneer company in TURKEY with crude oil supplies, exports of petroleum products if necessary, the production of petroleum products (refinery), storage, transportation, distribution and marketing activities in petroleum industry.<br/></p><p>Resid Upgrade Project (RUP) has been decided for İzmit Refinery of TUPRAS which is located in Gulf of İzmit, at the center of a consumption hub that accounts for around 40% of Turkish petroleum product consumption.<br/></p><p>The main purpose of the Resid Upgrade Project (RUP) is to built units that process the low value of fuel oil and convert it to valuable products. With completion of the Resid Upgrade Project, Owner TUPRAS will process 4.2 million ton high sulfur fuel oil and produce 3.5 million ton valuable high quality white products (diesel / jet fuel, gasoline and LPG) in Euro-V standarts, 690.000 ton petroleum coke and 86.000 ton sulfur.<br/></p><p>Shell GSI, Foster Wheeler USA, UOP and Technip are the technology licensors for the project.<br/></p><p>Tecnicas Reunidas, an international general contractor in engineering and construction in the oil and gas sector, enter a contract with TUPRAS as a main contractor for Resid Upgrade Project (RUP).<br/></p><p>TEKFEN has been awarded a US$ 501.000.000 contract from TUPRAS as one of the biggest contractor in the main project. Contract includes the execution of all Construction Works for Civil Works, HVAC System, Steel Structure Engineering, Supply and Erection, Mechanical Erection, Electrical and Instruments Installation and also Precommissioning, Commissioning Activities.</p><p></p><p><b>The plant consists of following process sections:</b></p><ul><li>Coker Unit.</li><li>Integrated Unicracking Process Unit.</li><li>Vacuum Unit.</li><li>Hydrogen Unit.</li><li>Sulphur Recovery Unit.</li><li>Amine Regeneration Unit.</li><li>Sour Water Stripping Unit.</li><li>Substation.</li><li>Utilities.<br/></li></ul><p><b>The main works and the relevant quantities:</b></p><ul><li>Excavation: 53.046 m<sup>3</sup></li><li>Backfilling: 469.964 m<sup>3</sup></li><li>Piling: 21.283 m</li><li>Reinforced Concrete: 124.757 m<sup>3</sup></li><li>Structural Steel Fabrication and Erection: 25.078 t</li><li>Equipment Erection: 28.546 t</li><li>Piping Fabrication and Erection: 16.049 t</li><li>Cable Tray Erection: 320.243 m</li><li>Cable Laying: 3.950.089 m</li><li>Fireproofing: 207.747 m<sup>2</sup></li></ul>","text_promotion":""},{"id":49,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/335-cover.jpg","project_type":{"title":"Chemical","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-chemical.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/335-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/335-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/335-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/335-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/335-5.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/335-cover.jpg","commence":"24-09-2012","complete":"01-04-2015","title":"Toros - Samsun, Sulfuric Acid, Phosphoric Acid And NPK Plants Project","slug":"toros-samsun-sulfuric-acid-phosphoric-acid-and-npk-plants-project","job_no":"335","portion":100.0,"client":"Toros Agri-Industry & Trade Co., Inc.","latitude":41.278553,"longitude":36.338072,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Toros Tarım Samsun Plant is located in Tekkeköy 15 km east of Samsun. Investment Project scope includes;</p><ul><li>New Sulphuric Acid Plant</li><li>New Phosporic Acid Plant</li><li>Revamp of NPK Unit</li><li>Sulphur Storage Area</li><li>Phosphate Rock Storage Area</li><li>Sulphuric Acid Tank (15.000 tons)</li><li>Revision of existing conveyors to enable Sulphur handling</li><li>New conveyors for the plants</li><li>Power generation, Internal and External Distribution Center equipped with Turbine Generator</li><li>Demi Water Unit</li><li>Gypsum Area</li><li>Revision of Cooling Water Unit<br/></li></ul><p>Toros awarded the Project to Tekfen Construction on Engineering, Procurement and Construction (EPC) basis. Basic Engineering and Equipment supply of Sulphuric Acid Plant, Phosphoric Acid Plant and NPK Revamp shall be untertaken by foreign process engineering companies. Tekfen Construction shall be responsible to do local detail engineering, supply project materials for civil, structural steel, piping, painting insulation, electrical, instrumentation and acid protection and lining works and undertake all construction, erection, precommissioning, commissioning, start up and performance testing works.</p><p></p><p><b>MAIN PROJECT WORK VOLUMES</b></p><ul><li>Excavation: 62.000 m<sup>3</sup></li><li>Reinforced Concrete: 31.000 m<sup>3</sup></li><li>Buildings: 6.500 m<sup>2</sup></li><li>Structural Steel Fabrication and Erection: 5.000 t</li><li>Equipment Erection: 7.000 t</li><li>Piping Fabrication and Erection: 2.000 t</li><li>Painting: 60.000 m<sup>2</sup></li><li>Acid Brick/Ceramic and Rubber Lining: 30.000 m<sup>2</sup></li><li>Electrical &amp; Instrumentation Cabling: 600 km</li><li>Hot and Cold Insulation: 46.000 m<sup>2</sup></li></ul>","text_promotion":""},{"id":50,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/plant_0008_351.jpg","project_type":{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/50-GS8_8589_1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/37-AL-Star17-20.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/68-GS8_9216.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/64-GS8_8966_1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/02-DSC_9938.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/21-AL-Star17-9.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/33-AL-Star17-22.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/57-GS8_8284.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/19-GS8_8032.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/351.jpg","commence":"29-08-2016","complete":"20-02-2019","title":"Aliağa Socar Turkey Aegean Refinery (Star) Project–p2b Electromechanical And Steelstructure Erection Works","slug":"aliaga-socar-turkey-aegean-refinery-star-projectp2b-electromechanical-and-steelstructure-erection-works","job_no":"351","portion":100.0,"client":"TSGI JV -TecnicasReunidas (Spain), SAIPEM (Italy), GS (South Korea), ITOCHU (Japan)","latitude":38.799535,"longitude":26.972347,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>SOCAR Turkey Aegean Refinery (STAR) is a private-sector founded refinery investment in Aliağa, Turkey.<br/></p><p>The refinery is located on a challenging geography with limited space on Petkim Peninsula in Aliağa, about 50 km north of İzmir. Total area of the STAR-Aliağa projectis approximately 2.400.000 m<sup>2</sup>.<br/></p><p>Type of the refineryis “High Complexity High Conversion Oil Refinery” and it has a crude oil processing capacity of 10 million tons per year, which has the capability of processing various crude oil types including Ural, Azeri Light and Kirkuk. STAR Refinery will have a total of 1.640.000 m<sup>3</sup> storage capacity with 63 tanks.</p><ul><li>Main Fuel Type: Natural Gas and Refinery Fuel Gas<br/></li></ul><p><b>Refinery Products and Approximate Annual Quantities</b><br/></p><ul><li>Petrochemistry Feedstock<ul><li>Naphtha: 1.615.000 tons/yr</li><li>Mixed Xylene: 422.000 tons/yr<br/></li></ul></li><li>Motor Fuels<ul><li>Ultra-low-sulfurDiesel Fuel: 4.800.000 tons/yr</li><li>Jet Fuel: 1.630.000 tons/yr</li><li>LPG: 320.000 tons/yr<br/></li></ul></li><li>Others<ul><li>Reformates: 485.000 tons/yr</li><li>Petroleum Coke: 692.000 tons/yr</li><li>Sulphur: 153.000 tons/yr<br/></li></ul></li></ul><p><b>HIGHLIGHTS (Tekfen’s Work Scope)</b></p><ul><li>Structural Steel: 9.900 tons</li><li>Equipment Erection: 10.700 tons</li><li>Pipe Welding: 468.500 dia-inch</li><li>Pipe Erection Weight: 6.899 tons</li><li>Cable Pulling: 1.300 km</li><li>Cable Tray Erection: 65 km</li><li>Instrument Installation: 12.321 pcs</li><li>Painting: 25.000 m<sup>2</sup></li><li>Fireproofing Works: 48.350 m<sup>2</sup></li><li>Pipe Insulation: 75.400 m<sup>2</sup></li><li>Equipment Insulation: 12.260 m<sup>2</sup></li></ul>","text_promotion":""},{"id":51,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/Domeroof_Montaj_Isleri-4.jpg","project_type":{"title":"Repair, Maintenance And O&M Services","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-repair.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/Domeroof_Montaj_Isleri-4.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/Domeroof_Montaj_Isleri-4.jpg","commence":"31-01-2018","complete":"28-02-2022","title":"Tüpraş İzmit Refinery Maintanance And Repair Services Project","slug":"tupras-izmit-refinery-maintanance-and-repair-services-project","job_no":"362","portion":100.0,"client":"TÜPRAŞ, Turkish Petroleum Refineries Co., Inc.","latitude":40.753101,"longitude":29.764609,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>TUPRAS is the 7<sup>th</sup> biggest refining company in Europe and 29<sup>th</sup> biggest refining company in World with 28.1 million ton production capacity and a pioneer company in TURKEY with crude oil supplies, exports of petroleum products; if necessary, the production of petroleum products (refinery), storage, transportation, distribution and marketing activities in petroleum industry.<br/></p><p>The aim of the project is to adjust the necessary materials, equipment and manpower for the works planned to meet the needs of the refinery facilities, social facilities and Sapanca pumping station maintenance and repair needs under TÜPRAŞ İzmit Refinery Maintenance Group Directorate. In addition, it covers the completion of maintenance and repair works in accordance with the TÜPRAŞ work permit system and establishment of the site arrangement upon technical approval for the work permit.<br/></p><p><b>GENERAL SCOPE</b><br/></p><p>Within the scope of the project, work items listed, but not limited to the below, will be executed in accordance with the site contract (method, time, shift scheme).<br/></p><p>Metal-Maintenance Jobs: Defect originating and protective metal welding maintenance and repair works are performed to ensure the reliability and integrity of static equipment.<br/></p><p>Tank-Maintenance Jobs: Static equipment maintenance and repairs are performed in order to ensure continuity of operation by improving reliability and integrity of equipment.<br/></p><p>Insulation Works: Insulation of pipes, valves and individual equipment covers renovation of damaged insulation. Painting and Sandblasting Works: It covers painting and repainting of damaged coatings of steel structure and individual pieces of various equipment.<br/></p><p>Construction Works: Refinery construction workshop covers building maintenance, plastering and painting, manual and equipment excavation – land filling works, cleaning, carpentry works, sewer works.<br/></p><p>Scaffolding Works: It covers setting up scaffolding and dismantling works in line with refinery standards as required for all maintenance works.<br/></p><p>Scheduled Shut Down (Turn Around-TA): It covers scheduled shutdown works that are based on evaluation TÜPRAŞ specified scope, by making the required preparations and setting up the adequate number of crews.</p>","text_promotion":""},{"id":52,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/Tupras_Refinery_FCC_Project2.jpg","project_type":{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/Tupras_Refinery_FCC_Project2.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/Tupras_Refinery_FCC_Project2.jpg","commence":"06-03-2018","complete":"17-12-2021","title":"Tüpraş İzmit Refinery FCC Revamp Installation Project","slug":"tupras-izmit-refinery-fcc-revamp-installation-project","job_no":"368","portion":100.0,"client":"Türkiye Petrol Rafinerileri A.Ş. (TÜPRAŞ)","latitude":40.753101,"longitude":29.764609,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>The aim of the project is to perform engineering, procurement and construction activities in order to increase the operational performance at FCC Unit in Izmit Refinery.</p><p>Provisional Acceptance Date: 17/12/2021</p><p>Start-up Date: 06/01/2022</p><p>Final Acceptance Date: 06/01/2023</p><p></p><p><b>GENERAL SCOPE</b><br/></p><p><b>The scope of the project is listed as below:</b></p><p>Engineering scope of work is contracted to Tekfen Engineering Co., Inc. by the Client.</p><p>Procurement items within Tekfen scope are regenerator, reactor, orifice chamber, reactor stripper, structural steel, pipe, valves &amp; fittings, expansion joints, electrical cable glands and cables, instrumentation cable glands and cables.</p><p>Fabrication Works: Structural steel and piping spools will be fabricated in Tekfen Ceyhan Fabrication Facility. As for reactor, regenerator, orifice chamber and reactor stripper will be manufactured in Tekfen Manufacturing and Engineering’s plant in Derince.</p><p>Mechanical Works: Piping and installation of equipment that are supplied by Tekfen and Client are within the mechanical scope of work.</p><p>Electrical and Instrumentation Works: Earthing, cabling, connection to panels and installation of instrumentation that are supplied by Client are within the scope of Tekfen.</p><p>Construction Works: Piling works, foundation, structural steel erections, paving works and fireproofing for structural steel are within the scope of work.</p><p></p><p><b>MAIN WORKS SUMMARY</b></p><ul><li>Bored Piling Works: 94 nos, Ø 1000 mm &amp; L=40 m</li><li>Concrete Works: 4.800 m<sup>3</sup></li><li>Structural Steel Installation: 1.795 ton</li><li>Pipe Installation-Welding: 70.795 WDI</li><li>Regenerator Installation: 213 tonnes</li><li>Reactor Installation: 185 tonnes</li><li>Other Equipment Installation: 1.386 tonnes</li><li>Fire-proofing: 8.500 m<sup>2</sup></li></ul>","text_promotion":""},{"id":53,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/72-cover.jpg","project_type":{"title":"Chemical","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-chemical.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/248.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/72-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/72-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/72-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/72-2.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/248.jpg","commence":"03-01-1977","complete":"20-02-2001","title":"Toros Fertilizer Plant And Terminal Facilities","slug":"toros-fertilizer-plant-and-terminal-facilities","job_no":"72, 120, 144, 248","portion":100.0,"client":"Toros Fertilizer and Chemical Industry Co., Inc.","latitude":36.867292,"longitude":35.944452,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Toros Fertilizer Plant and Terminal Facilities are suitably located on Turkey’s south - eastern Mediterranean Coast, near Ceyhan, one of the most important agricultural regions of Turkey; Tekfen Construction and Installation Co., Inc., undertook the construction of the fertilizer plant and marine terminal as an EPC Contractor.<br/></p><p>The first phase of the project, which was started in 1977, covered feasibility studies, preliminary engineering works, license agreements, detail engineering works, procurement, construction, fabrication and erection, electrical and instrumentation works and commissioning.<br/></p><p>Tekfen was also directly involved in activities related to providing finance for the project.<br/></p><p>Toros Fertilizer Plant has two compound-fertilizer (NPK) production units, which can also produce DAP (Diammonium Phosphate). The plant can produce 132.000 t of MAP (Mono Ammonium Phosphate), 660.000 t of NPK and 200.000 t of DAP per year.<br/></p><p>Presently, Toros Marine Terminal is one of the most important multi-purpose terminals in the entire eastern Mediterranean region handling both dry bulk and liquid cargoes, including petroleum products. The Terminal, successfully handles up to 6 million t of bulk and liquid cargoes annually. The truck loading / unloading station, which possesses heating facilities, can accommodate 56 road tankers at a time.<br/></p><p>Marine Terminal’s two jetties, servicing vessels of up to 100.000 DWT, with eight separate well equipped berths, enable simultaneous loading / unloading operations that can reach up to 17.000 t of daily discharge rate at each of the two main platforms.<br/></p><p>Jetty No: 1 is 1.200 m long, consists of two platforms (main and coaster), 3 berths and has a 400 mtph (unloading) conveyor capacity, pipelines for various products connect eastern berth of main platform to the tank farm.<br/></p><p>Jetty No: 2 is 1.600 m long, consists of three platforms (main, central, coaster) and 6 berths.<br/></p><p>Storage capacity of the terminal exceeds 1 million t of which 300.000 t is covered storage space. The high capacity bagging unit and the versatile handling system is capable of simultaneous loading of bagged cargo to sea-going vessels and outgoing trucks. There are also 33 separate multipurpose tanks with a total capacity of 176.000 m<sup>3</sup> ranging in size between 500 m3 to 20.000 m<sup>3</sup> for use in the storage of crude oil, edible oils and other liquid commodities.<br/></p><p>Toros facilities’ first expansion works took place between 1983 - 1985.<br/></p><p>The complex consists of an administrational building, housing for key personnel and recreational facilities.<br/></p><p>The new marine terminal was constructed between 1989 - 1990 further expanding the handling and storage capacities of Toros while 3 x 20.000 m<sup>3</sup> capacity crude oil storage tanks were delivered in 2001 also by Tekfen on EPC basis, within a very short time, thus enhancing the capacity of the terminal to its present level.</p>","text_promotion":""},{"id":54,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/97-cover.jpg","project_type":{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/97-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/97-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/97-3.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/97-cover.jpg","commence":"15-12-1978","complete":"19-10-1983","title":"Naphta Steam Cracking Plant Aliağa Petrochemical Complex","slug":"naphta-steam-cracking-plant-aliaga-petrochemical-complex","job_no":"97","portion":100.0,"client":"PETKİM, Petrochemical Co., Inc.","latitude":38.798999,"longitude":26.968227,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>The scope of work is the turnkey construction of Naphta Steam Cracking Plant, complete with all civil works including piling, mechanical works including erection of compressor stations, pumps, exchangers, pipe fabrication and erection, electrical installations, substations and instrumentation including automatic control systems.</p><p>The plant is designed for:</p><ul><li>Ethylene: 300.000 t / year</li><li>Propylene (polymere grade): 70.200 t / year</li><li>Propylene (chemical grade): 67.800 t / year<br/></li></ul><p>Works performed during the erection and construction of the Aliağa Petrochemical Complex, Naphta Steam Cracking Plant are as follows:<br/></p><p><b>A- CONSTRUCTION WORKS</b></p><ul><li>Excavation: 331.053 m<sup>3</sup></li><li>Fill: 135.600 m<sup>3</sup></li><li>Formwork: 99.800 m<sup>3</sup></li><li>Concrete Works: 75.000 m<sup>3</sup></li><li>Reinforcement Steel Works: 3.800 t</li><li>High Tensile Steel Reinforcement: 300 t</li><li>Wire Mesh: 215 t</li><li>Steel Construction: 6.000 t</li><li>Concrete Piping: 1.780 m</li><li>Pile Works: 21.000 m<br/></li></ul><p><b>B- EQUIPMENT ERECTION / INSTALLATION</b></p><ul><li>Total for columns, drums, exchangers, furnace, pumps, turbines, boiler, filter, compressor: 7.058 t</li><li>Installation of pipes: 250.340 m<br/></li></ul><p><b>C- MANUFACTURING AND ERECTION OF TANKS</b></p><ul><li>Total (22 cylindrical and spherical tanks with capacity of 75.000 m<sup>3</sup> ) : 550 t<br/></li></ul><p><b>D- BLASTING AND PAINTING</b></p><ul><li>Sand blasting, brushing and painting of steel pipes and equipment: 185.000 m<sup>2</sup><br/></li></ul><p><b>E- INSULATION</b></p><ul><li>Total : 88.000 m<sup>2</sup><br/></li></ul><p><b>F- ELECTRICAL AND INSTRUMENTATION WORKS</b></p><ul><li>Cable Laying and Grounding: 227.000 m</li><li>Pipe Erection: 40.000 m (copper, stainless steel, overhead)</li><li>Cabling: 310.000 m (two / three or multicore)</li><li>Junction Box Erection: 2.280</li><li>Ex-proof Material Erection : 3.000</li><li>Erection of Copper Busbar: 560 kg</li><li>Earthing Rod: 450</li><li>Panel Erection: 94<br/></li></ul><p>The project was successfully accomplished by Tekfen within the given schedule.</p>","text_promotion":""},{"id":55,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/160-cover.jpg","project_type":{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/160_1_4lNQNYP.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/160_2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/160_3.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/160-cover.jpg","commence":"23-07-1990","complete":"23-07-1993","title":"İzmir Refinery, Hydrocracker And Associated Units","slug":"izmir-refinery-hydrocracker-and-associated-units","job_no":"160","portion":34.0,"client":"TÜPRAŞ, Turkish Petroleum Refineries Co., Inc.","latitude":38.801838,"longitude":26.948975,"contractor":"Tekfen Construction and Installation Co., Inc. - Snamprogetti SpA Consortium","description":"<p>The project scope covers construction of a plant to expand the diesel and other light products capacity of İzmir Refinery, by converting fuel oil into lighter fractions through hydrocracking and distillation processes. The project was successfully completed earlier than the scheduled date.<br/></p><p>The crude oil processing capacity of the refinery was increased by 5 million t / year with the expansion scheme.</p><p></p><p>The plant consists of following process sections:</p><ul><li>Hydrocracking Unit,</li><li>Vacuum Distillation Unit,</li><li>Hydrogen Unit,</li><li>Visbreaker Unit,</li><li>Gas Amine Unit,</li><li>Sulphur Production and Sour Water Scraper Units,</li><li>Turbine Generator and New Power Distribution Center.<br/></li></ul><p>Annually</p><ul><li>Gas Oil production was increased by 280.000 t,</li><li>Gasoline and Naphta, by 260.000 t,</li><li>Kerosene and Jet Fuel, by 200.000 t,</li><li>LPG production was increased by 80.000 t,</li><li>The decrease in production of fuel oil was 1.000.000 t.<br/></li></ul><p>The following engineering works were also performed by Tekfen</p><ul><li>Revision of P &amp; I Diagrams of off-site piping,</li><li>General piping arrangement drawings and isometrics,</li><li>Civil and structural detail designs,</li><li>Preparation of technical specifications, data sheets and MTO lists,</li><li>Supervision of electrical and instrumentation works.<br/></li></ul><p><b>HIGHLIGHTS</b></p><ul><li>Structural Steel: 3.000 t</li><li>Equipment Installation: 10.000 t</li><li>Piping: 3.500 t</li><li>Concrete Works: 32.000 m<sup>3</sup></li><li>Reinforcing Bars: 2.000 t</li><li>Concrete Pile: 5.250 m</li><li>Excavation: 105.000 m<sup>3</sup></li><li>Fill: 110.000 m<sup>3</sup><br/></li></ul><p>Tekfen Engineering Co., Inc. and Tekfen Manufacturing and Engineering Co., Inc. were also responsible for major portions of the project. While Snamprogetti SpA overtook procurement of main units, columns and drums were manufactured in Turkey by Tekfen.</p>","text_promotion":""},{"id":56,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/172-cover.jpg","project_type":{"title":"Chemical","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-chemical.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/172-cover.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/172-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/172-5.JPG","https://api.tekfeninsaat.com.tr/en/media/original_images/172-6.JPG"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/172-cover.jpg","commence":"13-09-1991","complete":"04-03-1993","title":"Coal Washing Plant","slug":"coal-washing-plant","job_no":"172","portion":50.0,"client":"T.K.İ., General Directorate of Turkish Coal Enterprises","latitude":39.628966,"longitude":29.459622,"contractor":"Tekfen Construction and Installation Co., Inc. - CLI Corporation (USA) Consortium","description":"<p>A new and high technology Coal Washing Plant is established in Tunçbilek with the purpose of obtaining maximum amount of premium quality coal with good commercial value by washing and processing coal coming from open - pit and underground mines.<br/></p><p>The project was overtaken on turnkey basis. All design, engineering, procurement and construction works were carried out by TEKFEN - CLI Consortium.</p><p></p><p>The plant includes the following units:</p><ul><li>Coal washing plant,</li><li>3 clean coal silos,</li><li>1 refuse silo,</li><li>Administrative Building,</li><li>Cafeteria,</li><li>Workshop,</li><li>Warehouses and locker rooms,</li><li>7 off-belt conveyors,</li><li>Truck dump,</li><li>Breaker and crusher,</li><li>Thickiner,</li><li>Raw coal pile,</li><li>Middlings pile.<br/></li></ul><p>The plant is designed with the capacity to produce 600 t of clean, fine and coarse coal per hour (3.600.000 t / year) with ash content less than 18%.<br/></p><p>The provided design services were:</p><ul><li>Civil Structural (including the shop drawing),</li><li>Architectural,</li><li>Mechanical and Piping,</li><li>Electrical.</li></ul>","text_promotion":""},{"id":57,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/plant_0004_177.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/plant_0004_177.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/plant_0004_177.jpg","commence":"05-06-1992","complete":"05-07-1994","title":"Nato - Enf High Pressure Fuel Pumping Station","slug":"nato-enf-high-pressure-fuel-pumping-station","job_no":"177","portion":100.0,"client":"NATO - ENF","latitude":38.799445,"longitude":26.970825,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Tekfen Construction and Installation Co., Inc. has successfully completed a number of NATO - ENF / Infrastructure Projects in Turkey since its establishment. İzmir, Aliağa High Pressure Fuel Pumping Station Project is another example of its kind.<br/></p><p>The scope of the project covered construction and erection works of the 90 atm, 240 m<sup>3</sup> / hr capacity high pressure fuel pumping station, manifold and scraper stations, drainage tanks and related connections to the Aliağa Refinery, located nearby.</p>","text_promotion":""},{"id":58,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/plant_0003_186.jpg","project_type":{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/plant_0003_186.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/S14.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/C1-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/C1-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/C1-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/8_2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/8_1.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/plant_0003_186.jpg","commence":"26-11-1993","complete":"26-11-1996","title":"İzmit Refinery, Unicraker And Associated Units","slug":"izmit-refinery-unicraker-and-associated-units","job_no":"186","portion":36.0,"client":"TÜPRAŞ, Turkish Petroleum Refineries Co., Inc.","latitude":40.75319,"longitude":29.765013,"contractor":"Tekfen Construction and Installation Co., Inc. - Snamprogetti SpA (Italy) Consortium","description":"<p>Since its foundation in 1957, Tekfen has become a leading name in the hydrocarbon industry both in Turkey and abroad. Tekfen has participated in the construction and upgrading of five refineries and three petrochemical complexes in Turkey at various capacities from de-bottlenecking to off-site piping, from instrumentation to complete unit erection works.<br/></p><p>Unicracker and Associated Units including Continuous Catalyst Regenerator (CCR) (İzmit Refinery) is among the major accomplishments of Tekfen in this field. The main purpose of the project is erecting a new Unicracker Unit and introducing Continuous Catalyst Regenerator Unit to the existing 3<sup>rd</sup> reformer unit.</p><p></p><p>The project was overtaken by Tekfen - Snamprogetti Consortium on turnkey basis.<br/></p><p>The Unicracker introduces a new technology, in processing the Heavy Vacuum Gas Oil (HVGO) to obtain jet fuel, high standard gasoline, gasoil and LPG.<br/></p><p>Introduction of a Continuous Catalyst Regenerator (CCR) unit to the existing 3rd reformer unit, serves to increase the productivity of the unit by shortening catalyst regeneration time while upgrading the octane of gasoline from 96 to 101.<br/></p><p><b>QUANTITIES OF MAIN ACTIVITIES:</b></p><ul><li>Piling: 1.250 m</li><li>Reinforced Concrete: 26.000 m<sup>3</sup></li><li>Piping: 4.500 t</li><li>Steel Structures: 3.000 t</li><li>Equipment Erection: 8.000 t</li><li>Electrical Cables: 331.000 m</li><li>Instrument Cables: 200.000 m</li><li>Instrument Installation: 3.900</li><li>Pipe Insulation: 76.650 m<sup>2</sup></li><li>Equipment Insulation: 6.250 m<sup>2</sup></li><li>Painting: 126.000 m<sup>2</sup></li><li>Fire Proofing: 1.250 m<sup>3</sup></li></ul>","text_promotion":""},{"id":59,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/193-cover.jpg","project_type":{"title":"Chemical","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-chemical.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/193-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/193-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/193-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/193-1.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/193-cover.jpg","commence":"07-09-1994","complete":"15-08-1996","title":"Sulphur Recovery Unit","slug":"sulphur-recovery-unit","job_no":"193","portion":100.0,"client":"Snamprogetti Ltd.","latitude":36.811714,"longitude":34.640969,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Sulphur Recovery Unit Project is another accomplishment of Tekfen in cooperation with Snamprogetti.<br/></p><p><b>The facility consists of</b></p><ul><li>Amine Treatment Recovery Unit (ATRU),</li><li>Sulphur Recovery Unit (SRU),</li><li>Sulphur Forming Unit (SFU), together with ancillary plant and equipment designed to recover 20 t / day sulphur.<br/></li></ul><p>Sulphur Facility was erected within the existing Mersin Refinery. The fuel gas stream of the refinery is processed to remove substantially all H<sub>2</sub>S and other acid gases to satisfy the environmental regulations.<br/></p><p>Snamprogetti undertook process design, engineering and equipment procurement while the civil and structural works, mechanical and electrical installations, piping and instrumentation works of the facility were executed by TEKFEN, which also provided assistance during commissioning and performance testing works.<br/></p><p><b>HIGHLIGHTS</b></p><ul><li>Piping: 92 t</li><li>Equipment Erection: 472 t</li><li>Concrete Works: 700 m<sup>3</sup></li><li>Steel Structure: 80 t</li></ul>","text_promotion":""},{"id":60,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/317-cover.jpg","project_type":{"title":"Oil & Gas Facility","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-oil-gas.png"},"project_status":"Completed","project_location":"United Arab Emirates","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/317.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/317-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/317-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/317-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/317-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/317-5.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/317.jpg","commence":"01-07-2009","complete":"25-03-2013","title":"Sas/Asab Main Oil Line And Me&I Works At Central Degassing Station","slug":"sas-asab-main-oil-line-and-mei-works-central-degassing-station","job_no":"317","portion":100.0,"client":"Abu Dhabi Company for Onshore Oil Operations (ADCO)","latitude":24.458435,"longitude":54.379477,"contractor":"Petrofac International Limited (PIL) - Tekfen Construction and Installation Co., Inc.","description":"<p>ADCO has committed to increase oil production capacity from 285 mil. barrels per year to 345 mil. barrels per year for the Sahil, Asab, Sahil oil wells.<br/></p><p>Due to this commitment PIL has been awarded a US$2.3 billion contract by ADCO for the full development of the onshore Asab oil field.<br/></p><p>TEKFEN scope covers Main Oil Line (MOL) and Central Degassing Station (CDS) Mechanical, Electrical &amp; Instrumentation Works within given ASAB FFD Project.<br/></p><p>Proposed Main Oil Line will provide oil transfer from proposed CDS to Bab region through 93km pipeline. CDS is planned to be erected in ASAB region which is 150 km far from Abu Dhabi.<br/></p><p>In CDS section of the project, Civil Works, was carried out by other parties.<br/></p><p>PIL handed supply of the main project materials such as MOL 36&quot; pipes, CDS Structural Steel, CDS piping &amp; spooling, CDS equipments.<br/></p><p>TEKFEN scope was covering pre-commissioning works too. During commissioning period, TEKFEN provided the skilled manpower and supervision support.</p><p></p><p><b>MOL</b></p><ul><li>Excavation: 8,900,000 m<sup>3</sup></li><li>Backfilling: 2,900,000 m<sup>3</sup></li><li>Oil Line: 92,547m (36&quot;, 17mm)</li><li>Welding Joints: 7,800 No.</li><li>Fibre optic cable: 93,000m<br/></li></ul><p><b>CDS</b></p><ul><li>Erection of Structural Steel: 22,000 t</li><li>Erection of Piping: 19,000 t</li><li>Erection of Rotating Equipment: 1,500 t</li><li>Erection of Static Equipment: 9,000 t</li><li>Electrical &amp; Instrumentation Cabling: 2,000 km</li><li>Painting for Tanks: 36,500 m<sup>2</sup></li><li>Painting for Piping: 55,000 m<sup>2</sup></li><li>Insulation: 20,800 m<sup>2</sup></li></ul>","text_promotion":""},{"id":61,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/222-cover.jpg","project_type":{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},"project_status":"Completed","project_location":"Uzbekistan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/222-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/222-2.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/222-cover.jpg","commence":"05-02-1998","complete":"31-01-2000","title":"Fergana Refinery Modernization Works","slug":"fergana-refinery-modernization-works","job_no":"222","portion":100.0,"client":"Uzbekneftegas","latitude":40.373492,"longitude":71.799113,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>The project covers the modernization works of the existing Fergana Refinery to produce 1.700.000 t sulphur free diesel from local feedstock gas-oil mixture and 93 octane gasoline from existing units (Reformer 300 / 600) while obtaining 25.000 t / year sulphur.<br/></p><p>The project targets an environment friendly refinery with internationally compatible fuel products and large amount of sulphur which can be consumed by the other industries as raw material.</p><p></p><p>The project scope covered the following process sections</p><ul><li>Hydro-desulphurization Unit,</li><li>Sulphur Recovery Unit,</li><li>Cooling Water Unit,</li><li>Demineralized Water Unit,</li><li>Nitrogen Unit,</li><li>H<sub>2</sub>S Unit,</li><li>Reformer 300 Modernization Works,</li><li>Reformer 600 Modernization Works.<br/></li></ul><p>Main quantities of Fergana Refinery Modernization / Revamp works are</p><ul><li>Excavation / Fill: 70.000 m<sup>3</sup></li><li>Structure Steel: 2.664 t</li><li>Equipment Erection: 4.500 t</li><li>Piping: 90.250 m</li><li>Total Welding (dia - inch): 244.000</li><li>Concrete: 11.961 m<sup>3</sup></li><li>Reinforcing Steel: 685 t</li><li>Cables (power, grounding, lighting): 170 km</li><li>Cable Rack / Duct / Tray: 9.917 m</li><li>Local Instrument, Final Control Element and Room: 3.500 set</li><li>Signal Tubing / Cables: 170 km</li><li>Junction / Switch / Outlet Box: 736 set</li><li>Final Equipment and Machinery Painting: 6.234 m<sup>2</sup></li><li>Surface Preparation, Primary and Final Painting of Pipes: 34.221 m<sup>2</sup></li><li>Pipe Insulation (Hot Tap): 12.789 m<sup>2</sup></li><li>Equipment Insulation (Hot Tap): 3.602 m<sup>2</sup></li><li>Instrument Insulation (Hot Tap): 246 m<sup>2</sup></li><li>Refractory Works: 200 m<sup>3</sup><br/></li></ul><p>Tekfen successfully delivered the EBRD (European Bank for Reconstruction and Development) financed project complying with the highest international construction standards in cooperation with Toyo and Mitsui.</p>","text_promotion":""},{"id":62,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/superstucture-generic.png","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Uzbekistan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/superstucture-generic.png"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/superstucture-generic.png","commence":"01-12-1996","complete":"29-05-1998","title":"Cotton Spinning Mill (Papfen J.S.C.)","slug":"cotton-spinning-mill-papfen-jsc","job_no":"217","portion":100.0,"client":"Papfen J.S.C.*\r\n\r\n* Established as a partnership of Tekfen & Ministry of Light Industry of Uzbekistan.","latitude":41.004914,"longitude":71.643247,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Uzbekistan is well known as a country which lays on the ancient &#x27;&#x27;Silk Road&#x27;&#x27; and famous for its garments throughout the world. As the world&#x27;s second largest cotton exporter, Uzbekistan is overhauling its ginning industry and plans to process half its cotton fiber domestically by 2005.<br/></p><p>The scope of the project undertaken by Tekfen Construction and Installation Co., Inc. covered turnkey construction of a cotton spinning mill consisting of five buildings on an area of 21.000 m<sup>2</sup> at the city of Pap, province of Namangan, Uzbekistan.<br/></p><p>Presently the plant is fully operative with 5.600 t / year cotton spinning and 3.900 t / year yarn production capacity under the ownership (60%) and management of Tekfen Group.<br/></p><p>Machinery-Equipment of the cotton spinning mill were thoroughly supplied by HMB - Hallesche Mitteldeutsche Bau AG, Tekfen&#x27;s affiliate in Germany, under the Hermes guarantee scheme.<br/></p><p>Commissioning, personnel training and start-up operations of Papfen Cotton Spinning Mill were also undertaken by Tekfen under the same project scope.<br/></p><p>Today, roughly 80% of the company&#x27;s total cotton yarn production is exported to Turkey through the marketing organization of Tekfen Foreign Trade Co., Inc.</p>","text_promotion":""},{"id":63,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/energy_0007_298_cU9aHBB.jpg","project_type":{"title":"Energy","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-energy.png"},"project_status":"Completed","project_location":"Bulgaria","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/298-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/298.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/298.jpg","commence":"11-05-2005","complete":"30-10-2010","title":"Maritza East-1 Thermal Power Plant","slug":"maritza-east-1-thermal-power-plant","job_no":"298","portion":8.75,"client":"AES","latitude":42.136375,"longitude":25.865148,"contractor":"Alstom - TGO Consortium Tekfen - Gama Partnership  *Tekfen - Gama Partnership","description":"<p>AES has been granted concession on &quot;built, own, operate and transfer&quot; (BOOT) basis for a 2 x 300 MW lignite-fired thermal Power Plant (ME1) at Galabovo / Maritza, South - East of Bulgaria.<br/></p><p>Tekfen - Gama Partnership, TGO, has been awarded the civil works portion and the turbine/turbine steel construction erection of the turnkey project undertaken by the Consortium (TGO and Alstom Power Generation), the main contractor. The awarded portion of the Maritza East-1 Power Plant Project covers detailed engineering, procurement and construction works.<br/></p><p>ME1 Power Plant Project represents a major step for private sector participation into the Bulgarian market, as it has become one of the country&#x27;s largest foreign investments, to date.<br/></p><p>The project, being Tekfen&#x27;s first in the Balkans, will also be a pioneer scheme providing a strong &quot;demonstration effect&quot; on the environment with its improved technology that will lead Bulgaria to comply with EU standards. EBRD is among the main loan suppliers for the investment scheme.</p><p></p><p><b>HIGHLIGHTS</b></p><ul><li>Concrete: 150.000 m<sup>3</sup></li><li>Reinforcement Bar: 23.000 t</li><li>Form Work: 170.000 m<sup>2</sup></li><li>Sliding and Climbing Formwork: 77.000 m<sup>2</sup></li><li>Steel: 2.500 t</li></ul>","text_promotion":""},{"id":64,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/energy_0006_293_NFkQ9OF.jpg","project_type":{"title":"Energy","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-energy.png"},"project_status":"Completed","project_location":"Kazakhstan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/293-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/293-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/293-1.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/energy_0006_293_NFkQ9OF.jpg","commence":"15-05-2005","complete":"31-07-2009","title":"Kashagan, Power Generation Plant","slug":"kashagan-power-generation-plant","job_no":"293","portion":50.0,"client":"AGIP North Caspian Operating Co. (AGIP KCO)","latitude":47.098926,"longitude":51.928741,"contractor":"GATE (50% Tekfen - 50% GAMA)","description":"<p>Kashagan, an offshore oil field located at the north of the Caspian Sea, Kazakhstan sector (approximately 80 km south of the town of Atyrau), was discovered in July 2000. A group of major international oil companies led by Agip will develop and commission the field. Water depth of the field is barely 4 m while reservoir contains 45 API oil with associated sour gas (up to 23% H<sub>2</sub>S).<br/></p><p>GATE, a partnership of Tekfen and Gama, have undertaken the construction works of the Kashagan Power Generation Plant that will supply electricity with the onshore oil processing and export terminal at Eskene West, Atyrau. The installed capacity of the (Agip owned) Power Plant will be 238 MW.<br/></p><p>GATE’s scope of works cover all construction activities in civil, mechanical, piping, electrical, instrumentation disciplines with the exception of HVAC and pipe insulation works.</p><p></p><p>Major work items and quantities of the project are as follows:</p><ul><li>Civil, general earthworks (excavation and backfill): 49.000 m<sup>3</sup></li><li>Civil, concrete works : 10.500 m<sup>3</sup></li><li>Civil, U/G trench excavation: 14.500 m<sup>3</sup></li><li>Civil, U/G trench backfill: 2.400 m<sup>3</sup></li><li>Civil, Roads: 8.750 m<sup>2</sup></li><li>Structural steel erection: 2.650 t</li><li>Mechanical erection, weight of erected equipment: 3.100 t</li><li>Mechanical erection, alignment, final alignment, and pre-commissioning of:<ul><li>4 Gas Turbines and their Generators in the range of 35-45 MW</li><li>2 Steam Turbines and their Generators of 35 MW (equivalent)</li></ul></li><li>Piping, fabrication/erection: 71.000 WDI</li><li>Piping, painting: 7.800 m<sup>2</sup></li><li>Electrical, cable pulling: 373.000 m</li><li>Instrumentation, cable puling: 123.000 m</li></ul>","text_promotion":""},{"id":65,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/energy_0005_319_3yhHAYV.jpg","project_type":{"title":"Energy","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-energy.png"},"project_status":"Completed","project_location":"Kazakhstan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/319-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/319-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/319-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/319-4.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/energy_0005_319_3yhHAYV.jpg","commence":"18-09-2009","complete":"28-12-2012","title":"Kashagan Field Development Project Tranche - 3 Power Generation Plant","slug":"kashagan-field-development-project-tranche-3-power-generation-plant","job_no":"319","portion":50.0,"client":"Agip Kazakhstan North Caspian Operating Co. N.V.","latitude":47.098926,"longitude":51.928741,"contractor":"GATE (50% Tekfen - 50% GAMA)","description":"<p>Kashagan, an offshore field located at the north of the Caspian Sea, Kazakhstan sector, was discovered in July, 2000. Owned by a group of partners led by Agip, presently Kashagan could prove to be the world&#x27;s fifth largest oil field. The field, 75 km SSE of Atyrau, lies in just 3.7 m of water. The field holds an estimated 7 billion - 9 billion barrels of recoverable oil resources and total geological reserves of 38 billion barrels.<br/></p><p>A Power Plant has been provided as part of the Onshore Processing Plant to provide electrical power to be used by the Onshore Processing Facility (OPF), Eskene West Railway Project (EWRP) and early works camp. The Power Plant includes 110kV outdoor open terminal switchyard and 35kV and 10kV switchgear to facilitate distribution of electrical power. It will also include LV switchgear for turbine auxiliaries and other required supplies. In addition, provision is to be made for connection to overhead 110kV lines which are tied to the Kazakh National Grid system to allow import and export of electricity.<br/></p><p>Heavy duty industrial turbines in the 35-45MWe (ISO) range have been used on this project. The Power Plant has been designed as a manned facility, which can initially operate independently from the OPF. A building will be designed and constructed, sized for three Essential Diesel Generators, together with its day tank and pumps. Three Essential Diesel Generators rated 6.5 MVA, 10 kV, 50 Hz, 1000 rpm shall be installed as part of Tranche 3.</p>","text_promotion":""},{"id":66,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/energy_0004_116_OeriGTA.jpg","project_type":{"title":"Energy","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-energy.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/116-S63.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/energy_0004_116_OeriGTA.jpg","commence":"08-04-1983","complete":"31-05-1988","title":"Construction Of 14 Substation Centers At 14 Different Locations","slug":"construction-14-substation-centers-14-different-locations","job_no":"116","portion":100.0,"client":"TEK, Turkish Electricity Authority","latitude":40.399219,"longitude":32.862074,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Throughout the years, the electrical department of Tekfen, apart from the execution of electrical and instrumentation works of turnkey contracts for refineries, petrochemical plants, pipeline and other industrial plant projects, has been serving the construction industry as a specialized electrical and instrumentation contractor and is the forerunner among the international contractors of Turkey in this field. Construction of 14 substations for Turkish Electricity Authority has also been a major achievement proving Tekfen’s competency in this sector.<br/></p><p>The turnkey project covers engineering, procurement, construction, installation and design works of 14 x 380 kV Transformer Substation Centres at various locations of Turkey.</p><p></p><p>Main construction works consist of the following;</p><ul><li>Excavation of 660.958 m<sup>3</sup> for various foundations and levelling works,</li><li>14.181 m<sup>3</sup> concrete foundation for steel poles and equipment supports,</li><li>Construction of 13.125 m concrete cable trench,</li><li>Outdoor steel construction (2.557 t) for switch-yard poles and equipment supports,</li><li>Construction of foundations for 22 x 380 kV and 6 x 154 kV power transformers,</li><li>Construction of 10.500 m<sup>2</sup> control, switchgear, relay, social and guard house buildings.<br/></li></ul><p>Procurement and erection / installation works consist of;</p><ul><li>26 x 380 kV and 154 kV power transformers and 380 kV reactors, 2 x 380 kV capacitor units, 48 x 420 kV circuit breakers, 177 x 420 kV isolators and 1 x 380 / 320 V, 250 kV automatic diesel generator,</li><li>86 x 170 kV and 36 kV outdoor circuit breakers,</li><li>88 x 170 kV, 36 kV outdoor isolators,</li><li>726 x 420 kV, 170 kV, 36 kV, 17,5 kV voltage and current transformers, lighting arresters,</li><li>10 x 30 / 0,4 kV service transformers,</li><li>82 x 30 kV indoor switchgears, 237 x 380 kV,</li><li>170 kV, 36 kV control, relay and service panels, 59.032 m aluminium busbars, 95,88 m earthing bars, 448.372 m cables of various types.</li></ul>","text_promotion":""},{"id":67,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/energy_0003_119_yRyRl4W.jpg","project_type":{"title":"Metro & Railway","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-metro.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/119-5_1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/119_2.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/energy_0003_119_yRyRl4W.jpg","commence":"19-06-1984","complete":"31-03-1995","title":"Railway Signalization Systems","slug":"railway-signalization-systems","job_no":"119, 148","portion":35.0,"client":"T.C.D.D., Turkish State Railways","latitude":36.584743,"longitude":36.174103,"contractor":"Tekfen - TTE J.V., ISKRA - SEL Consortium (119), TEKFEN - Pakpaş J.V., Marubeni - Nippon Signal Consortium (148)","description":"<p><b>1- İskenderun - Divriği Railway Signalization System (Job No: 119, US$ 45.500.000)</b><br/></p><p>The scheme is the second railway-signalling project executed in Turkey.<br/></p><p>The main construction works completed within the scope of the project were:</p><ul><li>710 km of cable trench excavation,</li><li>2.500 km of underground cable laying,</li><li>76 km of concrete cable channel,</li><li>2.000 m<sup>3</sup> of concrete foundation.</li><li>Total length of the railway : 577 km</li><li>Number of wayside stations : 51</li><li>Number of terminal stations : 4</li><li>Number of main stations : 4</li><li>Number of Centralized Traffic Control Centers : 4<br/></li></ul><p>There are 55 stations on the 577 km long İskenderun - Divriği railway line and each station is a Sub Control Center. The central communication cable providing the connection to the main control is 15 Quad special cable which is specifically designed for this project. Signalling system comprises of the wayside signalling system together with control centers, station control panels, control and indication system, power feeding instruments and protection of level crossings.<br/></p><p>80 sets of ATS (Automatic Train Stopping System) are installed to new age diesel locomotives at TCDD (Turkish State Railways Authority) Eskişehir and Ankara Locomotive Plants. The route of the railway line from İskenderun to Divriği crosses through Narlı - Malatya - Çetinkaya branching stations and 15 Quad of telecommunication cables physically connects the railway signalling system to Adana - Malatya I - Malatya II and Sivas Main CTC (Centralized Traffic Control) Centres. The main purpose of the project is to increase the capacity of the railway transportation system connecting iron ore mines of Divriği to the Steel Mills located at İskenderun.<br/></p><p><b>2- Haydarpaşa - Ankara - Kayaş &amp; Halkalı - Çerkezköy - Kapıkule Railways Signalization System (Job No: 148, US$ 8.500.000)</b><br/></p><p>The project mainly comprises of the installation of a new signalization system for the railway between Kapıkule (Edirne) - Halkalı (İstanbul) covering 23 stations spread on a 276 km line.<br/></p><ul><li>ATS / Automatic Breaking System was installed for the 28 km long Halkalı - Sirkeci line.</li><li>The scope covers the rehabilitation of the railway system between Sincan and Ankara (5 stations, for a distance of 25 km).</li><li>584 km Haydarpaşa - Kayaş section was also furnished with ATS.</li><li>Erection of 4 CTC’s, 26 signal stations and 620 signal poles were also included within the same scope. The number of level crossings were 100.</li></ul>","text_promotion":""},{"id":68,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/181-cover.jpg","project_type":{"title":"Energy","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-energy.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/181-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/181-2.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/energy_0002_181_Lr3H9QQ.jpg","commence":"19-10-1992","complete":"19-12-1993","title":"Atatürk Hepp - Göksun 380 Kv Energy Transmission Line","slug":"ataturk-hepp-goksun-380-kv-energy-transmission-line","job_no":"181","portion":25.0,"client":"TEK, Turkish Electricity Authority","latitude":37.538375,"longitude":38.547708,"contractor":"Demaş - H. Özdil - Tekfen Construction and Installation Co., Inc. Consortium","description":"<p>The Project includes engineering, procurement, construction, installation of 380 kV overhead energy transmission line between Atatürk Dam and Göksun situated at the south-east of Turkey.</p><p></p><p>Main construction works covered:</p><ul><li>Excavation of pole foundations and levelling,</li><li>Concrete foundation steel poles and equipment supports,</li><li>Construction of 13.125 m concrete cable trench,</li><li>Construction of steel poles and equipment supports,</li><li>Conductor stringing, sagging and terminations.<br/></li></ul><p>The route of the OHTL crosses through special zones with harsh climatic conditions.<br/></p><p>The 2 lines are parallel and 360 km in total. The purpose of the construction of the power transmission line is to back up the increasing power demand in western industrial areas of Turkey. North route is 169 km and south route is 170 km in total. 427 poles are constructed in north route and 424 in south route.<br/></p><p>The project is completed within 18 months and it is one of the unique HV energy transmission line projects in Turkey considering the difficult geographical and climatic conditions.</p>","text_promotion":""},{"id":69,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/226-kapak.jpg","project_type":{"title":"Energy","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-energy.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/226-6.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/226-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/226-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/226-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/226-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/226-5.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/energy_0001_226_J0X7KAG.jpg","commence":"01-06-2000","complete":"31-03-2005","title":"Afşin - Elbistan B Thermal Power Plant","slug":"afsin-elbistan-b-thermal-power-plant","job_no":"226","portion":7.5,"client":"E.U.A.Ş., Electricity Generation Company","latitude":38.354746,"longitude":36.982969,"contractor":"led by Mitsubishi Heavy Industries; Tekfen as consortium member.","description":"<p>Located at the south eastern region of Turkey, Afşin - Elbistan B Thermal Power Plant, has a net capacity of 4 x 360 MW.<br/></p><p>Tekfen Construction and Installation Co., Inc. is a member of the EPC contracting consortium lead by Mitsubishi Heavy Industries where Babcock Borsig Power and Mitsubishi Corp. also take part as members.<br/></p><p>The project’s scope covers turnkey construction of a lignite fired power plant and all auxiliary facilities; boilers and coal bunkers, coal preparation system and stockyard, water supply and water treatment systems, flue gas desulphurisation and coal crushing plants, operation, workshop, warehouse, mill repair shop and limestone preparation buildings.<br/></p><p>Tekfen, with its other Turkish partners, proudly proves its skills and capabilities by undertaking responsibility in this mega power plant project where the steel structure fabrication works exceeds 70.000 t.<br/></p><p>Tekfen’s Steel Structure Fabrication Plant which is located at Ceyhan, has manufactured high quality systems according to world standards for this demanding project.</p><p></p><p>MAIN FIGURES AND QUANTITIES</p><ul><li>Steam Generators: 4 x 360 MW</li><li>Stacks: 2 x 150 m</li><li>Steel Structures: 55.000 t</li><li>Boilers &amp; Ducts (erection): 35.000 t</li><li>Refractory Works: 8.500 t</li><li>Insulation Works: 315.000 m<sup>2</sup></li><li>Cladding: 130.000 m<sup>2</sup></li><li>Painting: 1.150.000 m<sup>2</sup></li><li>Concrete: 225.000 m<sup>3</sup></li><li>Electromechanical (erection): 50.000 t</li></ul>","text_promotion":""},{"id":70,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/energy_0000_240_VGnkWxk.jpg","project_type":{"title":"Energy","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-energy.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/240-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/240-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/240-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/240-4_OvDSDbD.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/240.jpg","commence":"09-06-2000","complete":"23-11-2003","title":"İskenderun - Sugözü Thermal Power Plant","slug":"iskenderun-sugozu-thermal-power-plant","job_no":"240","portion":12.0,"client":"İSKEN, Iskenderun Electricity Generation and Trade Co., Inc.","latitude":36.844572,"longitude":35.880884,"contractor":"Consortium led by Siemens Power Generation Group “KWU”","description":"<p>STEAG, Germany is the main shareholder of İSKEN - İskenderun Electricity Generation and Trade Co., Inc., investor of the İskenderun - Sugözü Thermal Power Plant Project, which has a net capacity of 2 x 605 MW.<br/></p><p>Siemens Power Generation Group “KWU” is the leader of the EPC contracting consortium.<br/></p><p>The project’s scope covers turnkey construction of a coal fired power plant and desulphurisation system together with all auxiliary facilities, 2 steam generators and auxiliaries, water supply, water and sewage treatment units, imported coal off-loading jetty, intra-facility coal transportation, slag treatment and sea water cooling systems, operation, offices and warehouse / storage buildings.</p><p></p><p><b>MAIN FIGURES AND QUANTITIES</b></p><ul><li>Steam Generators: 2 x 605 MW</li><li>Stack: 150 m</li><li>Excavation: 2.615.000 m<sup>3</sup></li><li>Fill: 1.650.000 m<sup>3</sup></li><li>Reinforcing Cement: 205.000 m<sup>3</sup></li><li>Reinforcing Steel: 24.000 t</li><li>Flop Protection : 70.000 m<sup>2</sup></li><li>Sea-bed Dredging and Backfilling: 585.000 m<sup>3</sup></li><li>GRP Pipe Laying: 7.500 m<ul><li>(2.400-2.600-2.800 mm)</li><li>(6.700 m on sea-bed)</li></ul></li><li>Jetty: 760 m</li><li>Piling: 10.200 m</li><li>Steel Fabrication: 32.000 t</li><li>Boiler Pressure Parts (erection): 8.000 t</li><li>Insulation: 140.000 m<sup>2</sup></li><li>Painting: 500.000 m<sup>2</sup><br/></li></ul><p>The Power Plant’s annual coal consumption capacity is 3.300.000 t (6.000-6.500 kcal/kg).</p>","text_promotion":""},{"id":71,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/tankage_0005_266_7OT3F4J.jpg","project_type":{"title":"Tankage","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-tankage.png"},"project_status":"Completed","project_location":"Iraq","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/266-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/266-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/266-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/266-4.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/tankage_0005_266_7OT3F4J.jpg","commence":"17-10-2001","complete":"30-01-2006","title":"Baiji, North Refineries 42 Ea. Storage Tanks","slug":"baiji-north-refineries-42-ea-storage-tanks","job_no":"266","portion":100.0,"client":"North Refineries Company (NRC)","latitude":35.012482,"longitude":43.533402,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Tekfen Construction &amp; Installation Co., Inc. undertook and successfully completed numerous prestigious projects in Iraq since early 80&#x27;s.<br/></p><p>LPG, Lube Oils and Asphalt being the main products among the wide production span, 310.000-barrels / day capacity Baiji Refinery is operated by and under the control of NRC, North Refineries Company of Iraq.<br/></p><p>The project is undertaken by Tekfen Construction and Installation Co., Inc. on EPC basis and the scheme covers 20 ea Floating Roof, 22 ea Cone and Dome Roof Crude Oil and Product Storage Tanks of various sizes (up to 42,000 m<sup>3</sup> storage capacity per tank) and all related auxiliaries. The construction works are to be executed on three separate locations in Baiji which are the North Refinery, Selahaddin-1 &amp; Selahaddin-2 Refineries of NRC.<br/></p><p>Weight of the steel plates to be used for tank manufacturing shall reach 12.600 t while total volume of the 42 ea tanks will be 770.000 m<sup>3</sup>.</p>","text_promotion":""},{"id":72,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/176_kapak.jpg","project_type":{"title":"Tankage","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-tankage.png"},"project_status":"Completed","project_location":"Kuwait","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/176_1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/176_3.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/176_kapak.jpg","commence":"30-05-1992","complete":"13-09-1993","title":"KOC - Ahmadi, South Tank Farm","slug":"koc-ahmadi-south-tank-farm","job_no":"176","portion":100.0,"client":"KOC, Kuwait Oil Company","latitude":29.083892,"longitude":48.073519,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>EPC Tankage works were within the scope of Al - Tameer Project launched by Kuwait Oil Company (KOC), following the Gulf Conflict of &#x27;90 - &#x27;91.<br/></p><p>3 x 570.000 bbl (total 273.360 m<sup>3</sup>) and 1 x 166.000 bbl (26.560 m<sup>3</sup>) capacity floating roof crude oil storage tanks and the filling manifold were constructed within 14 months&#x27; period for Kuwait Oil Company.<br/></p><p>Tekfen overtook Design, Engineering, Procurement, Manufacturing, Erection, Testing and Commissioning works of the new tank farm project where Bechtel Int&#x27;l Inc. / USA was responsible for the project management.</p><p></p><p><b>FACTS</b></p><ul><li>Tank Manufacturing and Erection: 6.044 t</li><li>Piping: 2.200 t (dia 20” - 48”)</li><li>Steel Surface Preparation and Painting: 69.280 t</li><li>Insulation: 60.000 m<sup>2</sup></li><li>Structural Concrete Works: 1.950 m<sup>3</sup></li><li>Earthworks (Excavation and Filling): 293.000 m<sup>3</sup></li><li>All Associate Electrical and Instrumentation Works</li><li>Non-Destructive Testing and Commisioning.<br/></li></ul><p>The foundation of the tankage was also designed and constructed by Tekfen; design standard was API 650. Double seal external floating roof and articulated pipe drain with FMC Swivel Joints; automatic breather valve (venting) and automatic level gauge were some particular characteristics of the project successfully accomplished by Tekfen.</p>","text_promotion":""},{"id":73,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/tankage_0003_195_vmgvHvx.jpg","project_type":{"title":"Tankage","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-tankage.png"},"project_status":"Completed","project_location":"Kuwait","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/tankage_0003_195_vmgvHvx.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/tankage_0003_195_vmgvHvx.jpg","commence":"14-01-1995","complete":"30-04-1996","title":"Wafra Tank Farm - Eight Welded Steel Crude Oil Storage Tanks","slug":"wafra-tank-farm-eight-welded-steel-crude-oil-storage-tanks","job_no":"195","portion":100.0,"client":"Kuwait Oil Company - Saudi Arabian Texaco Inc. (Joint Operations)","latitude":28.595265,"longitude":48.108367,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>The scope of the Kuwait Wafra Tank Farm Project covers engineering, manufacturing, procurement, construction, erection, painting, and commissioning works of 5 x 100.000 bbls and 3 x 50.000 bbls fixed roof crude oil storage tanks (as per API 650).<br/></p><p>The project also included EPC works of two manifolds, interconnecting piping works and two flare systems.<br/></p><p>The client, Kuwait Oil Company, KOC is one of the leading product exporters of the Gulf; this specific tank farm was erected as part of the joint operations of KOC and Saudi Arabian Texaco Inc. in Kuwait.</p>","text_promotion":""},{"id":74,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/tankage_0001_296b_4fzv2rQ.jpg","project_type":{"title":"Tankage","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-tankage.png"},"project_status":"Completed","project_location":"Kuwait","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/tankage_0002_296_98FMx6j.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/296-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/296-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/296-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/296-4.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/tankage_0002_296_98FMx6j.jpg","commence":"18-06-2005","complete":"07-07-2007","title":"Enhancement Of Export Facilities, Eight Crude Oil Tanks","slug":"enhancement-export-facilities-eight-crude-oil-tanks","job_no":"296","portion":100.0,"client":"KOC, Kuwait Oil Company","latitude":29.396684,"longitude":47.958531,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>The Enhancement of Crude Export Facilities Project is consisting of the construction of eight new crude oil storage tanks, each with a net operating capacity of 618.000 Bbbls, and their associated facilities in EPCC basis. The purpose of the project is to increase the total crude export capacity and to improve operating reliability and flexibility. The project is developed in two portions:<br/></p><p><b>Portion I</b> - Installation of three tanks, together with all infrastructures necessary to support the receipt, storage and export of crude oil.<br/></p><p><b>Portion II</b> - Installation of five tanks, together with all infrastructures necessary to support the receipt, storage and export of crude oil.<br/></p><p><b>The major activities can be summarized as follows:</b><br/></p><ul><li>Construction of Eight new crude oil tanks, one 48&quot; new filling line header and two 48&quot; sub headers, as well as 3x48&quot; new gravity outlet lines. Connection of the new gravity manifold to the existing gravity loading manifolds.</li><li>Implementing infrastructure for the 8 new tanks comprising foundation, bunds, roads, storm water sewer system, stairways, platforms and impounding basin.</li><li>Provision of tank gauging and management system for the new 8 tanks.</li><li>Installation of a new filling manifold drain pump</li><li>Installation of 2 new firewater pumps with 5.400 USGPM capacities.</li><li>Installation of a new firewater jockey pump with 240 USGPM capacity.</li><li>Construction of 30&quot; firewater main header.</li><li>Installation of 24&quot; firewater ring mains.</li><li>Installation of 2&quot; foam concentrate ring mains.</li><li>Installation of 4 new foam pumps.</li><li>Provision of Fire and Gas Detection System.</li><li>Construction of a new firewater pump house and two new foam pump houses.</li><li>Provision of 4 pieces of portable tank mixers together with mobile trailer for tank dislodging.</li><li>4 new 11 kV / 457 V RMU substations are constructed in the STF, three indoor type and one outdoor. These substations are tied into an 11 kV ring main also part of the scope, with the two ends of the ring supplied from the existing 11 kV substation.</li><li>The 11 kV /457 V RMU substations shall supply all of the permanent electrical loads, including all MOVs, pumps, cathodic protection transformer rectifiers, UPS equipment, area and local lighting, and small power requirements.</li><li>Mounting of a mobile generator on a roadworthy trailer.</li><li>Other electrical systems and equipment which are provided under the Contract include but are not limited to: HV&amp;LV power distribution cable &amp; equipment; controls &amp; instrumentation cable works; un-interruptive power supplies; cathodic protection; indoor, outdoor, non-essential, essential and emergency lighting; earthing; lightning protection, small power and telecommunications.</li><li>Providing lighting, fire protection, H2S detection, electrical and instrumentation and all other necessary infrastructure systems.</li><li>Prelocation of existing substation and the re-routing of associated 11 kV supplies.</li><li>Construction of Evaporation pit for discharging the oily water</li><li>Supply and installation of Filling Manifold Drain Pump</li><li>Supply and installation of H<sub>2</sub>S Scrubber.</li></ul>","text_promotion":""},{"id":75,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/tankage-generic_KsCxyvc.png","project_type":{"title":"Tankage","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-tankage.png"},"project_status":"Completed","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/tankage-generic_KsCxyvc.png"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/tankage-generic_KsCxyvc.png","commence":"28-12-2012","complete":"31-05-2013","title":"Phosphoric Acid Plant, Additional Tanks","slug":"phosphoric-acid-plant-additional-tanks","job_no":"333","portion":100.0,"client":"Ma’aden Phosphate Company","latitude":27.534012,"longitude":49.174883,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>After completion of Phosphoric Acid Plant at Ras Al-Khair by Tekfen (Litwin Consortium), new turnkey contract for Construction of Additional Storage Tanks was awarded by Ma’aden Phosphate Company. The scope of this new EPC contract covers the engineering, material procurement, fabrication, erection and E&amp;I works of 4 x “40% Concentrate Phosphoric Acid Tanks” and 2 x “48% Concentrate Phosphoric Acid Tanks”, totally 10.800 m<sup>3</sup> storage capacity.</p><p></p><p><b>HIGHLIGHTS</b></p><ul><li>Excavation: 6497 m<sup>3</sup></li><li>Backfilling: 4605 m<sup>3</sup></li><li>Structural Reinforced Concrete: 4323 m<sup>3</sup></li><li>Rebar: 370 t</li><li>Structural Steel: 269 t</li><li>Piping: 174 t</li><li>Cabling: 12.000 m</li></ul>","text_promotion":""},{"id":76,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/tankage_0000_101_8cAnu5i.jpg","project_type":{"title":"Tankage","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-tankage.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/101-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/101-2.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/tankage_0000_101_8cAnu5i.jpg","commence":"02-07-1979","complete":"30-06-1983","title":"Construction Of Complete Tank Farm For Central Anatolian Refinery","slug":"construction-complete-tank-farm-central-anatolian-refinery","job_no":"101","portion":100.0,"client":"TPAO, Turkish Petroleum Co., Inc.","latitude":39.839705,"longitude":33.509706,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>The scope of the Tank Farm Project is the construction, erection and insulation of 79 cylindrical and 4 spherical tanks, including complete civil works. In this farm, 28 tanks have mixers and 58 tanks have floor-heating systems for sludge prevention. Total weight of steel material used is 24.000 t and total storage capacity is 7.600.000 bbl (1.216.000 m<sup>3</sup>).</p><p></p><p><b>CAPACITY OF THE TANK FARM</b></p><ul><li>3 floating roof tanks each with capacity of 135.430 m<sup>3</sup> (850.000 bbl)</li><li>2 floating roof tanks with 63.000 m<sup>3</sup> (400.000 bbl)</li><li>4 conical roof tanks with 34.600 m<sup>3</sup> (216.250 bbl)</li><li>4 conical roof tanks with 23.540 m<sup>3</sup> (148.000 bbl)</li><li>4 conical roof tanks with 15.780 m<sup>3</sup> (98.625 bbl)</li><li>4 floating roof tanks with 15.780 m<sup>3</sup> (98.625 bbl)</li><li>8 conical roof tanks with 10.670 m<sup>3</sup> (66.700 bbl)</li><li>6 floating roof tanks with 10.670 m<sup>3</sup> (66.700 bbl)</li><li>2 special tanks with (conical and floating roof) 10.670 m<sup>3</sup> (66.700 bbl)</li><li>3 conical roof tanks with 8.200 m<sup>3</sup> (51.250 bbl)</li><li>10 conical roof tanks with 5.200 m<sup>3</sup> (32.500 bbl)</li><li>6 floating roof tanks with 5.200 m<sup>3</sup> (32.500 bbl)</li><li>1 special tank with (conical and floating roof) 5.200 m<sup>3</sup> (32.500 bbl)</li><li>2 conical roof tanks with 3.360 m<sup>3</sup> (31.000 bbl)</li><li>14 conical roof tanks with 1.890 m<sup>3</sup> (11.815 bbl)</li><li>6 floating roof tanks with 1.890 m<sup>3</sup> (11.815 bbl)</li><li>3 spherical tanks each with maximum capacity of 3.000 m<sup>3</sup> (18.750 bbl)</li><li>1 spherical tank with maximum capacity of 1000 m<sup>3</sup> (6.250 bbl)<br/></li></ul><p>The scope covering off-site piping and auxiliary units, off-site collectors, fire fighting, oily and salty water systems, foam lines, loading / unloading facilities; 33 service buildings, 6 control and 6 substation buildings were constructed by Tekfen under a separate contract signed with the client, TPAO.</p>","text_promotion":""},{"id":77,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/322-kapak.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Azerbaijan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/322-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/322-2.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/322.jpg","commence":"23-06-2010","complete":"28-02-2015","title":"The New Management Office Of Socar","slug":"new-management-office-socar","job_no":"322","portion":100.0,"client":"SOCAR (The State Oil Company of the Azerbaijan Republic)","latitude":40.408273,"longitude":49.867304,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<h3><a href=\"https://youtu.be/MxZaWoaNpdE\">Project Movie »</a></h3><p></p><hr/><p><br/></p><p>The New Management Office of Socar, is a 40-storey (2 basement Floor &amp; 38 above ground floors), 200 m. tall high rise building (100.000 m<sup>2</sup> GFA) consisting of office spaces and lounges on the tower and conference rooms, cafeteria, restaurant and fitness club on the podium which can be operated separately after business hours. The project is located along Heydar Aliyev Avenue, which is one of the main roads to connecting the city center area to the international airport of Baku. The location of the project gives strong impression to visitors coming to Baku.</p><p></p><p><b>Main Project Work Volumes</b></p><ul><li>Earthworks: 46.498.03 m<sup>3</sup></li><li>Concrete: 92.425.00 m<sup>3</sup></li><li>Steel Re-Bar: 11.844.16 ton</li><li>Formwork: 176.142.00 m<sup>2</sup></li><li>Structural Steel: 6.291.00 ton</li><li>Facade: 33.790.00 m<sup>2</sup></li><li>Mechanical Works</li><li>Electrical Works</li><li>Architectural Works</li><li>Interior Works</li><li>BMS System</li></ul>","text_promotion":""},{"id":78,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/338-kapak.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Azerbaijan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/36-GS8_3572.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/82-Baku-Stadium-9.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/17-GS8_2322.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/72-GS8_3372.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/58-GS8_3285.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/Baku-Closing-Ceremony-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/Baku-Olimpia.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/Baku-Opening-Ceremony-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/43-GS8_3105.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/46-GS8_3110.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/338.jpg","commence":"27-02-2013","complete":"28-02-2015","title":"Baku Olympic Stadium Project","slug":"baku-olympic-stadium-project","job_no":"338","portion":100.0,"client":"SOCAR (The State Oil Company of the Azerbaijan Republic)","latitude":40.408273,"longitude":49.867304,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<h3><a href=\"https://youtu.be/AzXdJ9AUMJ4\">Project Movie 1 »</a> <a href=\"https://youtu.be/ZgIpM7NjZbw\">2 »</a> <a href=\"https://youtu.be/aBDPI4GahGk\">3 »</a></h3><p></p><hr/><p><br/></p><p>Baku Olympic Stadium Project which is located near the Boyuk Shor Lake, Baku, Azerbaijan will have a capacity of 68.000 seats. 496.000 m<sup>2</sup> total site area, 204.000 m<sup>2</sup> gross floor area of the Stadium contains commercial areas and disabled, public, media, CIP, VIP and VVIP Sections.<br/></p><p>Tekfen Construction and Installation Co., Inc. has been awarded for completion of the Design and Build Olympic Stadium Project in Baku , the work has been commenced after the notice to proceed issued on 27.02.2013, planning the completion of the Project within a period of 24 months.<br/></p><p><b>Main Project Work Volumes</b></p><ul><li>Overall Design Works</li><li>Earthworks: 7.500.000 m<sup>3</sup></li><li>Reinforced Concrete: 360.000 m<sup>3</sup></li><li>Steel Re-Bar: 55.000 ton</li><li>Formwork: 415.000 m<sup>2</sup></li><li>Structural Steel: 23.000 ton</li><li>Facade: 35.000 m<sup>2</sup> and Roof Cover: 38.000 m<sup>2</sup></li><li>Sports Facilities</li><li>Mechanical Works</li><li>Electrical Works</li><li>Architectural Works</li><li>Interior Works</li><li>Elevators and Escalators</li></ul>","text_promotion":""},{"id":79,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/349-kapak.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Azerbaijan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/01-GS8_5860.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/27-DJI_0041.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/16-066-DJI_0021.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/04-GS8_5880.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/349-night-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/349-detail-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/12-GS8_5858.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/349-detail-2.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/349-tax.jpg","commence":"01-09-2016","complete":"31-08-2018","title":"The New Management Tower Of Ministry Of Taxation Of Azerbaijan","slug":"new-management-tower-ministry-taxation-azerbaijan","job_no":"349","portion":100.0,"client":"Ministry of Taxation of Republic of Azerbaijan","latitude":40.408273,"longitude":49.867304,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<h3><a href=\"https://youtu.be/b36mb7AQjI8\">Project Movie »</a></h3><p></p><hr/><p><br/></p><p>The New Management Tower of Ministry of Taxation of Azerbaijan Republic, is a 33-storey (2 basement Floor &amp; 31 above ground floors), 168 m tall high rise building (44.270 m<sup>2</sup> GFA) consisting of office spaces, lounges on the tower and conference rooms, cafeteria, restaurant and fitness club on the podium which can be operated separately after business hours. Building embraces the essence of energetic city of Baku while meeting the needs of Ministry occupants under one roof in an exceptional signature structure. The distinctive design will make The Ministry of Taxation Management Tower Project a classic of 21st century modern architecture.</p><p></p><p><b>Facts and Figures</b></p><ul><li>Concrete: 19.523.00 m<sup>3</sup></li><li>Steel Re-Bar: 4.883.00 ton</li><li>Formwork: 80.556.00 m<sup>2</sup></li><li>Post Tension: 212.818.00 kg</li><li>Structural Steel: 1.476.00 ton</li><li>Facade: 35.375.00 m<sup>2</sup></li></ul>","text_promotion":"The New Management Tower of Ministry of Taxation of Azerbaijan Republic, is a 33-storey (2 basement Floor & 31 above ground floors), 168 m tall high rise building (44.270 m2 GFA) consisting of office spaces, lounges on the tower and conference rooms, cafeteria, restaurant and fitness club on the podium which can be operated separately after business hours."},{"id":80,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/civil_0011_259.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Georgia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/civil_0011_259.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/civil_0011_259.jpg","commence":"15-05-2001","complete":"20-10-2002","title":"Prof. Gudushauri General Hospital Rehabilitation","slug":"prof-gudushauri-general-hospital-rehabilitation","job_no":"259","portion":40.0,"client":"Ministry of Health, Georgia","latitude":41.7211,"longitude":44.825798,"contractor":"Tekfen Construction and Installation Co., Inc. - Hallesche Mitteldeutsche Bau A.G.* J.V.  *(HMB, Germany is a Tekfen affiliate)","description":"<p>The Project’s scope covered rehabilitation of 52.000 m<sup>2</sup> existing hospital facilities while providing all system, infrastructure works and furniture requirements of the Prof. Gudushauri General Hospital in Tbilisi, Georgia.<br/></p><p>The project was successfully executed and delivered according to the schedule. Geotek, a partnership of Tekfen with Georgian International Oil Company, has participated in this project as general subcontractor to HMB - Tekfen J.V.</p><p></p><p>MAIN QUANTITIES</p><ul><li>Reinforced Concrete (C35): 6.800 m<sup>3</sup></li><li>Lean Concrete (C20): 5.000 m<sup>3</sup></li><li>Reinforcing Steel: 520 t</li><li>Steel Structures: 130 t</li><li>Suspended Ceiling: 17.000 m<sup>2</sup></li><li>Plastering and Painting: 37.800 m<sup>2</sup></li><li>Ceramic Tile: 19.000 m<sup>2</sup></li><li>Leveling Concrete: 51.000 m<sup>2</sup></li><li>Marble: 1.100 m<sup>2</sup></li><li>Roofing Works: 9.000 m<sup>2</sup></li><li>Doors, Windows, Partitions: 6.800 m<sup>2</sup></li><li>Furniture: 260 units<br/></li></ul><p>Complete electrical, mechanical and instrumentation works, sanitary and waste treatment system, underground water reservoirs (560 t), boiler house, power transformer room and spare generator units were also included within the project scope.</p>","text_promotion":""},{"id":81,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/289-kapak.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Kazakhstan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/289-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/289-2.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/289-kapak.jpg","commence":"24-12-2004","complete":"30-07-2010","title":"Kashagan Industrial Area Buildings","slug":"kashagan-industrial-area-buildings","job_no":"289, 290","portion":50.0,"client":"AGIP Kazakhstan North Caspian Operating Co. N.V.","latitude":47.097523,"longitude":51.923935,"contractor":"GATE (Tekfen Construction and Installation Co., Inc. - Gama partnership)","description":"<p>Kashagan, an offshore field located at the north of the Caspian Sea, Kazakh territory, was discovered in July 2000. Owned by a group of partners led by Agip, presently Kashagan could prove to be the world&#x27;s fifth largest oilfield. The field, 75 km SSE of Atyrau, lies in just 3,7 m of water.<br/></p><p>GATE, a partnership between Tekfen and Gama, has undertaken Kashagan Industrial Area Buildings scheme of which the scope covers &#x27;Detailed Engineering, Procurement &amp; Construction&#x27; works of nine buildings as part of the (future) Oil and Gas Processing Terminal of AGIP KCO at Eskene West, Atyrau.</p><p></p><p><b>HIGHLIGHTS</b></p><ul><li>Main Gate House: 127 m<sup>2</sup></li><li>Laboratory: 1.851 m<sup>2</sup></li><li>Electrical &amp; Instrumentation Workshop: 1.555 m<sup>2</sup></li><li>Warehouse: 1.901 m<sup>2</sup></li><li>Fire Station: 1.485 m<sup>2</sup></li><li>Central Control Building: 3.610 m<sup>2</sup></li><li>Change Room: 370 m<sup>2</sup></li><li>Temporary Refuge: 485 m<sup>2</sup></li><li>Mechanical Workshop: 4.052 m<sup>2</sup></li><li>Additional Temp. Refuge Building: 110 m<sup>2</sup></li><li>Additional Warehouse: 2.000 m<sup>2</sup></li></ul>","text_promotion":""},{"id":82,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/civil-350-kapak.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Kazakhstan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/civil-350-kapak.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/350-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/350-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/350-3.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/civil-350-kapak.jpg","commence":"15-08-2016","complete":"30-09-2019","title":"Construction Compound Main Works","slug":"construction-compound-main-works","job_no":"350","portion":50.0,"client":"Tengizchevroil (TCO)","latitude":46.148492,"longitude":53.391678,"contractor":"GATE - (Tekfen Construction and Installation Co., Inc. - Gama partnership)","description":"<p>Tengizchevroil(TCO) is undertaking large-scale expansion of capacity at the existing Tengiz oil field through development of Future Growth Project/Wellhead Pressure Management Project (FGP/WPMP).<br/></p><p>To support the FGP/WPMP, a new Construction Compound (CC) is required to be constructed to the north and west of the existing North Contractors Compound at Tengiz. The overall dimension of the plot is approximately 1,100 m by 2,140 m.<br/></p><p>The CC when complete will provide the base locations for the FGP/WPMP project management and the offices of the contractors working on the project. It will also be the main material handling facility for the project.</p>","text_promotion":""},{"id":83,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/civil_0008_358.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Kazakhstan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/civil_0008_358.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/civil_0008_358.jpg","commence":"15-05-2017","complete":"26-03-2020","title":"Construction And Installation Of Temporary Construction Facilities","slug":"construction-and-installation-temporary-construction-facilities","job_no":"358","portion":50.0,"client":"Tengizchevroil (TCO)","latitude":46.148492,"longitude":53.391678,"contractor":"GATE - (Tekfen Construction and Installation Co., Inc. - Gama partnership)","description":"<p>Tengizchevroil(TCO) is undertaking large-scale expansion of capacity at the existing Tengiz oil field through development of Future Growth Project (FGP), which includes 3GP (Third Generation Project), 3GI(Third Generation Injection) and GA (Gathering Area).<br/></p><p>Temporary Construction Facilities(TCFs) has been designed to support construction activities for 3GP, 3GI and GA. TCFs are required to be constructed around the periphery of the main plots at 3GP, 3GI and at various location within the GA.<br/></p><p>Project duration is 18.5 Months after Contract signature.<br/></p><p>Project consist of 41 Facilities separated in 7 different types, which are, Mess Hall, Tengiz Construction Team (TCT) Office, Local Security Control Room (LSCR), SIMOPS Office, Driver Welfare Building, Medical Center, Ambulance Garage.<br/></p><p>For all type of Temporary Construction Facilities, Civil, Infrastructural, Structural, Architectural, Mechanical, Electrical, HVAC, F&amp;G and IT/Telecommunication Works will be performed.</p><p></p><p><b>FACTS AND FIGURES</b><br/></p><p>Scope:<br/> The project scope includes foundation and erection of 19 Mess Halls and Detailed Engineering, Procurement, and Construction (EPC) services to supply, install, and commission the facilities including all associated works of all other refurbished buildings.</p><p></p><p>Temporary Construction Facilities are summarized as below:</p><ul><li>Mess Hall - 19 Ea / Total 40.563 m²</li><li>Tengiz Construction Team (TCT) Office - 3 Ea / Total 3.346 m²</li><li>Local Security Control Room (LSCR) - 2 Ea / Total 532 m²</li><li>SIMOPS Office - 3 Ea / Total 2.335 m²</li><li>Driver Welfare Building - 9 Ea / Total 2.620 m²</li><li>Medical Center - 3 Ea / Total 1.248 m²</li><li>Ambulance Garage - 2 Ea / Total 414 m²</li></ul>","text_promotion":""},{"id":84,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/43-CS4_4115.jpg","project_type":{"title":"Oil & Gas Facility","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-oil-gas.png"},"project_status":"Completed","project_location":"Kazakhstan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/43-CS4_4115.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/44-CS4_4306.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/38-GS8_8880.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/51-GS8_9237.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/43-CS4_4115.jpg","commence":"24-11-2017","complete":"31-05-2024","title":"Area 51 Multi Well Pad: Civil, Mechanical, Electrical And Instrumentation Installation Project","slug":"area-51-multi-well-pad-civil-mechanical-electrical-and-instrumentation-installation-project","job_no":"361","portion":100.0,"client":"Tengizchevroil (TCO)","latitude":46.148492,"longitude":53.391678,"contractor":"GATE - (Tekfen Construction and Installation Co., Inc. - Gama partnership)","description":"<p>Tengizchevroil (TCO) is a leading company which Joint venture between Chevron- Exxon Mobile- Kazmunaygaz and Lukoil in Kazakhstan, that produces oil, gas and associated products that fuels in Tengiz Oil Field. Tengiz is located on the 2.500 square kilometer (1.600 square mile) project license area which includes the Tengiz field, and a smaller but sizable Korolev field and several exploratory prospects. Total recoverable crude oil in the Tengiz and Korolev fields is estimated to be 1.4 billion metric tonnes (11,5 billion barrels) with 200 million metric tonnes (1.6 billion barrels) in the Korolev field.Tengiz field is one of the world&#x27;s deepest developed super giant oil fields, with the top of the reservoir at about 4.000 meters (13.000 feet). Tengiz reservoir is 20 kilometers (12 miles) wide by 21 kilometers (13 miles) long. The oil column measures an incredible one mile thick. Estimated oil in place in the Tengiz Field is 3.2 billion tonnes (25.5 billion barrels), with 200 million tonnes (1.6 billion barrels) in the Korolev Field. Total recoverable crude oil between the two fields is estimated at 890 million to 1.3 billion tonnes (7.1 billion to 10.9 billion barrels).</p><p>The integrated Future Growth Project – Wellhead Pressure Management Project (FGP – WPMP) is designed to further increase total daily production from the Tengiz reservoir and maximize the ultimate recovery of resources. WPMP will keep the existing Tengiz plants full by lowering the flowing pressure at the wellhead and then boosting the pressure to the inlet requirements of the six existing processing trains.</p><p>FGP – WPMP is the third-generation expansion project in a 20-year process that has steadily increased production from the Tengiz oil field. FGP-WPMP will reinject all the naturally occurring hydrogen sulfide, or sour gas, produced during oil processing. Sour gas injection helps maintain the pressure in the reservoir and will increase daily crude oil production from Tengiz by approximately 260,000 barrels per day. This technology was successfully developed and proven during TCO’s expansion in 2008.</p><p>Tengizchevroil LLP (TCO) has sanctioned KPJV, a joint venture between Fluor, Kazakh Institute of Oil and Gas JSC, Engineering Company KAZGIPRONEFTETRANS LLP, and WorleyParsons, to provide detailed engineering, procurement, and construction management support services for the Future Growth Project—Wellhead Pressure Management Project.</p><p>TEKFEN has been awarded to a contract from TCO as one of the biggest contractors in the main project FGP. Contract includes the execution of all Construction Works for Civil Works, Mechanical and Piping Erection, Piping Fabrication, Electrical and Instruments Installation.</p><p></p><p><b>Facts and Figures</b></p><p>4 Metering Stations; 13 Well Pads (8 MWP &amp; 5 DP); Site preparation; Piling Works; Civil Works; Concrete Works; Mechanical Works; Electrical &amp; Instrumentation Works; Modifications to Existing Field Facilities at 35 Brownfield Areas.<br/><br/></p><p><b>Additional Pipeline Construction Scope Work</b></p><p><b>Start Date:</b></p><p>01/01/2021</p><p><b>Completion Date:</b></p><p>15/05/2023 (Expected)</p><p><b>Pipeline Construction and Pre-Commissioning</b></p><p>GATE Pipeline Scope consists of Construction and Pre-Commissioning 11 each Pipelines. 5 each High-Pressure High-Temperature line and 6 each Conventional Pipelines in total 67 km in length.</p><p>FGP Project pipelines design requires anchor blocks ,which are underground reinforced concrete structures to anchor pipeline through anchor flanges. These anchor structures are located before underground/above ground transition. 20 each anchor blocks are constructed, in total 7.434 m<sup>3</sup> reinforced concrete work is completed.</p><p>The scope consists of 625 crossing of existing structures such as, pipelines, underground cables, overhead lines. Among 625 crossing 24 each Trenchless Crossing using Auger Boring Method in total 804 meters is completed successfully.</p><p>Pre-Commissioning including Hydrotest works scope which are in brief as follows,</p><p>Cleaning, Gauging, Hydrotesting, Intelligent Pigging (In-Line Inspection), Dewatering, Swabbing, Piping Reinstatement, Drying ( -40oC Dew Point) and Nitrogen Purging.</p><p>67,094-meter in-line inspection experience, pig run with water medium is completed on 14 March 2023.</p><p>In-Line Inspection as clever pigging is utilized to determine</p><ul><li>Hi Resolution Geometry and XYZ Mapping of Pipeline</li><li>All Through Wall Thickness Scan (Magnetic Tool for Conventional Lines of wall thickness from 7.92 to 19.05 mm, Ultrasonic Tool for High Pressure High Temperature Lines wall thickness 57.5 mm)</li></ul><p>High Pressure High Temperature (HPHT) Pipelines are unique in design and constructed first time in the World. These lines have underground reinforced concrete boxed expansion loops located at 200-to-300-meter intervals and 93 each in total. Welding thickness is 55 mm narrow gap J bevel with automatic welding. Each end of pipe is counterbored to reach max 0.75mm Hi-Lo requirement. Counterboring depth is 300 mm for each pipe end. Cold bending is not allowed, and HPHT pipelines routing achieved only with hot-bends and elastic bending.</p>","text_promotion":""},{"id":85,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/80A.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Kuwait","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/80A.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/80A.jpg","commence":"12-08-1979","complete":"26-04-1982","title":"Aqila Water Reservoir","slug":"aqila-water-reservoir","job_no":"80A","portion":50.0,"client":"Ministry of Electricity and Water, Kuwait","latitude":29.391898,"longitude":47.966771,"contractor":"Tekfen Construction and Installation Co., Inc., - Sangamo Group (USA) J.V.","description":"<p>Project scope covered turnkey construction of 2 reinforced concrete buried water reservoirs, each 190 m wide, 185 m long, 5,6 m high and with 38 million gallons capacity, including instrumentation, piping, testing and commissioning works.<br/></p><p>Tekfen worked in cooperation with Sangamo Group of USA, as a joint and equal partner.<br/></p><p>Main bill of quantity items were:</p><ul><li>250.000 m<sup>3</sup> excavation,</li><li>50.000 m<sup>3</sup> of different grades of water-tight concrete,</li><li>3.500 t of reinforcing steel.</li></ul>","text_promotion":""},{"id":86,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/civil_0007_357.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Qatar","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/44-GS8_1244.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/civil_0007_357.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/42-AlThu-32.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/33-GS9_7127.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/38-AlThu-26.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/13-GS9_7107.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/05-GS8_0702.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/24-GS8_0792.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/03-AlThu-13.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/02-AlThu-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/32-GS8_0759.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/thumama-new-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/thumama-new-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/thumama-new-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/thumama-new-4.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/357-qatarstadium.jpg","commence":"01-03-2017","complete":"01-06-2021","title":"Al-Thumama Stadium Project","slug":"al-thumama-stadium-project","job_no":"357","portion":50.0,"client":"The Supreme Committee for Delivery & Legacy (SC)","latitude":25.235236,"longitude":51.532199,"contractor":"Tekfen Construction and Installation Co., Inc., JV &Al Jaber Engineering L.L.C","description":"<h3><a href=\"https://youtu.be/wp15UaoEjK0\">Project Movie »</a></h3><p></p><hr/><p><br/></p><p>The Fifth Precinct Stadium will be one of the eight stadiums which will host matches in the 2022 FIFA World Cup Qatar (the Tournament); the stadium will be the host venue for the group, knockout and quarter-final matches. The stadium in Al Thumama is located in one of the most rapidly developing areas of Doha, in an area of 515,400 square meters that already comprises four outdoor training pitches and office facilities currently used by the Qatar Football Association Technical Committee.<br/></p><p>The Stadium shall be designed and constructed to meet the Federation lnternationale de Football Association (FIFA) standards in Tournament mode and will house minimum 40.000 Net spectators during the Tournament. After the World Cup, Stadium will be converted into a legacy mode as an approximately 20.000 seat stadium and a sport city for local football clubs, complemented by other mixed uses.<br/></p><p>Tekfen-Al Jaber Engineering Joint Venture has been invited by the Qatar Supreme Committee for Delivery and Legacy to sign the agreement for the turnkey delivery of the engineering and construction work of the &quot;Main Works for the Fifth Precinct Stadium&quot; Project, where games the 2022 Qatar World Cup will be held.<br/></p><p><b>Main Figures</b></p><ul><li>Overall Design Works</li><li>Earthworks: 120.000 m<sup>3</sup></li><li>Reinforced Concrete: 85.000 m<sup>3</sup></li><li>Steel Re-Bar: 12.900 ton</li><li>Formwork: 250.000 m<sup>2</sup></li><li>Structural Steel: 10.500 ton</li><li>Facade: 24.836 m<sup>2</sup></li><li>Roof Cover: 35.327 m<sup>2</sup></li><li>Sports Facilities: Net 40.000 Nos seats</li><li>Mechanical Works: 1 Main Pitch &amp; 10 Training Pitches</li><li>Electrical Works</li><li>Architectural Works: 120.000 m<sup>2</sup> (Total building Built-up Area)</li><li>Landscape Works: 380.000 m<sup>2</sup></li><li>Elevators and Escalators: 28 Elevator &amp; 1 Escalator</li></ul>","text_promotion":"The Fifth Precinct Stadium will be one of the eight stadiums which will host matches in the 2022 FIFA World Cup Qatar; the stadium will be the host venue for the group, knockout and quarter-final matches. The stadium in Al Thumama is located in one of the most rapidly developing areas of Doha, in an area of 515,400 square meters that already comprises four outdoor training pitches and office facilities currently used by the Qatar Football Assoc. Technical Committee."},{"id":87,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/civil-generic_0uKAf6v.png","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Qatar","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/civil-generic_0uKAf6v.png"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/civil-generic_0uKAf6v.png","commence":"08-03-2018","complete":"31-10-2018","title":"Design & Build Of Celebration Pavilion Extension And Modifications Of The Existing Building At Ai Bidda Park","slug":"design-build-celebration-pavilion-extension-and-modifications-existing-building-ai-bidda-park","job_no":"364","portion":100.0,"client":"PEO-Private Engineering Office","latitude":25.299758,"longitude":51.518634,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>The Pavilion Building located at Al Bidda Park in Doha/Qatar is a hallmark structure that is solely built for the celebration of the Qatar National Day observed on December 18<sup>th</sup> each year.<br/></p><p>The project is prepared for the design and construction of modifications and extension works for this structure.<br/></p><p>The scope, facts, and figures for this project are given as a list below.<br/></p><p><b>FACTS AND FIGURES</b><br/></p><p><b>Steel Canopy Works</b></p><ul><li>Existing shading is removed and disposed of carefully. (Approximately 720 m<sup>2</sup>)</li><li>Newly designed steel canopy, in compliance with the client’s aesthetic requirements is constructed. The New Canopy; the signature feature of the project, overhangs more than 20 meters without intermediate supports and covers over 2800 m<sup>2</sup> area.<br/><br/><i>Approximately 450 tons of Structural Steel is used.</i><br/><i>Approximately 6000 m</i><i><sup>2</sup></i><i> Aluminum cladding material is used. (Top, Bottom, Sides)</i><br/></li></ul><p><b>Renovation of Existing Structure</b></p><ul><li>Existing VIP Lounge is rearranged to accommodate a seating area and a private bedroom for His Highness the Emir</li><li>VIP toilets are re-purposed to allow one handicapped and one standard stall. The rest of the space is re-arranged as one VIP bathroom and one dressing room. An access between the new VIP bedroom and the new VIP bathroom is arranged as accordingly.</li><li>Existing Control Room and Meeting room is turned into a VIP lounge with brand new furniture.<br/></li></ul><p><b>Extension of RC Bleachers, Additional Works</b></p><ul><li>The existing bleachers are extended to the left and right side (Approximately 1200 m<sup>2</sup>) to increase the seating capacity.</li><li>A new Clinic, a new elevator and a new multiple stall public restroom are constructed on the area between the extended bleachers and existing building at the Souq Waqif side</li><li>A new Control Room, a new Security Room, a new IT Room, a new meeting room, a new elevator and a new multiple stall public restroom are constructed on the area between the extended bleachers and existing building at the West Bay side.<br/><br/> <i>Approximately 310 tons of reinforcement steel is used.</i><br/> <i>Approximately 2100 m</i><i><sup>3</sup></i><i> concrete is used.</i><br/> <i>Approximately 250 m</i><i><sup>3</sup></i><i> lean concrete is used.</i><br/></li></ul><p><b>Mechanical Works</b></p><ul><li>Supply and installation of ducted type split air conditioning units (Clinic), VRV system for the new VIP lounge &amp; security room, Fresh air handling Unit, Exhaust fans, G.I Ducts, Insulation, Dampers &amp; air outlets.</li><li>Supply &amp; Installation of PPR pipes with necessary valves and fittings for cold water and hot water pipes</li><li>Supply &amp; Installation of UPVC pipes and fittings with necessary fittings, sprinklers, valves and fittings for the new extension areas.</li><li>Supply &amp; Installation of sanitary fixtures.<br/></li></ul><p><b>Electrical Works</b></p><ul><li>Supply &amp; Installation of 230 spots and 116 Line Grazers for panoramic lighting of cantilever Canopy with a bottom area of 2800 m<sup>2</sup>.</li><li>Electrical Installation for small power with all necessary cable tray, conduits, wires, cables including termination</li><li>Supply &amp; Installation of Earthing &amp; Lightening system</li><li>Supply &amp; Installation of Lighting fixtures including all necessary conduits, wires, terminals, ballast, transformers etc.</li><li>Supply &amp; Installation of Access control system for the new extension areas</li><li>Supply &amp; Installation of CCTV system for the new extension areas</li><li>Supply &amp; Installation Fire Alarm &amp; Detection System for the new extension areas.</li><li>Supply &amp; Installation two new LV distribution boards for the new electrical loads.</li><li>Electrical installation for power cables to mechanical equipment’s in new extension areas.</li><li>Supply &amp; Installation Structured Cabling System for the new extension areas.</li></ul>","text_promotion":""},{"id":88,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline-generic_tJ4GHnS.png","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline-generic_tJ4GHnS.png"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/pipeline-generic_tJ4GHnS.png","commence":"15-10-1980","complete":"15-07-1983","title":"Riyadh Water Transmission System, High Point Terminal","slug":"riyadh-water-transmission-system-high-point-terminal","job_no":"107","portion":100.0,"client":"SWCC, Saline Water Conversion Corporation","latitude":24.723683,"longitude":46.674171,"contractor":"Tekfen Construction and Installation Co., Inc. – Ciconest (Saudi Arabia) J.V.","description":"<p>Riyadh High Point Terminal Project scope covered construction works of 6 embedded reinforced concrete water reservoirs each with a capacity of 50.000 m<sup>3</sup>, 95 m dia, changing heights of 9 - 10 m.<br/></p><p>The project was part of the Riyadh Water Transmission System supplying desalinated potable water from Al - Jubail Desalination Plant to Riyadh High Point Terminal Reservoirs with Line - C Pipeline System, which was also undertaken by Tekfen.<br/></p><p>Construction of electrical and mechanical workshops, electrical substation, chlorination and electrical buildings, power plant station, housing compound, roads, sewage system, storm water and drinking water system, main pipe channels, fences, landscaping were also undertaken within the same scope.</p><ul><li>Rock Excavation: 100.000 m<sup>3</sup></li><li>Filling: 170.000 m<sup>3</sup></li><li>Concrete: 70.000 m<sup>3</sup></li><li>Reinforcing Steel: 6.000 t</li><li>Sub-base: 60.000 m<sup>3</sup></li><li>Asphalt: 80.000 m<sup>3</sup></li></ul>","text_promotion":""},{"id":89,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/113-cover.jpg","project_type":{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},"project_status":"Completed","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/113-cover.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/113-cover.jpg","commence":"17-08-1982","complete":"02-07-1988","title":"Assir Water Transmission System","slug":"assir-water-transmission-system","job_no":"113","portion":33.0,"client":"SWCC, Saline Water Conversion Corporation","latitude":17.721335,"longitude":42.029227,"contractor":"Tekfen Construction and Installation Co., Inc., - Saipem (Italy) - CAT (Lebanon) J.V.","description":"<p>The project involves transmission of water supplied from Ash - Shuqaiq Desalination Plant on the Red Sea coast, by three transmission systems to Abha, Ukad, Al Bin Numan and Ahad Rafidah Areas. The scope covers engineering, procurement, construction and one year maintenance of pipelines, pumping stations, reservoirs and housing compounds including HVAC, electrical, tele-control, command and telecommunication systems.<br/></p><p>The project is one of the major accomplishments of Tekfen in Saudi Arabia.</p><p></p><p><b>Shuqaiq - Abha (SA)</b><br/>Pumped system consisting of 42” x 102 km cement mortar lined steel pipeline with cathodic protection, 4 pumping stations (2,7 MW, 6,9 MW, 2 x 6 MW) and 2 x 50.000 m<sup>3</sup> capacity terminal reservoirs at 2.297 m altitude located at Abha. The maximum flow capacity of this section is 7.700 m<sup>3</sup> / hr.</p><p></p><p><b>Abha Metropolitan Area (AM)</b><br/> Gravity system consisting of 42” x 49 km main cement mortar lined steel pipeline, 20” x 29 km concrete pipeline and two reservoirs of 50.000 m<sup>3</sup> and 8.000 m<sup>3</sup> capacities located at Al Bin Numan and Ahad Rafidah.</p><p></p><p><b>Shuqaiq - Ukad (SG1)</b><br/>Pumped system consisting of 36” x 35 km cement mortar lined steel pipeline with cathodic protection, booster section of PS1 pumping station and a reservoir with 20.000 m<sup>3</sup> capacity at Ukad.</p><p></p><p>The project consists of 8 tunnels passing Al-Sarwat Mountains, 10 km in length and 2,8 m in width. There are 3 bridges with a total length of 187 m.<br/></p><p>The project also includes the HVAC, electrical, tele-control, command and telecommunication systems.<br/></p><p>A housing compound consisting of two villas, two apartment blocks with eight flats, a guesthouse and a mosque are also included within the work scope.<br/></p><p>Also in the project were 2 railway crossings (each 30 m) and 1 road crossing (25 m).</p><p></p><p><b>QUANTITIES OF MAIN CIVIL WORKS</b></p><ul><li>Excavation: 720.000 m<sup>3</sup></li><li>Fill: 467.000 m<sup>3</sup></li><li>Reinforced Concrete: 60.050 m<sup>3</sup></li><li>Reinforcing Steel: 5.585 t</li><li>Steel Construction: 8.280 t</li><li>Pile: 1.350 m<br/></li></ul><p><b>ROAD WORKS</b></p><ul><li>Access Roads: 15,5 km</li><li>Internal Roads: 4 km</li></ul>","text_promotion":""},{"id":90,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/178-kapak.jpg","project_type":{"title":"Metro & Railway","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-metro.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/178-kapak.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/metro-gece.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/civil_0005_178.jpg","commence":"21-08-1992","complete":"31-01-2000","title":"Istanbul Metro, Phase I","slug":"istanbul-metro-phase-i","job_no":"178","portion":100.0,"client":"Istanbul Greater Metropolitan Municipality","latitude":41.048341,"longitude":29.019187,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>The project comprises of the construction of 2 x 3,5 km long metro tunnels parallel to each other and 3 station buildings on route between Şişli and 4. Levent regions of İstanbul. The tunnels, built 30 m below ground level, are 6,3 m high and 6,2 m wide.<br/></p><p>3.200 m section of the metro tunnels are constructed using New Austrian Method while Cut and Cover Method with reinforced concrete box cross-section is applied for the remaining 200 m section.<br/></p><p>Two of the constructed stations are 235 m long, 24 m wide and 28 m deep; each station comprises of 3 levels whereas 4. Levent is constructed as a tunnel type station.</p><p></p><p><b>FACTS</b></p><ul><li>Anchor: 230.000 m (60 t pull)</li><li>Tunnel Excavation: 356.372 m<sup>3</sup></li><li>Station Excavation: 523.645 m<sup>3</sup></li><li>Reinforced Concrete: 228.767 m<sup>3</sup></li><li>Shotcrete: 202.000 m<sup>2</sup></li><li>Reinforcing Steel: 15.000 t</li><li>Steel Mesh: 1.829 t</li><li>Steel Rip: 1.781 t</li><li>Tunnel Concrete Mould: 8.054 m</li><li>Shutter for the Stations (F1 &amp; F2): 89.581 m<sup>2</sup> and 149.679 m<sup>2</sup></li><li>Forepoling: 44.680 m</li><li>Rock Anchor Bolt: 50.615 m</li><li>Self Drilling Injection Bolt: 1.236 m</li><li>Swelex: 3.353 m</li></ul>","text_promotion":""},{"id":91,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/216-kapak.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/216.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/Olimpiyat1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/Olimpiyat2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/Olimpiyat5.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/Olimpiyat6.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/Olimpiyat7.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/Olimpiyat8.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/Olimpiyat10.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/216.jpg","commence":"28-11-1997","complete":"15-01-2002","title":"Istanbul Atatürk Olympic Stadium","slug":"istanbul-ataturk-olympic-stadium","job_no":"216","portion":37.5,"client":"Olympic Committee of Turkey","latitude":41.074571,"longitude":28.765839,"contractor":"Tekfen Construction and Installation Co., Inc., - Compenon Bernard SGE - SAE International (France) J.V.","description":"<p>İstanbul Atatürk Olympic Stadium, another state of the art project successfully accomplished by Tekfen, is designed for 80.000 spectators.<br/></p><p>The turnkey project’s scope also covers maintenance and management services undertaken by the contractors for a period of one year.<br/></p><p>The architects of the complex are Michel Macari and Aymeric Zublena, who had previously designed Stade de France / Paris to host 1998 World Football Championship.<br/></p><p>İstanbul Atatürk Olympic Stadium, an assertive project to support the City’s Olympic goal, has been built with the highest international safety and construction standards.<br/></p><p>The Stadium’s two State of the Art Steel Roofs (2.800 t and 1.300 t) were produced by Tekfen’s Steel Structure Fabrication Plant at Ceyhan, Adana. The west roof, designed in the form of a crescent and principally composed of a 1.000 t main beam called mega-truss, is supported by two reinforced concrete shafts with 196 m span.<br/></p><p>With its 134 entrances and 148 exit gates, the Olympic Stadium allows 80.000 to evacuate within 7,5 minutes, in case of any emergency. Two annex (warm up / training) fields are connected directly to the Olympic Stadium with an underground tunnel.<br/></p><p>The Olympic Stadium’s superior technical infrastructure and design ensure perfect visibility from all stands; a homogeneous sound level (102 decibels) with the most modern speaker systems and 1.400 lux illumination at every single point.<br/></p><p>42.200 m<sup>2</sup> commercial and service / facility center is situated under the west roof with a frontage of 450 m and 6 floors (3 below ground).<br/></p><p><b>MAIN QUANTITIES</b></p><ul><li>Excavation &amp; Backfilling: 3.700.000 m<sup>3</sup></li><li>Micropiles: 2.240 units</li><li>Concrete (cast in-situ): 60.000 m<sup>3</sup></li><li>Concrete (precast): 11.000 m<sup>3</sup></li><li>Reinforcement: 7.400 t</li><li>Prestressing &amp; Cable Stays: 40 t</li><li>Steel Structures: 5.400 t</li><li>Roofing &amp; Cladding: 52.000 m<sup>2</sup></li><li>Pavement: 90.000 m<sup>2</sup><br/></li></ul><p><b>FACTS</b></p><ul><li>80.000 seat capacity (48.500 covered) with permanent athletism tracks,</li><li>42.200 m<sup>2</sup> commercial / facility building,</li><li>Amphi-theatre with 300 seats capacity,</li><li>Two elevated car parks with total capacity of 400 vehicles,</li><li>36 private-view lodges each fully equipped with a TV set, meeting table, comfortable arm chair(s) and a (drink / snack) bar with high bar stools,</li><li>Each zone has its own access points, refreshment, first-aid and toilet facilities,</li><li>All zone separators comply with the latest international safety standards.</li></ul>","text_promotion":""},{"id":92,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/231-kapak.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/231-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/231-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/231-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/231-3.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/231.jpg","commence":"28-10-1999","complete":"31-08-2003","title":"Tekfen Tower Project","slug":"tekfen-tower-project","job_no":"231","portion":100.0,"client":"Tekfen Holding Co., Inc.","latitude":41.081838,"longitude":29.0096,"contractor":"Tekfen Construction and Installation Co., Inc. (Project Management)","description":"<p>Tekfen Tower, a 26 storey, 117.5 m reinforced concrete building consisting of 82.000 m<sup>2</sup> GFA, of which 33.000 m2 high-tech, A-Class office area and related facilities such as 550 seat cafeteria, conference and fitness centers, is an investment project of Tekfen Holding Co., Inc., Real Estate Development Group. Suitably located at an area with easy access to both Bosphorus - Crossing Bridges of İstanbul, urban motorway, metropol center and airport, the prestigious high-rise of Tekfen challenges its competetitors with its architectural efficiency and technically smart infrastructure. Tower’s rear block, podium, extends towards north-west on 5 floors.<br/></p><p>Tekfen Construction and Installation Co., Inc. overtook the project on EPC basis and the works were started by the end of 1999, completing the challenging task within a period of 40 months.<br/></p><p>The building comprises of 17 elevators and 2 escalators while parking floors can serve up to 800 cars at a time. The Tower provides heating and cooling through the high-tech Variable Air Volume / VAV System (Fan Powered Reheat) offering better air quality while allowing zoning. Tower’s Granite* and Aluminium Cladding were tested for earthquake resistance and infiltration.<br/></p><p><i>* Granite Blocks are imported from sources in Africa, India, Finland and Italy.</i></p><p></p><p><b>HIGHLIGHTS</b></p><ul><li>Fire Fighting and Smoke Detection System according to NFPA (National Fire Protection Association, USA) standards,</li><li>50 m<sup>3</sup> / hr / per HVAC capacity,</li><li>Vertical Transportation System Design by JB &amp; B Consulting Engineers, USA,</li><li>Central Clock System,</li><li>Two 1.600 kVA and one 1.000 kVA Standby D/G generators; two 330 kVA UPS System,</li><li>Fiber-optic telecommunication infrastructure,</li><li>Satellite Master Antenna TV / SMATV compatible Cable TV distribution system.</li></ul>","text_promotion":""},{"id":93,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/civil-generic_0uKAf6v.png","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/civil-generic_0uKAf6v.png"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/civil-generic_0uKAf6v.png","commence":"01-10-1998","complete":"30-05-2002","title":"Bursa Industrial Zone & Free Zone Infrastructure Works","slug":"bursa-industrial-zone-free-zone-infrastructure-works","job_no":"228, 249","portion":100.0,"client":"Bursa Chamber of Commerce and Industry; Organized Industrial Zone Management (228), Bursa Free Trade Zone Founder and Operator (249)","latitude":40.244934,"longitude":28.96419,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Bursa, a leading industrial city of Turkey, is a major area of focus for Tekfen Construction and Installation Co., Inc. which has successfully completed a number of infrastructure projects in the region. Two major projects; Infrastructure Works for Bursa Organized Industrial Zone and Bursa Free Zone, both include challenging Natural Gas Distribution and SCADA* works, besides civil construction, electrical and telecommunication schemes.<br/></p><p>Tekfen’s ISO 9001:2000 certified Concrete Pipe Manufacturing Plant, also established in the same region, serves the infrastructure projects of Bursa with its uncompromising dedication to international quality standards.<br/></p><p><i>* Supervisory Control and Data Acquisition System.</i><br/></p><p><b>1- Infrastructure Works of the 4th Expansion Area of Bursa Organized Industrial Zone (Job No: 228, US$ 31.000.000)</b><br/></p><p>Bursa Organized Industrial Zone is a major investment scheme and a pioneer in its field on many aspects. Tekfen overtook infrastructure works and construction of a number of plant buildings within the Industrial Zone Project scope.</p><p></p><p><b>PROJECT HIGHLIGHTS</b></p><ul><li>Sewerage<br/> - Concrete Piping (dia 200 - 600 mm): 21.597 m<br/> - Reinforced Concrete Piping (dia 800 - 1.200 mm): 5.073 m<br/></li><li>Rainwater System<br/> - Concrete &amp; Reinforced Concrete Piping (dia 200 - 1.800 mm): 22.000 m<br/> - Reinforced Concrete Ducts: 4.040 m<br/></li><li>Drinking &amp; Potable Water System<br/> - Pipe Procurement &amp; Installation (dia 100 - 600 mm): 82.000 m<br/></li><li>Natural Gas System<br/> - PE Pipe Procurement &amp; Installation (dia 63 - 250 mm): 17.000 m<br/> - Steel Pipe Procurement &amp; Installation (dia 50 - 300 mm): 5.500 m<br/> - Pressure Reducing &amp; Measuring Stations (9 x 16 / 4 bar, 116 x 4 / 2 bar; ranging from 75 m<sup>3</sup> / hr to 7.500 m<sup>3</sup> / hr): 125 units<br/></li><li>Roads<br/> - Total Length of Roads: 22.200 m<br/> - Granite Cobblestone Pavement: 287.000 m<sup>2</sup><br/> - Curbs: 69.700 m<br/></li><li>Telecommunication Works<br/> - Triple Cable Duct System: 39.000 m<br/> - Cable Pull Box: 198 units<br/> - Cable Manholes: 259<br/></li><li>Electrical Works<br/> - MV Distribuition Network: (for) 130 Plants<br/> - MV Substations: 5<br/> - MV / LV Electricity Distribution and Natural Gas SCADA Systems: 2<br/> - 34,5 kV Mono-Block Reinforced Concrete Kiosk: 80<br/> - Power Cables (36 kV, XLPE): 110.000 m<br/> - MV Cable Terminations: 690<br/> - 34,5 kV, 630 - 1.250 A Vacuum Type Switchgear Units: 55<br/> - 34,5 kV, 400 V, 100 kVA Transformers: 5<br/> - Road Lighting System: 22.000 m<br/> - ADT 90 / 20 Lighting Poles and Fixtures: 678<br/> - 18 m Floodlight Projectors and Fixtures: 27<br/> - LV Power Cables: 51.500 m<br/></li><li>SCADA (Supervisory Control and Data Acquisition) System<br/> - Electricity Distribution System SCADA Central Hardware: 1<br/> - Electricity Distribution System SCADA Central Software,10.000 PV (I / O): 1<br/> - Natural Gas Network SCADA Central Hardware: 1<br/> - Natural Gas Network SCADA Central Software, 20.000 PV (I / O): 1<br/> - Natural Gas Pressure Reducing Stations RTU’s: 19<br/> - Electricity and Natural Gas Client RTU’s: 130<br/> - Fiber Optic Cables: 11.750 m<br/> - Communication Cables: 23.000 m<br/> - Power Supply Cables: 23.000 m<br/> - UPS System (20 kVA): 2 set<br/></li></ul><p><b>2- Infrastructure Works Of Bursa Free Zone (Job No. 249, US$ 26.000.000)</b><br/></p><p>Bursa Free Zone situated at the port town of Gemlik, is the first of its kind in Turkey offering the clients a fully pre-completed infrastructure (electricity, natural gas, automotion, SCADA, telecommunication, transport, sewage and water systems).</p><ul><li>Sewerage, Rain &amp; Potable Water<br/> - Concrete &amp; Reinforced Concrete Piping (dia 200 - 1.600 mm): 22.000 m<br/> - PE Piping (dia 32 - 355 mm): 19.500 m<br/></li><li>Roads<br/> - Asphalt Road Construction on Concrete: 9.145 m<br/> - Excavation and Filling: 13.000.000 m<sup>3</sup><br/></li><li>Natural Gas Distribution System<br/> - Procurement and Installation of PE Pipes (dia 20 - 250 mm): 9.500 m<br/> - Procurement and Installation of Steel Pipes (dia 50 - 250 mm): 2.200 m<br/> - Pressure Reducing and Measuring Stations (2 x 19 / 4 bar, 78 x 4 bar / 2 mbar, 97 x 4 / 2 bar; ranging from 75 m<sup>3</sup> / hr to 1.200 m<sup>3</sup> / hr): 177 units<br/> - 6’’ - 16’’ bar Pipeline: 2.200 m<br/> - Hot-Tap Works: 1 Unit<br/></li><li>Telecommunication Works<br/> - Procurement and Installation of (dia 110 mm) PE Pipeline: 36.000 m<br/> - Telecom Cables Ducts: 146 units<br/></li><li>Superstructure Works<br/> - Construction of Geotextile Reinforced Earth Wall: 23.750 m<sup>2</sup><br/> - Various Facility Buildings: 34.000 m<sup>2</sup><br/> - Shotcrete: 3.750 m<sup>2</sup><br/> - Epoxy Paint: 10.000 m<sup>2</sup><br/></li><li>Electrical Works<br/> - MV Distribution Network: (for) 105 Plants<br/> - MV Electricity Distribution Substations: 4<br/> - MV Electricity Distribution and Natural Gas SCADA System: 2<br/> - 34,5 kV Mono-Block Reinforced Concrete Kiosk: 54<br/> - 34,5 kV XLPE Type Power Cables: 56.000 m<br/> - 34,5 kV XLPE Type MV Cable Terminations: 480<br/> - 34,5 kV SFG - Gas Insulated Circuit Breakers: 5<br/> - 34,5 kV Vacuum Switchgears: 17<br/> - 34,5 kV Measurement and Protection Cubicles: 4<br/> - 34,5 kV 400 V 100 kVA Transformer: 3<br/> - Grounding Works of Substations: 4<br/> - Lighting Cables: 9.000 m<br/> - 22 m Floodlight Projectors: 2<br/> - 90 / 20 Lighting Poles and Fixtures: 290<br/></li><li>Electrical and Natural Gas SCADA System<br/> - Electricity Distribution and SCADA Central System 8.00 PV: 1<br/> - Electricity Distribution and SCADA Central System Software: 1<br/> - Natural Gas Network SCADACentral System Hardware 12.00 PV: 1<br/> - Natural Gas Network SCADA Central System Software: 1<br/> - Natural Gas Pressure Stations RTU’s: 2<br/> - Electricity and Natural Gas Client RTU’s: 105<br/> - Fiber-Optic Cables: 3.500 m<br/> - Communication Cables: 15.000 m<br/> - Telecommunication Cables: 3.500 m<br/> - Power Cables: 10.300 m<br/> - UPS System (6 kVA): 2 sets</li></ul>","text_promotion":""},{"id":94,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/civil-generic_0uKAf6v.png","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/civil-generic_0uKAf6v.png"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/civil-generic_0uKAf6v.png","commence":"01-01-1986","complete":"01-01-2003","title":"Infrastructure Projects, Bursa","slug":"infrastructure-projects-bursa","job_no":"137, 165-3, 208, 227, 251, 253, 254","portion":100.0,"client":"Various Administrations","latitude":40.188332,"longitude":29.061255,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Bursa, a leading industrial city of Turkey, is an area of major focus for Tekfen Construction and Installation Co., Inc., which has successfully completed a number of infrastructure projects in the region.Tekfen&#x27;s ISO 9001: 2000 certified Concrete Pipe Manufacturing Plant, established in the same region, serves the infrastructure projects of the city with an uncompromising dedication to high quality standards while providing Tekfen an edge for local competition.<br/></p><p>Over the years, Tekfen&#x27;s clients at the region ranged from State Bank for Municipal Development of Turkey and The Metropolitan Municipality of Bursa to Turkish Telecom Co., Inc.</p><p></p><p><b>1 - Construction and Rehabilitation of Central Sewage System<br/> (Job No: 137, US$ 15.276.300, Period: 1986 - 1997)</b><br/></p><p>Engineering, construction and rehabilitation works of 282.000 m Central Sewage Collector Network (dia 400 - 2.000 mm) including 7.489 manholes for Bursa. The project scope also covers installation of two pumping stations for the sewage network.<br/></p><p>The investment scheme and tendering process belongs to and runs under the control and supervision of State Bank for Municipal Development of Turkey (İller Bankası).</p><p></p><p><b>2 - Natural Gas Pipeline (8&#x27;&#x27; - 70 Bar) Project<br/> (Job No: 254, US$ 1.175.100, Period: 2000 - 2001)</b><br/></p><p>Construction of 7,3 km (8&#x27;&#x27; &amp; 6&#x27;&#x27; - 70 bar) natural gas pipeline connecting BOTAŞ Main Pipeline to Bis Energy Co., Inc. Power Plants situated at Bursa Organized Industrial Zone. The hot-tap scheme also covers the installation of a RMS-A Station, 6 line valves with by-pass and a switch-gear building.</p><p>*BOTAŞ: Petroleum Pipeline Co., Inc.<br/></p><p><b>3 - Cable TV Project<br/> (Job No: 165-3, US$ 4.265.000, Period: 1992 - 1997)</b><br/></p><p>The project was within the Cable TV investment schemes of Turkish Telecom Co., Inc. run at various (pilot) locations of Turkey to cover 630.000 subscribers. Tekfen was awarded US$ 38 million worth of Cable TV Projects for Bursa, Izmir and Istanbul in Turkey in partnership with NETAŞ (a Northern Telecom / Canada investment in Turkey) and Scientific Atlanta (USA) groups.</p><p></p><p><b>HIGHLIGHTS</b></p><ul><li>Main Line Cable: 74.530 m.</li><li>Distribution Cable: 277.025 m.</li><li>Subscription Cable (RG-6, RG-11): 185.909 m.</li><li>Subscription Facility: 16.000</li><li>Main Line and Line Amplifier: 280<br/></li></ul><p><b>4 - Main Pipeline Construction; Bursa Environmental Health Project<br/> (Job No: 251, US$ 1.948.000, Period: 2000 - 2003)</b><br/></p><p>The project covers 11.000 m concrete (dia 150 - 1.200 mm) and 18.650 m (dia 100 - 700 mm) steel piping for sewage and rainwater system of Bursa covered under The Environmental Health Scheme. The quantity of related excavation and filling works covered were 220.000 m<sup>3</sup>.<br/></p><p><b>5 - Demirtaş Organized Industrial Zone, Rain Water and Sewage Collectors Project<br/> (Job No: 227, US$ 1.341.000, Period: 1998 - 1999)</b><br/></p><p><b>HIGHLIGHTS</b></p><ul><li>Open V Channels: 380 m.</li><li>Reinforced Concrete Sewage Duct: 773 m.</li><li>Concrete Piping (dia 200 - 600 mm): 1.803 m.</li><li>Reinforced Concrete Piping (dia 800 - 1.600 mm): 4.246 m.<br/></li></ul><p><b>6 - Production and Erection of Pre-Cast Beams for the City Belt Line (Motorway)<br/> (Job No: 253, US$ 6.237.000, Period: 2000 - 2003)</b><br/></p><p>The project involves production, transfer and erection of pre-cast beams for bridges and viaducts at Turanköy interchange of Bursa City Belt Line / Motorway (km 2+000-27+148).</p><p></p><p><b>7 - City Sewage and Water Network Rehabilitation and Construction Works<br/>(Job No: 208, US$ 14.607.600, Period: 1996 - 2001)</b><br/></p><p>The project involves Sewage and Drinking Water Network Rehabilitation and New Construction Works under Bursa City Water &amp; Environmental Health Program run by Metropolitan Municipality of the City.<br/></p><p>The project also covered 4.000 m of ductile and 1.600 m of PE piping (subscriber connection) for drinking water network, 1.200.000 m3 of excavation and filling, 90.000 m of concrete piping works (dia 200 - 1.600 mm).</p><p></p><p><b>8 - BURKAN 2, Rain Water Collectors<br/>(Job No: 256, US$ 8.302.000, Period: 2001 - 2003)</b><br/></p><p>The Project is the second portion of a scheme covering 7 different packages undertaken within the scope of Bursa Environment and Water Health Program.</p><p></p><p><b>HIGHLIGHTS</b></p><ul><li>3Excavation / Fill: 960.000 m<sup>3</sup></li><li>Concrete: 41.000 m<sup>3</sup></li><li>Concrete Pipe (dia 150 - 1.200 mm): 65.000 m.</li></ul>","text_promotion":""},{"id":95,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/283-kapak.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/283-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/283-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/283-1.jpg"],"photo_promotion":"None","commence":"01-01-1986","complete":"01-01-2005","title":"Bursa City, Civil Works","slug":"bursa-city-civil-works","job_no":"283, 282, 279, 270","portion":100.0,"client":"Various Administrations","latitude":40.188332,"longitude":29.061255,"contractor":"Tekfen Construction and Installation Co., Inc.,","description":"<p>Tekfen has undertaken major infrastructure projects in the City of Bursa, a leading industrial region of Turkey.<br/></p><p>Sewage and Rain Water Collectors, Natural Gas Distribution Network and various plant erection schemes at Bursa Free Zone can also be counted as major recent contributions of Tekfen to the city.<br/></p><p>ISO 9001:2000, OHSAS 18001:1999 and ISO 14001:1996 Certified** Concrete Pipe Production Yard of Tekfen is also located in Bursa.<br/></p><p><i>(**) Quality Management, Occupational Health and Safety Assessment, Environmental Management System(s).</i></p><p></p><p><b>1- BUSKİ Sewage and Rain Water Collectors; BURKAN - 7<br/>(Job No: 283, US$ 10.842.000)</b><br/></p><p>The project’s scope covers erection of the Sewage System and Rain Water Collectors within the borders of Bursa Greater Metropolitan Municipality under BURKAN - 7 scheme.<br/></p><p><b>PROJECT HIGHLIGHTS</b></p><ul><li>Excavation: 674.000 m<sup>3</sup></li><li>Fill: 491.500 m<sup>3</sup></li><li>Concrete Works: 40.250 t</li><li>Steel Works: 3.350 t</li><li>Piping: 92.150 m</li><li>Form works: 119.500 m2</li><li>Reinforced Earth Wall: 46.000 m<sup>2</sup></li><li>Transport of Material: 655.000 m<sup>3</sup></li><li>Potable Water Works: 3.400 m</li><li>Housing Connections: 3.800 m<br/></li></ul><p><b>2- Bursa 3. Phase Natural Gas Network<br/>(Job No. 282, US$ 2.456.100)</b><br/></p><p>The Natural Gas Network project covers installation of 38 km of (steel and PE) pipes, erection of gate-valve rooms, procurement / erection of pressure reducing and measuring stations. The client is Bursa Intercity Natural Gas Distribution Trade and Contracting Co., Inc.<br/></p><p><b>PROJECT HIGHLIGHTS</b></p><ul><li>Steel and PE Pipes: 38.000 m</li><li>Steel Fittings: 600 Units</li><li>Gate-Valve Erection: 155 Units</li><li>Pressure Reducing and Measuring Stations: 20 Units</li><li>Metal Plastic Fittings: 50 Units<br/></li></ul><p><b>3- Gemlik ve Bursa Free Zones ‘’Erol Türkün’’ Textile ve ‘’Marmara Metal’’ Plant Buildings<br/>(Job No’s: 270 &amp; 279, Total Value: US$ 420 .000)</b><br/></p><p>Two Production Plants with total area of 2400 m<sup>2</sup> at Bursa and Gemlik Free Zones are built in accordance with the highest infrastructure standards and distinction of Tekfen quality. Excavation and Fill Works of the Marmara Metal Plant located at the Bursa Free Zone are also undertaken and successfully delivered by Tekfen.</p>","text_promotion":""},{"id":96,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/288-kapak.jpg","project_type":{"title":"Metro & Railway","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-metro.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/bursa-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/bursa-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/bursa-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/bursa-5.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/288-kapak.jpg","commence":"24-10-2004","complete":"15-06-2008","title":"Bursaray Light Rail System, Line B East, Bursa","slug":"bursaray-light-rail-system-line-b-east-bursa","job_no":"288","portion":61.0,"client":"Metropolitan Municipality of Bursa","latitude":40.188332,"longitude":29.061255,"contractor":"Tekfen Construction and Installation Co., Inc. - Siemens Consortium","description":"<p>Bursa, an industrial city located at a distance of 250 km from Istanbul, has been one of the main regions of focus for Tekfen. The project, covering construction works of the Bursaray Light Rail System Line B, East, was awarded to Tekfen - Siemens Consortium by the Metropolitan Municipality of Bursa.<br/></p><p>The Project, under Bursaray scheme, comprises the construction of a two-track railway of 4.857 m long, called Line-B between Demirtaflpafla - Arabayata¤› districts of the city. An underground station at Demirtaflpafla, 1 elevated station at Gökdere, partly below grade and consecutively 4 at-grade (street level) stations at Davutdede, Duaç›nar›, Hastane and Arabayata¤› districts. 1.033 m long cut &amp; cover tunnel was built at the west of Gökdere Station, that contains two emergency exits.<br/></p><p>The scope also covers the construction of a viaduct of 12 piers and 2 abutments of 460 m long over Gökdere.</p><p></p><p><b>HIGHLIGHTS</b></p><ul><li>Earthworks: 239.285 m<sup>3</sup></li><li>Reinforced Concrete: 77.525 m<sup>3</sup></li><li>Fill: 112.441 m<sup>3</sup></li><li>Painting: 17.829 m<sup>2</sup></li><li>Brick Wall: 366 m<sup>3</sup></li><li>Track Laying: 9.714 m</li></ul>","text_promotion":""},{"id":97,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/348.jpg","project_type":{"title":"Metro & Railway","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-metro.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/348.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/348.jpg","commence":"27-05-2016","complete":"27-05-2019","title":"Ankara – Izmir High Speed Railway Project, Construction Of Afyon – Uşak (Banaz) Section (Km 194+325 – Km 268+000) And Afyonkarahisar Direct Crossing Infrastructure Works","slug":"ankara-izmir-high-speed-railway-project-construction-of-afyon-usak-banaz-section","job_no":"348","portion":50.0,"client":"General Directorate ofTurkish Railways (TCDD)","latitude":38.756871,"longitude":30.537977,"contractor":"Doğuş-Tekfen Ordinary Partnership","description":"<p>Doğuş-Tekfen Ordinary Partnership is undertaking Ankara-İzmir Rapid Train Infrastructure Construction Project Afyonkarahisar - Uşak (Banaz) Section (Revised between Km: 151+500 - 231+214,56) where Doğuş Construction is selected as the pilot Partner.<br/></p><p>Project’s duration is 36 months and is expected employ 2,500 direct workforce at the peak.<br/></p><p><b>FACTS AND FIGURES</b><br/></p><p><b>Scope:</b><br/></p><ul><li>Rapid Railway Length<br/> 82.805 m (79.715 m main route, 3.090 m existing conventional connection)<br/></li><li>Tunnel<br/> 8 Tunnels: 5056 m (between 279-1.260m); 957.490 m<sup>3</sup> excavation; 254.400 m<sup>3</sup> reinforced or unreinforced concrete<br/></li><li>Viaduct<br/>10 Viaducts: 7.268 m (varies between 90-1250 m)<br/></li><li>Bridge<br/>7 Bridges<br/></li><li>Overpass<br/>15 Overpasses<br/></li><li>Underpass<br/>46 Underpasses (varies between 21-76 m)<br/></li><li>Reinforced Unreinforced Concrete<br/>585.450 m<sup>3</sup> (excluding tunnel) 480.790 m<sup>3</sup> reinforced / 104.660 m<sup>3</sup> unreinforced<br/></li><li>Earth Works<br/>Main Earthworks : 25.480.810 m<sup>3</sup>, Main Backfilling : 13.024.860 m<sup>3</sup>, Excavation and Backfilling for Bridges, Viaducts, Passes, etc : 914.150 m<sup>3</sup><br/></li><li>Bored Piling<br/> 265.760 m (100-165 cm diameter)<br/> (120 cm dia. 60.720 m, 100 cm dia. 174.680 m, 165 cm dia 30.360 m)<br/></li><li>Reinforced Earthwall<br/>(5.280 m2)<br/></li><li>Ground And Slope Stability Enhancements<br/>Misc.<br/></li><li>Prestressed Beam Fabrication And Installation<br/>Misc.</li></ul>","text_promotion":""},{"id":98,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/civil_0000_360.jpg","project_type":{"title":"Terminal","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-terminal.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/18-GS8_9942.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/27-GS8_0343.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/28-TurkAkim-16.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/25-TurkAkim-12.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/23-GS8_0328.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/22-TurkAkim-13.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/14-GS8_0186.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/02-GS8_9651.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/07-GS8_9691.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/360-turkakim.jpg","commence":"31-10-2017","complete":"31-03-2020","title":"Turkstream Receiving Terminal Project","slug":"turkstream-receiving-terminal-project","job_no":"360","portion":100.0,"client":"Petrofac International","latitude":41.638371,"longitude":28.090351,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<h3><a href=\"https://youtu.be/UK4sYXbDW3A\">Project Movie »</a></h3><p></p><hr/><p><br/></p><p>Turkstream Receiving Terminal Project is the Turkish part of the pipeline facility system which will transport the natural gas from ANAPA, RUSSIA tothe terminal that is 100 kilometers west of Istanbul, near the village of Kiyikoy.The natural gas will be transported by 32” pipelines from Black Sea to TURKEY with this project.<br/></p><p>The construction of external Road Works, Receiving Terminal (Civil, Mechanical, E&amp;I and pre-commissioning works) and Pipeline (2X1,5 Km) Works between landfall and Receiving Terminal have beenawarded to TEKFEN.</p>","text_promotion":"Turkstream Receiving Terminal Project is the Turkish part of the pipeline facility system which will transport the natural gas from ANAPA, RUSSIA tothe terminal that is 100 kilometers west of Istanbul, near the village of Kiyikoy.The natural gas will be transported by 32” pipelines from Black Sea to TURKEY with this project ."},{"id":99,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/motorway_0011_80_98cu6CF.jpg","project_type":{"title":"Motorway","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-highway.png"},"project_status":"Completed","project_location":"Kuwait","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/motorway_0011_80_3aKZjAJ.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/motorway_0011_80.jpg","commence":"17-01-1978","complete":"12-06-1981","title":"Fahaheel Motorway","slug":"fahaheel-motorway","job_no":"80","portion":50.0,"client":"Ministry of Public Works, Kuwait","latitude":29.083723,"longitude":48.133191,"contractor":"Tekfen Construction and Installation Co., Inc. - Sangamo Group (USA) J.V.","description":"<p>The project, being the first international experience of Tekfen, was accomplished successfully according to the given schedule while complying with the highest quality standards.</p><p></p><p>The scope of the Kuwait Fahaheel Motorway Project covered the following:</p><ul><li>12,3 km of detours,</li><li>10,2 km 6 - 8 lanes motorway,</li><li>21 km of spur roads (C - D roads, frontage roads, ramps, loops, etc.),</li><li>Approximately 2.150.000 m<sup>3</sup> of earth movement, 400.000 t of asphalt,</li><li>2,8 km reinforced concrete twin storm water box culvert (7,3 m x 3,65 m),</li><li>20 km of concrete storm-water drainage pipes (different sizes 0,4 - 2,0 m dia, 700 drainage pits and manholes),</li><li>3 interchanges with 9 post-tensioned concrete box bridges, spans 80 - 100 m,</li><li>1 pedestrian over crossing and 1 pedestrian under crossing,</li><li>4 different size retaining walls, heights 2,6 - 8,0 m (total concrete was approximately 70.000 m<sup>3</sup>, total steel used 6.750 t),</li><li>All related motorway lighting (10 m, 16 m, 30,5 m masts), all electrical works, fencing (12 km), automatic irrigation piping network, area landscaping (70.000 m<sup>2</sup>) and traffic signalization at 7 junctions.</li></ul>","text_promotion":""},{"id":100,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/motorway_0010_286_W9t7ADc.jpg","project_type":{"title":"Motorway","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-highway.png"},"project_status":"Completed","project_location":"Morocco","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/DSC_0201.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/DSC_0261.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/DSC_0293.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/DSC_0228.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/DSC_0530.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/286.jpg","commence":"09-08-2004","complete":"09-10-2007","title":"Tangier - Port De Oued Rmel Motorway, Rn2 - Lechbaa Section","slug":"tangier-port-de-oued-rmel-motorway-rn2-lechbaa-section","job_no":"286","portion":100.0,"client":"Société Nationale des Autoroutes du Maroc (ADM)","latitude":35.761582,"longitude":-5.833786,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>The Tangier - Port de Oued Rmel Motorway, RN2 - Lechbaa Section is situated at about 15 km south of Tangier at the northwest of Morocco, in a region where the Mediterranean meets the Atlantic Ocean. The project consists of the construction of a double way motorway of 13,16 km with 2x2 lanes.<br/></p><p>The project, being Tekfen’s first in North Africa, is also the first motorway scheme in Morocco introducing lime treatment and stone mastic application.</p><p></p><p>Principle structures and quantities of the Motorway are as follows;</p><ul><li>1 Interchange</li><li>2 Toll areas</li><li>4 Bridges</li><li>3 Vehicle Underpasses</li><li>6 Pedestrian Underpasses</li><li>1 Parking &amp; Restaurant Area</li><li>17 Culvert Structures</li><li>Connection Roads (7 km)<br/></li></ul><p><b>HIGHLIGHTS</b></p><ul><li>Earthworks: 10.660.000 m<sup>3</sup></li><li>Concrete: 60.300 m<sup>3</sup></li><li>Lime Treatment: 124.000 m<sup>3</sup></li><li>Lime: 7.400 t</li><li>Subgrade: 340.000 m<sup>3</sup></li><li>Capping layer: 140.000 m<sup>3</sup></li><li>Superstructure: 142.000 t</li></ul>","text_promotion":""},{"id":101,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/359-cover-viaduct.jpg","project_type":{"title":"Motorway","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-highway.png"},"project_status":"Completed","project_location":"Qatar","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/190116_P017C2_General-View-from-Pier-16-to-13_Northbound-Bridge.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/26-GS9_7232_1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/19-GS8_1900.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/20-GS9_7348.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/190116_P017C2_General-View-from-Pier--19-to-14-and-Diverted-Road.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/190116_P017C2_General-View-of-Northbound-and-Southbound-Bridges-5.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/359-qatarmotorway_g5pa20J.jpg","commence":"17-09-2017","complete":"10-02-2020","title":"East Industrial Road Between Al Muntazah Street And West Corridor Project","slug":"east-industrial-road-between-al-muntazah-street-and-west-corridor-project","job_no":"359","portion":100.0,"client":"Public Works Authority","latitude":25.272305,"longitude":51.517531,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<h3><a href=\"https://youtu.be/BhJXtoEaRYQ\">Project Movie »</a></h3><p></p><hr/><p><br/></p><p></p><p>The Project of East Industrial Road between Al Muntazah Street and West Corridor (P017 C2) is a high quality and high capacity strategic Expressway Link from South of Doha through to Al Furousiya Street to the North Corridors. It provides vehicle access to adjacent Industrial Area and recreational facilities. It also facilitates part of the Surface Water Drainage System for the local area.<br/></p><p>The Project involves the construction of approximately 2.5 km of new expressway.Construction of East Industrial Road between Al Muntazah and West Corridor, consists of a dual three (3) lane mainline on viaduct structure with three (3) signalized at-grade junctions and a three (3) lane collector road system on each side of the mainline. The dual four lane carriageway from Project P010 is reduced to a dual three lane carriageway on the approach to the viaduct structure. Two pedestrian underpasses and footways and cycle ways also form part of the Project.<br/></p><p>A storm water drainage system and micro-tunnel (2000 mm diameter and 1855 m length) are to be constructedwithin the scope of the Project. The Project includes utility diversions, protection and installation of new utilities and ITS. A comprehensive landscaping scheme including artscape also forms part of the Project. The Project ties into two (2) Expressways projects: Al Muntazah Street (P012) in the north and East-West Corridor (P010) in the south. Both adjacent Expressways projects are currently under construction. In addition, there are improvement works to the roads and drainage within the adjacent industrial area that will be ongoing during the construction period of the Project.<br/></p><p>Project comprises of the design, construction, erection, completion, testing &amp;commissioning and 400 days maintenance of roads as described here below:</p><ul><li>Traffic diversions, temporary traffic control and management,</li><li>Fencing, walls and other accommodation works,</li><li>Vehicle safety barriers and pedestrian guardrails,</li><li>Surface water drainage,</li><li>Construction of microtunnel for surface water drainage;</li><li>Excavation and processing of rock and suitable material for use as embankment fill,Mechanically Stabilized Earth (MSE) wall frictional fill, structural backfill, backfill to pipetrenches, pavement sub-grade and sub-base layers etc.,</li><li>Construction of embankments, MSE wall embankments, temporary shoring etc.,</li><li>Excavation and recycling or disposal of existing road pavement;</li><li>Construction of curbs, footways, shared use paths and other paved areas;</li><li>Directional, regulatory and other traffic signage and road markings;</li><li>Provision of Intelligent Transportation Systems (ITS) and Automatic Display Signs (ADS);</li><li>Traffic signal works;</li><li>ITS works, including power supplies, communications system, cabinets, poles, gantries, ducts, dynamic message signs, lane control signals, speed control signs, CCTVcameras, license plate readers etc.;</li><li>Extensive high specification hard and soft landscaping, including varied paving, architecturalfeatures, tree planting, irrigation, and streetscape furniture;</li><li>Design and construction of main access road to Al Jaliat Compound,</li><li>Tertiary irrigation system;</li><li>MSE ramps on approaches to viaduct,</li><li>Public and private utility services: provision for future services, diversions and protection ofexisting services for the following:</li><li>Water supply network, including firefighting network for viaduct structure;</li><li>Sewage rising main;</li><li>Treated Sewerage Effluent (TSE) and irrigation network;</li><li>Extensive Extra High Voltage (EHV), High Voltage (HV), Medium Voltage (MV) and Low</li><li>Voltage (L V) electricity networks including new substations;</li><li>Street lighting, underpass and structure lighting;</li><li>Communication lines.</li></ul>","text_promotion":"The Project of East Industrial Road between Al Muntazah Street and West Corridor (P017 C2) is a high quality and high capacity strategic Expressway Link from South of Doha through to Al Furousiya Street to the North Corridors. It provides vehicle access to adjacent Industrial Area and recreational facilities. It also facilitates part of the Surface Water Drainage System for the local area."},{"id":102,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/04-DSC_0423.jpg","project_type":{"title":"Motorway","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-highway.png"},"project_status":"Completed","project_location":"Qatar","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/02-DSC_0448.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/10-DSC_0468.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/12-CS1_2927.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/04-DSC_0423.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/06-CS1_2839.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/15-Q-NR-17-9.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/334.jpg","commence":"06-10-2012","complete":"31-12-2016","title":"Design And Construct Service Road Enhancement To North Road Corridor (P059)","slug":"design-and-construct-service-road-enhancement-north-road-corridor-p059","job_no":"334","portion":100.0,"client":"Ashghal - Public Works Authority","latitude":25.353552,"longitude":51.453729,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Al Shamal Road Service enhancement Works is an important road enhancement project which is the part of the Expressway in Qatar. The Expressway Programme provides vital transportation links across Qatar connecting key cities, towns and villages with high quality national freeways and urban arterial routes. Qatar’s entire network of expressways, highways and local roads has been reviewed as part of this Programme. Fundamental improvements and enhancements at existing projects were planned. The Programme is a nationwide road infrastructure scheme that improved the way people and places have beenconnected across the city of Doha and wider Qatar. It delivers over 900 km of new roads and an array of underpasses and multi-level interchanges to enable free-rowing traffic and improved journey times. Ashghal is responsible for the design, construction, delivery and maintenance of all expressways and major roads that cater to current and future traffic demands in Qatar.<br/></p><p><b>Scope:</b><br/><b><br/>Project comprises the design, construction and 400 days maintenance of roads as described here below:</b><br/></p><ul><li>At North Road between Km 3+000 to Km 98+200 both sides construction service roads, (between km 3-31 dual 2 lanes road, between km 31-98 two-lanes road)</li><li>3,2 km 2 x 2 Road (Umm Birkah Road),</li><li>4,8 km 2 x 2 Main Carriageway and 4,5 km 1 x 1 Service Road (Al Khor Road),</li><li>Construction at N5, N8, N10, N12 and N66 new bridges and fly overs on North Road,</li><li>N8 Existing Bridge Widening, Construction at N8, N20 and N24 RHS 5 ea Braiding Structures,</li><li>Connections with the surrounding Road Network and Services,</li><li>Earthworks (1.058.029 m<sup>3</sup> Excavation, 6.190.966 m<sup>3</sup> fill),</li><li>Aggregate Base Course (3.925.393 m<sup>2</sup>),</li><li>Asphalt Pavement (1.806.139 ton),</li><li>Curbs and footways (327.859 m curbs, 300.725 m<sup>2</sup> paving blocks 60 mm thick),</li><li>Reinforced Soil Wall System (113.551 m<sup>2</sup>)</li><li>Maintenance of traffic and detours, Relocation, Realignment and Diversion of Existing Utilities and Waterlines, Electrical and Telecommunication Works,</li><li>Road Lighting Works including the installation of Street Lighting Columns and High Masts (320 km cables, 6.218 ea high mast columns and street lighting columns)</li><li>Landscaping &amp; Irrigation,</li><li>Approx. 104,8 km Open unlined drainage channel, 19.2 km Pipe Culverts,</li><li>Telecommunication Works (Q-Tel Lines 30 km, Emiri Signal Lines 18 km, Qatar Armed Forces Lines 18 km),</li><li>HV and MV Cables (141,9 km),</li><li>Ducting for Intelligent Transport Systems (42 km),</li><li>Ducting for Doha Street Surveillance Systems (21 km),</li><li>Traffic Signing and Marking,</li><li>Traffic Safety Installations,</li><li>Treated Sewage Effluent Lines (315 mm dia 124 km HDPE lines, 400 mm dia 2.3 km lines, 600 mm dia 122 km lines, 900 mm dia 64 km lines, 7.3 km Horizontal Direction Drilling),</li><li>Potable Waterline (400 dia 5.2 km lines, 600 dia 5.2 km lines),</li><li>Valve Chamber (1.374 ea.)</li><li>Metal Guardrail (443,7 km)</li><li>Traffic Signalization Works.</li></ul>","text_promotion":""},{"id":103,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/motorway_0007_354.jpg","project_type":{"title":"Motorway","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-highway.png"},"project_status":"Completed","project_location":"Qatar","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/68-DJI_0973.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/66-DJI_0964.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/60-DJI_0389.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/24-GS8_1806_1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/57-DJI_0365.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/31-DJI_0145.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/21-GS8_1814.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/24-DJI_0117.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/23-DJI_0113.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/17-GS8_1857.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/22-GS8_1766.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/21-DJI_0102.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/20-GS8_1816.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/19-DJI_0092.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/19-GS8_1852.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/15-DJI_0074.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/12-Al-Khor-10.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/11-Al-Khor-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/16-GS8_1812.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/354-alkhor.jpg","commence":"26-11-2016","complete":"25-03-2020","title":"Design And Build Of Al Khor Expressway","slug":"design-and-build-al-khor-expressway","job_no":"354","portion":100.0,"client":"ASHGHAL","latitude":25.681823,"longitude":51.497511,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<h3><a href=\"https://youtu.be/Z1EUmBogJ40\">Project Movie »</a></h3><p></p><hr/><p><br/></p><p>The Project comprises design and construction of an expressway to the north of Doha with nine grade separated junctions subject to further optimization to replace four level stack interchange by most optimum design.The proposed upgrade generally follows the alignment of the existing Al Khor Coastal Road between Lusail and the proposed Al Khor Bypass. The tie in between the existing roads and the expressway shall be approximately 300m and should be as per ASHGHAL Highway Design and traffic manuals. The approximate southern extent for Phase 1 is the Doha Golf Club and the northern extent is up to the proposed Simaismah Junction. The approximate southern extent for Phase 2 is the Simaismah Junction and the northern extent is the proposed Al Khor Bypass up to and including the Al Khor Stadium signal.<br/></p><p>New expressway shall have five traffic lanes in each direction. The carriageways shall be divided by a central median which includes provision for the future Qatar Rail Metro Red Line. A network of service roads is required adjacent to the main alignment which connects the upgrade to existing and future developments.<br/></p><p>A shared pedestrian/cycle way shall be constructed along the length of one side of the expressway in addition to a separate fast cycle track adjacent to the service roads on the other side of the expressway.<br/></p><p>Road design must comply with and satisfy the requirements of the full traffic model for year 2031.<br/></p><p>The Works include provisional Landscape, Hardscape and Artscaping works.All designs for finishing materials, Landscape, Hardscape and Artscaping, will reflect the importance of the project, which intended to be a landmark in the State of Qatar.</p><p></p><p><b>FACTS AND FIGURES</b><br/></p><p>Bu-Thelah Road is also included in the scope of work and comprise the works related to construction of 2 lanes each direction for Link Road from the Orbital Highway at Rasheeda to Wadi Al Askar.<br/></p><p>Bu-Thelah Road has 8,350 m length and consists of 3 layers asphalt with intermediate street lighting.<br/></p><p>Farm Road has 4,825 m length and consists of 1 layer asphalt with intermediate street lighting.<br/></p><p>Project comprises of the design, construction and 400 days maintenance of roads as described here below:<br/></p><ul><li>Traffic diversions, temporary traffic control and management,</li><li>Site clearance, including demolitions, removal of signs, lighting columns and other street furniture,</li><li>Temporary diversions of the infrastructures which are on the route,</li><li>Multiple layers Interchanges (9 pcs.),</li><li>Storm water tunnel (3 m diameter and 8 km length approximately),</li><li>Fencing works,</li><li>Earthworks, including excavation and recycling/disposal of existing road pavement, temporary shoring etc.,</li><li>Surface water drainage,</li><li>Water Lines,</li><li>Electrical and street lighting lines,</li><li>Communication lines,</li><li>Reinforced structures, subways and drainage ducts,</li><li>Retaining walls,</li><li>Construction of pavement, curbs, footways and paved areas,</li><li>Road marking, traffic signage and signalizations,</li><li>Intelligent Transportation Systems (ITS) (infrastructure only)</li></ul>","text_promotion":"The Project comprises design and construction of an expressway to the north of Doha with nine grade separated junctions subject to further optimization to replace four level stack interchange by most optimum design.The proposed upgrade generally follows the alignment of the existing Al Khor Coastal Road between Lusail and the proposed Al Khor Bypass."},{"id":104,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/motorway_0006_307_n7RQFrR.jpg","project_type":{"title":"Motorway","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-highway.png"},"project_status":"Completed","project_location":"Qatar","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/05GS7_3801.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/43GS7_4081.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/12GS7_4328.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/22GS3_4665.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/307.jpg","commence":"05-07-2007","complete":"30-09-2013","title":"Primary Routes, North Road Project Phase 2 & 3","slug":"primary-routes-north-road-project-phase-2-3","job_no":"307","portion":100.0,"client":"Ashghal - Public Works Authority","latitude":25.432438,"longitude":51.41348,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Project comprises construction and 400 days maintenance of two separate road sections as described here below :<br/></p><p><b>Contract 2 Section (Km : 4 +000 – Km : 37 +000):</b><br/>Contract 2 Section starts at Duhail, passing through sub-urban and rural areas to the North of Doha City, namely Duhail, Kheesa, Khuraitiyat, Umm Salal Ali, Umm Salal Mohammad and Umm Garn. The Contract 2 Section also includes the Simaisma road link.<br/></p><p><b>Contract 3 Section (Km : 37+000 – Km : 98 +200):</b><br/>Contract 3 Section starts near Al Khafaij area, passing through rural areas, namely North Military Camp, Al Khaaban, Al Juthay, Fuwairit, Al Ghariya, Athba Al Shamaliyah and Madinat Al Shamal.<br/></p><p><b>Scope:</b></p><ul><li>94,2 km of 2 x 4 Main Highway (North Road),</li><li>4 km of 2 x 3 Highway (Simaisma Road),</li><li>Approx. 12,1 km of 2 x 2 Road (Crossing Roads),</li><li>Approx. 61,8 km of 2 x 1 Road (single carriageway),</li><li>Connections with the surrounding Road Network and Services,</li><li>9 ea. Dual Carriageway Bridges,</li><li>11 ea. Single Carriageway Bridges,</li><li>3 ea. Underpasses,</li><li>5 ea. Camel Crossing Underpasses,</li><li>Stabilized Earth Retaining Walls,</li><li>Maintenance of traffic and detours, Relocation, Realignment and Diversion of Existing Utilities, Electrical and Telecommunication Works,</li><li>Road Lighting Works including the installation of Street Lighting Columns and High Masts (160 km of roads),</li><li>Landscaping &amp; Irrigation,</li><li>Approx. 13,7 km Drainage Works,</li><li>3 ea. Weigh Stations,</li><li>5 ea. Rest Areas,</li><li>Telecommunication Works; (Q-Tel Lines 109 km, Emiri Signal Lines 160 km),</li><li>Ducting for Intelligent Transport Systems (110 km),</li><li>Ducting for Doha Street Surveillance Systems (110 km),</li><li>Traffic Signing and Marking,</li><li>Traffic Safety Installations</li></ul>","text_promotion":""},{"id":105,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/motorway_0000_326.jpg","project_type":{"title":"Motorway","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-highway.png"},"project_status":"Completed","project_location":"Qatar","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/02Tek.CRRoad-12.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/01GS7_7567.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/21GS7_3863.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/10GS7_3856.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/38-Tek.CRRoad-38.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/326.jpg","commence":"30-01-2011","complete":"09-12-2011","title":"Ceremonial National Day Road","slug":"ceremonial-national-day-road","job_no":"326","portion":100.0,"client":"State of Qatar - Private Engineering Office","latitude":25.367644,"longitude":51.398951,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Project comprises the design, construction and 1 year maintenance of Ceremonial National Day Road (Link Road between Dukhan Road and North Road).<br/></p><p><b>Scope:</b></p><ul><li>Design of 1,6 km Connection Road between Dukhan Road and Ceremonial National Day Road,</li><li>Design, construction and 1 year maintenance of ;</li><li>10,1 km Dual 3 lanes Highway,</li><li>10,5 km two lane Frontage Roads,</li><li>15,5 km two lane Service Roads with 6 ea. Roundabouts,</li><li>2,8 km Dual 2 lanes Underpass Roads</li><li>18 km Camel Road,</li><li>18 km Walkway and Jogging Track,</li><li>21,2 km Bicycle Path,</li><li>2 ea. Vehicle Underpass,</li><li>4 ea. Pedestrian Underpass,</li><li>Road Lighting works,</li><li>Grading of the Ceremony Areas,</li><li>Drainage Works,</li><li>Concrete Barriers and Curbs,</li><li>18 km Potable Water Line,</li><li>21 ea. Tiolet Units each having 6 ea. Toilets and 10 ea. Wash Basin</li></ul>","text_promotion":""},{"id":106,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/motorway_0005_307b.jpg","project_type":{"title":"Motorway","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-highway.png"},"project_status":"Completed","project_location":"Qatar","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/016-GS8_8865.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/017-GS7_5074.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/052-GS8_9957.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/064-GS8_0220.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/072-GS8_0625.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/080-GS8_9502.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/307-2.jpg","commence":"23-05-2011","complete":"30-06-2014","title":"Additional Completion Work For North Road","slug":"additional-completion-work-north-road","job_no":"307","portion":100.0,"client":"State of Qatar - Public Works Authority (ASHGHAL)","latitude":25.430704,"longitude":51.408158,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>The main works comprise construction, rehabilitation and 400 days maintenance of 27 km of roads connected to North Road at Duhail, Kheesa, Khuraitiyat, Umm Salal Ali, Umm Salal Mohammad, Umm Obairiyah and Umm Garn.<br/></p><p><b>Scope:</b></p><ul><li>Earthworks (141.000 m<sup>3</sup> excavation, 587.000 m<sup>3</sup> fill),</li><li>Subbase (783.000 m<sup>2</sup>, 300 mm thick),</li><li>Asphalt Pavement (270.000 tons),</li><li>Curbs and footways (185.000 m curbs, 260.000 m<sup>2</sup> paving blocks, 60 mm thick),</li><li>Potable Water Lines and Valve Chambers (2.900 m, 400 mm dia., 10 chambers),</li><li>HV/MV Cables (25.000 m, 11 kV; 3.000 m, 415 V),</li><li>Maintenance of traffic and detours, Relocation, Realignment and Diversion of Existing Utilities, Electrical and Telecommunication works,</li><li>Road Lighting works including the installation of street lighting columns and high masts (27 km of roads),</li><li>Landscaping &amp; Irrigation,</li><li>Construction of approximately 3,9 km drainage works (1.200 mm dia. Concrete Pipes; 2 Resevoirs 4.000 m<sup>3</sup> each),</li><li>Telecommunication Works (Q-Tel Lines 40 km),</li><li>Ducting for Intelligent Transport Systems (25 km),</li><li>Traffic Signing and Road Marking,</li><li>Traffic Signalization Works (13 junctions).</li></ul>","text_promotion":""},{"id":107,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/motorway_0004_142.jpg","project_type":{"title":"Motorway","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-highway.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/142-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/142-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/142-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/142-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/142-5.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/142-6.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/142-7.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/142.jpg","commence":"17-06-1987","complete":"28-09-2002","title":"Tarsus - Adana - Gaziantep (TAG) Motorway","slug":"tarsus-adana-gaziantep-tag-motorway","job_no":"142","portion":75.0,"client":"General Directorate of Highways","latitude":36.945805,"longitude":34.86577,"contractor":"Tekfen Construction and Installation Co., Inc.- Impresit (Italy) J.V.","description":"<p>TAG Motorway is the largest project implemented by Tekfen within the scope of a single contract. The project’s scope covers the design, construction and one year maintenance of a 258 km motorway and 46 km of connection roads between Tarsus - Pozantı (intersection) - Adana - Toprakkale and Gaziantep, located at southern, mountainous area of Turkey, connecting fertile lands of Harran, Şanlıurfa and agro-industrial Çukurova Area with Mediterranean ports while standing as a safe and modern crossroad extending towards the near-east and Gulf countries.<br/></p><p>The first 28 km portion is built as a 2 x 4 lanes motorway while the remaining (major) part consists of 2 x 3 lanes. 14 viaducts with a total length of 5.232 m (in one direction) and 5 double tube 3 lane tunnels with 5.352 m total length (in one direction) including one cut and cover tunnel, are constructed within the same scope.<br/></p><p>The TAG Motorway, which crosses the most complex geological formations encountered in the region and probably in Turkey, the Nur and Amanos mountain chains, part of the Toros Mountains, is designed and built in accordance with the highest existing international standards. Tekfen Engineering Co., Inc., an affiliate of Tekfen Holding, undertook major responsibilities in the design works of this challenging project.<br/></p><p>Tekfen’s Steel Structure Fabrication Plant located at Ceyhan was fully operational with its two workshops at the end of 1993. Its initial major task was fabricating the steel decks of various road bridges up to 1.200 m length for TAG Motorway.</p><p></p><p><b>DESIGN STANDARDS</b></p><ul><li>Number of lanes: 2 x 4 (28 km) and 2 x 3 (230 km)</li><li>Width of traffic lanes: 3,75 m</li><li>Emergency lane: 3,00 m</li><li>Centre strips: 10 - 12 - 18,75 m</li><li>Min. curb radius: 700 m</li><li>Max. longitudinal slope: 4% (at the two mountainous regions: 4,5%)</li><li>Design speed: 120 km / hr</li><li>Inside tunnels: 90 km / hr</li><li>Number of parking areas: 8</li><li>Number of service areas: 4</li><li>Number of maintenance areas: 5</li></ul><p></p><p><b>QUANTITES OF MAIN WORK ITEMS</b></p><ul><li>Excavation: 110.471.583 m<sup>3</sup></li><li>Fill: 82.027.741 m<sup>3</sup></li><li>Concrete: 2.050.000 m<sup>3</sup></li></ul><p></p><p><b>PAVEMENTS</b></p><ul><li>Mechanically stabilized: 4.514.000 m<sup>3</sup></li><li>Cement bound granular sub-base: 1.773.000 m<sup>3</sup></li><li>Bituminous sub-base: 2.183.000 t</li><li>Binder course: 1.460.000 t</li><li>Wearing course: 1.241.000 t</li></ul><p></p><p><b>INTERCHANGES</b></p><ul><li>17 major interchanges on the project, 16 of them with toll areas.</li></ul><p></p><p><b>THE VIADUCTS</b></p><ul><li>The TAG Motorway encompasses 14 viaducts with a total length of 5.232 m (in one direction). The two special viaducts built between Bahçe and Kömürler regions are among the highest and most impressive structures of Europe and the Balkans Area.</li></ul><p><b>THE LENGTH OF THE VIADUCTS</b></p><ul><li>Seyhan<br/>Length: 470,00 m. Height: 18,50 m.</li><li>Ceyhan<br/>Length: 239,16 m. Height: 17,80 m.</li><li>Toprakkale<br/>Length: 121,87 m. Height: 12,80 m.</li><li>Şekerdere<br/>Length: 401,00 m. Height: 41,20 m.</li><li>Yarbaşı<br/>Length: 383,32 m. Height: 40,70 m.</li><li>Burkaçlı<br/>Length: 274,16 m. Height: 35,50 m.</li><li>Vecdi Diker<br/>Length: 388,00 m. Height: 16,70 m.</li><li>Ayran<br/>Length: 388,46 m. Height: 34,70 m.</li><li>Kızlaç<br/>Length: 521,95 m. Height: 26,70 m.</li><li>Şehitler<br/>Length: 309,50 m. Height: 59,70 m.</li><li>Nurdağı<br/>Length: 306,78 m. Height: 32,70 m.</li><li>Atatürk (Special Via, no:1)<br/>Length: 808,70 m. Height: 146,00 m.</li><li>Turgut Özal (Special Via, no:2)<br/>Length: 426,01 m. Height: 90,00 m.</li><li>Başpınar<br/>Length: 309,50 m. Height: 63,50 m.</li></ul><p></p><p><b>THE TUNNELS</b><br/></p><p>TAG Project consists of 5 double tube tunnels with a total length of 5.352,50 m (in one direction) 4 of which are built with the “New Austrian Tunnelling Method” (NATM) while the fifth one, a 300 m long Tunnel, built by “Cut and Cover Method”.</p><p></p><p><b>TECHNICAL INFORMATION FOR THE TUNNELS</b></p><ul><li>Adana (Cut and Cover)<br/>Length: 300,00</li><li>Taşoluk (NATM)<br/>Length: 376,00</li><li>Ayran (NATM)<br/>Length: 595,50</li><li>Kızlaç (NATM)<br/>Length: 2.851,00</li><li>Aslanlı (NATM)<br/>Length: 1.230,00</li></ul><p></p><p><b>TAG MOTORWAY ELECTRICAL AND TELECOMMUNICATION WORKS</b></p><ul><li>Number of toll areas: 16</li><li>Number of maintenance centers: 5</li><li>Number of emergency telephones: 260</li><li>Number of main control centers: 1</li></ul><p></p><p><b>Main Works for the Electrical System:</b></p><ul><li>Displacement of HV, LV, MV overhead transmission lines, displacement of telecommunication lines belonging to the Turkish Telecom Co., Inc.,</li><li>Motorway lighting systems,</li><li>Tunnel lighting and ventilation systems,</li><li>Construction and installation of feeder lines for the substation buildings and toll areas,</li><li>Construction and installation of substation buildings for illumination systems.</li></ul><p></p><p><b>Main Works for the Low Voltage Systems:</b></p><ul><li>Construction and installation of maintenance centers,</li><li>Procurement and installation of the motorway’s toll systems,</li><li>Procurement and installation of the emergency telephone systems,</li><li>Procurement and installation of the tunnel control systems, variable traffic signs, data gathering systems, fire alarm systems and tunnel telephone systems.</li></ul>","text_promotion":""},{"id":108,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/motorway_0003_225.jpg","project_type":{"title":"Motorway","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-highway.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/225-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/225-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/225-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/225-4.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/motorway_0002_225.jpg","commence":"02-10-1997","complete":"31-07-2008","title":"Perşembe - Bolaman Coastal Motorway","slug":"persembe-bolaman-coastal-motorway","job_no":"225","portion":33.0,"client":"General Directorate of Highways","latitude":40.988588,"longitude":37.890577,"contractor":"Tekfen Construction and Installation Co., Inc. - Nurol - Yüksel J.V.","description":"<p>Having successfully completed the US$ 2 Billion worth, 258 km long Tarsus-Adana-Gaziantep, TAG Motorway scheme as of September 2002, Tekfen Construction and Installation Co., Inc. sails to new challenging horizons. TAG Motorway was the largest project implemented by Tekfen within the scope of a single contract.<br/></p><p>Presently, as a member of two separate J.V. groups, Tekfen has undertaken major responsibilities at three new motorway projects, all being located along the rough and mountainous regions of Turkey.</p><p></p><p><b>HIGHLIGHTS</b></p><ul><li>27 km, 2x2 lane motorway,</li><li>44 viaducts with a total length of 8.141 m,</li><li>2 main interchanges,</li><li>5 double tube tunnels with a total length of 4.716 m; one being the longest motorway tunnel in Turkey with a length of 3.850 m.</li></ul>","text_promotion":""},{"id":109,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/motorway_0002_252.jpg","project_type":{"title":"Motorway","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-highway.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/252-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/252-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/252-1.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/252.jpg","commence":"01-07-1998","complete":"30-04-2011","title":"Gaziantep - Birecik Motorway","slug":"gaziantep-birecik-motorway","job_no":"252","portion":25.0,"client":"General Directorate of Highways","latitude":37.066524,"longitude":37.381206,"contractor":"Tekfen Construction and Installation Co., Inc. - Tübin-Özdemir J.V.","description":"<p>Having successfully completed the US$ 2 Billion worth, 258 km long Tarsus - Adana - Gaziantep, TAG Motorway scheme as of September 2002, Tekfen Construction and Installation Co., Inc. started, as a member of a J.V., the next section of the TEM (Trans European Motorway) between Gaziantep and Birecik (Şanlıurfa).</p><p></p><p><b>HIGHLIGHTS</b></p><ul><li>53,4 km 2x3 lane motorway,</li><li>3 viaducts with total length of 2.111 m,</li><li>3 interchanges,</li><li>18 underpasses,</li><li>4.500 m<sup>2</sup> retaining walls,</li><li>100 km drainage system.</li></ul>","text_promotion":""},{"id":110,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/motorway_0001_230.jpg","project_type":{"title":"Motorway","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-highway.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/230-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/230-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/230-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/230-2.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/230.jpg","commence":"14-10-1998","complete":"30-06-2015","title":"Çiftehan - Pozanti Motorway","slug":"ciftehan-pozanti-motorway","job_no":"230","portion":70.65,"client":"General Directorate of Highways","latitude":37.997037,"longitude":34.675736,"contractor":"Tekfen Construction and Installation Co., Inc. - Tübin-Özdemir J.V.","description":"<p>Having successfully completed the US$ 2 Billion worth, 258 km long Tarsus-Adana-Gaziantep, TAG Motorway scheme as of September 2002, Tekfen Construction and Installation Co., Inc. sails to new challenging horizons. TAG Motorway was the largest project implemented by Tekfen within the scope of a single contract.<br/></p><p>Presently, as a member of two separate J.V. groups, Tekfen has undertaken major responsibilities at three new motorway projects, all being located along the rough and mountainous regions of Turkey.</p><p></p><p><b>HIGHLIGHTS</b></p><ul><li>18,5 km 2 x 3 lane motorway,</li><li>2,5 km 1 x 2 lane connection road,</li><li>14 viaducts with total length of 4.430 m,</li><li>4 overpasses,</li><li>3 underpasses,</li><li>7.550 m<sup>2</sup> reinforced earth retaining wall,</li><li>2 double tube tunnels with total length of 842 m.</li></ul>","text_promotion":""},{"id":111,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/342-kapak.jpg","project_type":{"title":"Topside / Offshore Platform & Modules","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-topside.png"},"project_status":"Completed","project_location":"Azerbaijan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/49-GS8_5945.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/DSC02546.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/20170702_052901.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/DSC06597.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/46-GS7_4665_1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/19621181_799000990267790_3957540606801400497_o.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/34-BAYIL-27.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/37-GS7_4657.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/32-GS8_6030.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/027.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/2d1f2f7b-e77f-4749-9b35-0b144bd53138-large.jpg"],"photo_promotion":"None","commence":"01-01-2014","complete":"31-05-2017","title":"Shah Deniz Stage 2 (SD2) Project Fabrication Of Offshore Facilities And Hook Up And Commissioning Support","slug":"shah-deniz-stage-2-sd2-project-fabrication-offshore-facilities-and-hook-and-commissioning-support","job_no":"342","portion":51.0,"client":"BP Exploration (Shah Deniz) Limited","latitude":41.935129,"longitude":50.669771,"contractor":"ATA Consortium (Amec - Tekfen - Azfen)","description":"<p>The Shah Deniz field is located in the Azerbaijan sector of the Caspian Sea, approximately 100km south of Baku and 90 km east-south east of Sangachal in water depths ranging from 50m to 500m.<br/></p><p>The Shah Deniz Stage 2 a high pressure gas and condensate reserve is approximately 21 km long and 10 km wide. The SD2 development consists of a series of subsea manifolds and associated well clusters tied back to the fixed Shah Deniz Bravo (SDB) platform complex by flow lines. The manifolds are located on the north, west and east flanks of the field development area.<br/></p><p>The Shah Deniz Bravo (SDB) Platform Complex will include a Production and Risers platform (SDB-PR), where the well production fluids will be received, processed and exported to the onshore terminal via separate gas and liquid pipelines, and a Quarters and Utilities platform (SDB-QU) bridge linked to SDB-PR.<br/></p><p>The WORK comprises the fabrication of the PERMANENT WORKS, for the SDB-PR and SDB-QU Topsides Facilities and their Interconnecting Bridge including the integration of the SDB-QU Living Quarters.<br/></p><p>The scope of the WORK includes the onshore fabrication, assembly, erection, testing, hook-up, mechanical completion, weighing, jacking, onshore completion and loadout of the PERMANENT WORKS onto a COMPANY provided transportation barge. The PERMANENT WORKS will be transported offshore and installed by COMPANY&#x27;S Transport and Installation Contractor.<br/></p><p>The ATA&#x27;S scope of WORK also includes the supply of labour, supervision, onshore support, temporary equipment, tools and consumables as necessary to support the COMPANY led offshore Hook-Up and Commissioning (HUC) of the PERMANENT WORKS including platforms start up assistance.<br/></p><p>The project is undertaken in consortium with Azfen and AMEC.<br/></p><p>The SD2 Bravo Offshore Facilities comprise the following:<br/></p><p><b>1) SDB-QU Living Quarters and Utilities Deck, 10.111 Tons</b></p><ul><li>Flow line reception facilities.</li><li>Production and test manifolds.</li><li>2 phase high pressure well fluid separation.</li><li>2 phase low pressure separation.</li><li>3 phase test separation.</li><li>Flash gas re-compression.</li><li>Gas export to shore via marine pipelines (2 no.).</li><li>Condensate export to shore via marine pipeline.</li><li>MEG import from shore via marine pipeline.</li><li>Flare system and boom.</li><li>Fuel gas and marine pipeline gas buy-back systems.</li><li>Flow lines Direct Electrical Heating Interface<br/></li></ul><p><b>2) SDB-PR Production and Subsea Flow Line Risers Deck, 15.920 Tons</b></p><ul><li>Living Quarters with helideck (integration only).</li><li>Power generation and distribution.</li><li>Direct Electrical Heating system for subsea flow line hydrate management.</li><li>MEG bulk storage and distribution to subsea bulk lines and subsea production systems.</li><li>Subsea hydraulic power system.</li><li>Subsea controls interface.</li><li>Chemical injection system.</li><li>Utilities, platform support systems and infrastructure.<br/></li></ul><p><b>3) Bridge Linking PR and QU Decks, 411 Tons</b></p><ul><li>Total: 26.442 Tons</li></ul>","text_promotion":""},{"id":112,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/DSC_0181.jpg","project_type":{"title":"Terminal","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-terminal.png"},"project_status":"Completed","project_location":"Azerbaijan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/DSC_0181.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/DSC_0181.jpg","commence":"03-04-1996","complete":"25-09-1997","title":"Electro - Mechanical Works And Storage Tanks At Sangachal Terminal","slug":"electro-mechanical-works-and-storage-tanks-sangachal-terminal","job_no":"207, 206, 202","portion":85.0,"client":"AIOC, Azerbaijan International Operating Company","latitude":40.197867,"longitude":49.478506,"contractor":"Tekfen Construction and Installation Co., Inc. - Azfen J.V.","description":"<p>Azerbaijan Early Oil Transportation Project aims to transport the crude oil of Guneshli and Chiraq fields of the Caspian to Sangachal Terminal located approximately 50 km south of Baku.<br/></p><p>Tekfen undertook major responsibilities within this scheme.<br/></p><p>The works covered by Tekfen within this scope were executed under three separate contracts;<br/><br/><b> 1- Mechanical, Electrical and Instrumentation Works of the Sangachal Terminal<br/>(Job No: 207, US$ 4.590.000)</b></p><p></p><p>Tekfen’s scope covered all electro-mechanical works including the erection of equipment, inter-equipment connections, electrical and instrumentation works, painting and miscellaneous activities to complete the terminal.<br/></p><p>Civil works were not in the scope of Tekfen and carried out by other companies. The equipment and bulk material were free-issued by the client.<br/></p><p>Engineering works of the project were under the responsibility of Brown &amp; Root, while Fluor Daniel - UK had overtaken technical consultancy until the signing of the contracts.<br/><br/><b>2- Storage Tanks<br/>(Job No: 202, US$ 6.603.700)</b></p><p></p><p>Design, engineering, procurement, fabrication and erection of 4 Floating Roof Crude Oil Tanks with 25.500 m<sup>3</sup> capacity each. Design and construction of tank foundations were carried out by other companies.</p><p></p><p><b>3- Offspec Oil Storage Tank<br/>(Job No: 206, US$ 366.000)</b></p><p></p><p>Engineering, procurement, fabrication and erection of 2.400 m<sup>3</sup> Offspec Tank at Sangachal Terminal. Foundations were not in Tekfen’s scope.<br/></p><p>The steel material for tanks was mainly purchased from Turkey. Prefabrication works were subcontracted to SPS, an affiliated company of SOCAR (State Oil Company of Azerbaijan Republic).</p>","text_promotion":""},{"id":113,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0013_287_YxP6LfK.jpg","project_type":{"title":"Topside / Offshore Platform & Modules","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-topside.png"},"project_status":"Completed","project_location":"Azerbaijan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/287-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/287-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/287-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/287-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/287-5.jpg"],"photo_promotion":"None","commence":"20-09-2004","complete":"04-01-2008","title":"Process, Compression, Water Utility (Pcwu) Platform, Topside Fabrication Works","slug":"process-compression-water-utility-pcwu-platform-topside-fabrication-works","job_no":"287","portion":53.5,"client":"AIOC, Azerbaijan International Operating Company","latitude":40.366102,"longitude":49.92593,"contractor":"ATA Consortium (Amec - Tekfen - Azfen)","description":"<h3><a href=\"https://youtu.be/hUX81Fo7iws\">Project Movie »</a></h3><p></p><hr/><p><br/></p><p>Process, Compression, Water Utility (PCWU) Project is within the Azeri - Chirag - Guneshli Full Field Development scheme in Baku.<br/></p><p>The Project’s scope covers full works of a 13.500 t platform; onshore fabrication, assembly, erection, testing, mechanical completion, commissioning, weighing, jacking, onshore completion and load-out of integrated deck with 4 levels (under deck, cellar deck, wheather deck and upper level deck) which incorporates topside facilities, a flare structure and a bridge.<br/></p><p>The project was undertaken in partnership with Azfen* and AMEC.<br/></p><p>Procurement, field and plant fabrication, sand blasting and painting, coating, heavy load transport, quality assurance and control (in partnership with AMEC), equipment installation, complete electrical and instrumentation, testing &amp; commissioning assistance were also within the work scope.<br/></p><p>Major portion of carbon steel, stainless steel, duplex and super duplex steel (steel construction / piping) was manufactured at Tekfen’s Steel Structure Plant at Ceyhan, Turkey.<br/></p><p><i>*Azfen is a partnership between Tekfen and SOCAR, State Oil Company of Azerbaijan.</i></p>","text_promotion":""},{"id":114,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0012_271_FIJoOJk.jpg","project_type":{"title":"Terminal","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-terminal.png"},"project_status":"Completed","project_location":"Azerbaijan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/271-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/271-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/271-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/271-5.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/271-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/271-6.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/271-7.jpg"],"photo_promotion":"None","commence":"01-09-2003","complete":"30-06-2006","title":"Shah Deniz Gas Export Onshore Terminal","slug":"shah-deniz-gas-export-onshore-terminal","job_no":"271","portion":50.0,"client":"BP Exploration Caspian Sea Limited on behalf of BP Exploration Shah Deniz Ltd and South Caucasus Pipeline Company","latitude":41.935113,"longitude":50.669664,"contractor":"Tekfen Construction and Installation Co. Inc. - Azfen* J.V.  * Azfen is a partnership between Tekfen and SOCAR, State Oil Company of Azerbaijan.","description":"<p>The Shah Deniz Gas Export Terminal Project involves development of Shah Deniz gas-condensate field in the Caspian Sea for a gas production of 5-7 billion m<sup>3</sup>/annum at the 1st stage.<br/></p><p>It includes a drilling and production platform at sea, twin gas and condensate sub-sea pipelines, onshore gas and condensate pipelines, processing facility at onshore terminal adjacent to AIOC facilities at Sangachal. The project is linked with a main gas export pipeline to Turkey’s Natural Gas Pipeline system at Erzurum.<br/></p><p>A sub-sea system will be added at a later stage to further exploit the potential of the eastern flank of the field.<br/></p><p>The Onshore Terminal is located at Sangachal, where the Early Oil Production facilities were constructed by Tekfen- Azfen Alliance in 1996-97.<br/></p><p>The works are executed under ‘Main Construction Works’ contract, which covers the following packages:<br/></p><ul><li>Terminal Main Construction Works which includes all construction works required for gas and condensate processing:<ul><li>Gas System - (reception, two process trains for treatment and conditioning of 900 mmscfd* gas, recompression and export metering).</li><li>Oil (condensate) System (reception, stabilization and treatment 62.000 bpd, metering and pumping).</li></ul></li><li>Onshore Pipelines between Shore and Terminal.</li><li>Condensate, Rich MEG and Lean MEG (mono-ethyleneglycol) Storage Tanks.</li><li>Power and utility systems.</li><li>Buildings.<br/></li></ul><p>The storage and fabrication facilities, permanent buildings within terminal, tanks and pipelines were executed on EPC basis. Civil and structural steel, insulation and paint materials for main construction works were procured by Tekfen.<br/></p><p><i>*(mmscfd:Millions of Standard Cubic Feet per Day of Gas)</i><br/></p><p>HIGHLIGHTS</p><ul><li>Reinforced Concrete: 40.976 m<sup>3</sup></li><li>Asphalt Road: 32.000 m<sup>2</sup></li><li>Structural Steel: 40.045 t</li><li>Piping Erection: 6.036 t</li><li>Electrical &amp; Instrument Cabling: 734 km</li><li>Gas &amp; Condensate Pipelines 26&quot;-12&quot;- 4&quot;: 5.340 m</li><li>Storage Tanks (25.500 m<sup>3</sup> - 3.900 m3-2.300 m<sup>3</sup>): 3</li><li>Terminal Buildings: 1.952 m<sup>2</sup></li></ul>","text_promotion":""},{"id":115,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0011_280_KcZwJx8.jpg","project_type":{"title":"Topside / Offshore Platform & Modules","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-topside.png"},"project_status":"Completed","project_location":"Azerbaijan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/280-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/280-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/280-3.jpg"],"photo_promotion":"None","commence":"29-10-2002","complete":"15-12-2003","title":"STB1 - Barge Upgrading Works","slug":"stb1-barge-upgrading-works","job_no":"280","portion":50.0,"client":"Saipem S.p.A.","latitude":41.935113,"longitude":50.669664,"contractor":"Tekfen Construction and Installation Co. Inc. - Azfen J.V.","description":"<p>The Enhancement of Crude Export Facilities Project is consisting of the construction of eight new crude oil storage tanks, each with a net operating capacity of 618.000 Bbbls, and their associated facilities in EPCC basis. The purpose of the project is to increase the total crude export capacity and to improve operating reliability and flexibility. The project is developed in two portions:<br/></p><p>The Caspian Basin is important for world energy markets because of its potential in oil and natural gas reserves.<br/></p><p>STB-1 Barge Upgrading Works Project is another challenging scheme undertaken by Tekfen in Azerbaijan.<br/></p><p>Transportation and installation of DQ1 (Production Drilling &amp; Quarters Platform) and of C&amp;WP (Compression &amp; Water Injection Platform) and of their jackets to be built for Azeri-Chirag-Guneshli oil fields of AIOC (Azerbaijan International Operating Company), were contracted to Saipem S.p.A. (Italy). Tekfen-Azfen* J.V. undertook upgrading works of the STB-1 Barge which was to carry out the transport of these two platforms to the oil fields located in the Caspian Sea.<br/></p><p>Manufacturing and erection of the additional ballast systems for STB-1 Barge and preparation of the test-weights for the crane vessel (DBA) were also undertaken by Tekfen-Azfen J.V. within the same scope.<br/></p><p>Manufacturing and erection works of 1.250 t steel and 125 t piping systems were successfully carried out within the barge-upgrading scheme.<br/></p><p><i>*Azfen is a partnership between Tekfen and SOCAR, State Oil Company of Azerbaijan.</i></p>","text_promotion":""},{"id":116,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0010_278_tGvdMyO.jpg","project_type":{"title":"Topside / Offshore Platform & Modules","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-topside.png"},"project_status":"Completed","project_location":"Azerbaijan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/278-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/278-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/278-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/278-1.jpg"],"photo_promotion":"None","commence":"18-09-2002","complete":"31-08-2005","title":"Compression & Water Injection Platform (CWP), Topside Fabrication Works","slug":"compression-water-injection-platform-cwp-topside-fabrication-works","job_no":"278","portion":39.9,"client":"AIOC, Azerbaijan International Operating Company","latitude":40.113057,"longitude":51.188062,"contractor":"ATA Consortium (Amec - Tekfen - Azfen)","description":"<p>The Azeri, Chirag and Guneshli fields are located in the Azeri territory of the Caspian Sea, approximately 120 km South East of Baku, in water depths ranging from 100 m to 400 m and covering an area of 432 km<sup>2</sup>. The primary oil bearing strata in the fields take place at depths ranging from 2.500 m to 3.000 m below the surface. Gas and Condensate are also present in the reservoirs.<br/></p><p>Development of the contracted area is scheduled to progress in several consecutive phases, eventually reaching an output over 1.000.000 bpd. Project sanction was obtained in September 2001 for the development of the central area of the Azeri field. Assets to be constructed include the Central Azeri Drilling &amp; Quarters Platform, Compression &amp; Water Injection Platform (C&amp;WP) and West Azeri and East Azeri production platforms.<br/></p><p>C&amp;WP facilities provide all gas and water requirements necessary to support production from the entire Azeri field, additionally exporting electrical power via sub sea power cables to the West and East Azeri Platforms. The C&amp;WP facilities to be constructed by the ATA (Amec-Tekfen-Azfen) Consortium comprise an integrated deck that incorporates the topsides facilities and pipeline risers, a flare structure and a bridge adjoining Central Azeri.<br/></p><p>The integrated deck provides the structural framing among the jacket towers and supports the gas compression, water injection, power generation and flare structures. The injection requirements of C&amp;WP are determined by the needs of Central, West and East Azeri Platforms and consists of two electrical power generation packages, four gas injection compressors and four water injection pumps. The integrated deck has also been designed to support two future Gas Export Compression Trains.<br/></p><p><b>The detailed scope can be summarized as follows:</b><br/></p><ul><li>Fabrication and fitting out of the Integrated Deck including pressure vessels, tanks, mechanical equipment, piping, electrical and instrumentation cables, cable rack, cable tray and supports. Any detailed engineering necessary for fabrication shop drawings, sub-assemblies, erection, lifting procedures, temporary installation aids and attachments.</li><li>Receipt, storage, fabrication, erection, post-weld heat treatment (PWHT), non-destructive examination (NDE), coating and certification of all structural steel including rolling and field machining as required in and out of country.</li><li>Receipt, storage, fabrication, erection, bolt tensioning, PWHT, NDE, pressure testing, nitrogen/helium leak testing, coating and certification of all piping system components.</li><li>Onshore assembly, mechanical completion, pre-commissioning, commissioning, and offshore hook-up, pre-commissioning, commissioning and start-up assistance of the Integrated Deck.</li><li>Structural weld out of the Bridge to the C&amp;WP Integrated Deck and the CA topsides. Complete the hook-up of all piping, electrical and instrument connections between the Bridge, C&amp;WP Integrated Deck, C&amp;WP Jacket and CA topsides.</li><li>Load out, sea fastening and transportation of sub-structures to the Integrated Deck Assembly including provision of all facilities, equipment, rigging, load out frames, foundations for lifting/jacking-up and transportation vessels/barges.</li><li>Complete weld out, NDE and coatings touch-up of the Integrated Deck cellar deck to Jacket connection after the mating of Integrated Deck and Jacket, including removal of temporary steelwork, sea fastening and scaffolding.</li></ul><p>HIGHLIGHTS<br/></p><ul><li>Structural Steel: 5.993 t</li><li>Piping: 2.737 t (5.832 Spools)</li><li>Pipe Work Testing: 1.154 unit</li><li>Blast &amp; Painting: 90.000 m<sup>2</sup></li><li>Equipment Installation: 169 ea (3.375 t)</li><li>Instrument Installation: 1.700</li><li>Instrument Tubing: 8.900 m</li><li>Electrical Racking: 7312 m</li><li>Electrical Cabling: 238.343 m</li><li>Gland and Termination: 10.300 unit</li><li>Jacking and Off-Loading: 14.500 t</li></ul>","text_promotion":""},{"id":117,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0009_267_YEtp6jB.jpg","project_type":{"title":"Topside / Offshore Platform & Modules","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-topside.png"},"project_status":"Completed","project_location":"Azerbaijan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0009_267_YEtp6jB.jpg"],"photo_promotion":"None","commence":"31-05-2002","complete":"31-03-2009","title":"Azeri, Chirag, Guneshli Onshore Terminal Phase 1, 2 & 3","slug":"azeri-chirag-guneshli-onshore-terminal-phase-1-2-3","job_no":"267, 269","portion":54.9,"client":"BP Exploration Caspian Sea Limited on behalf of AIOC, Azerbaijan International Operating Company","latitude":40.113057,"longitude":51.188062,"contractor":"Tekfen Construction and Installation Co. Inc. - Azfen* J.V.  * Azfen is a partnership between Tekfen and SOCAR, State Oil Company of Azerbaijan.","description":"<p>The ACG Onshore Terminal Project involves development of Azeri, Chirag and Guneshli oil fields in the Caspian Sea with a daily production of 1.000.000 bbls and transfer of the crude oil to marine terminals. The project scheme includes construction of several drilling and production platforms, one compression &amp; water injection platform (C&amp;WP), subsea gas and oil pipelines, onshore gas and oil pipelines, oil and gas processing plants at onshore terminal.<br/></p><p>The investment program is within the BTC (Baku-Tbilisi-Ceyhan) scheme targeting the flow of Caspian crude oil to the Mediterranean Terminal of Ceyhan in Turkey.<br/></p><p>The ACG Field Development project is completed in three phases.<br/></p><p>The Onshore Terminal is located at Sangachal, where the Early Oil Production facilities were constructed by Tekfen-Azfen J.V. in ‘96-‘97.<br/></p><p>The works are executed under two separate contracts;<br/> 1- Preliminary civil works with a contract value of US$ 7.800.000,<br/> 2- Main construction works covering the following packages:</p><ul><li>Terminal Main Construction Works, which includes all construction works required for oil and gas processing including off-spec tanks,</li><li>Onshore Pipelines between the shore and the Terminal,</li><li>BTC Head Pump Station for oil export,</li><li>Dew Point Control Unit for gas treatment prior to delivery for domestic use,</li></ul><p>The camp and office accommodation, storage and fabrication facilities, permanent buildings within terminal, tanks and pipelines were executed on EPC basis. Civil, structural steel, insulation and paint materials for main construction works are procured by Tekfen.<br/></p><p><b>HIGHLIGHTS</b></p><ul><li>Site Preparation: 4.000.000 m<sup>2</sup></li><li>Reinforced Concrete: 181.731 m<sup>3</sup></li><li>Permanent office, training centre &amp; camp facilities: 1.000 person</li><li>Asphalt Road: 51.500 m<sup>2</sup></li><li>Structural Steel: 9.800 t</li><li>Piping Erection: 10.353 t</li><li>Electrical &amp; Instrument Cabling: 2.244 km</li><li>Oil &amp; Gas Pipelines: 12&quot;-30&quot; - 14.5 km</li><li>Tanks (3 offspecs, 1 open drain): 14.800 m<sup>3</sup></li><li>Terminal Buildings: 9.586 m<sup>2</sup></li></ul><p>The 1<sup>st</sup>, 2<sup>nd</sup> and 3<sup>rd</sup> phases, including DPCU2, BTC 1,2 mbd capacity expansion, Produced Water System and Open Drain Holding System, are successfully completed by Tekfen.</p>","text_promotion":""},{"id":118,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0008_320_sslDs9O.jpg","project_type":{"title":"Topside / Offshore Platform & Modules","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-topside.png"},"project_status":"Completed","project_location":"Azerbaijan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/53GS7_0815.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/46Bayil1012-13.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/38Bayil1012-10.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/22GS7_9485.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/19Bayil1012-17.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/17Bayil1012-15.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/13Bayil1012-18.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/05Bayil1012-32.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/02Bayil1012-24.jpg"],"photo_promotion":"None","commence":"15-01-2010","complete":"31-12-2013","title":"COP-WC-PDQ Fabrication Of Topsides, Drilling Facilities And The Integration Of Living Quarters","slug":"cop-wc-pdq-fabrication-topsides-drilling-facilities-and-integration-living-quarters","job_no":"320","portion":64.0,"client":"AIOC, Azerbaijan International Operating Company","latitude":40.113057,"longitude":51.188062,"contractor":"ATA Consortium (Amec - Tekfen - Azfen)","description":"<h3><a href=\"https://youtu.be/LsxVG6t5TNk\">Project Movie »</a></h3><p></p><hr/><p><br/></p><p>COP-WC-PDQ (Chiraq Oil Project - West Chirag - PDQ) is a single integrated deck comprising a Production Platform, Drillig Module, utilities and Living Quarters located 120 km South East of Baku, in water depths of 170 meters within the 432 km<sup>2</sup> “Azeri - Chirag – Guneshli” Oil Field.<br/></p><p>Topsides assembled into an Integrated Deck provides the structural framing between the Jacket towers and supports the Drilling Facilities Modules, Living Quarters, three main and one emergency power generation packages, the HV Switchroom on the cellar deck, LV Switchroom/LER rooms on the mezzanine deck, flare boom and the platform crane pedestals.<br/></p><p>The overall weight of the Topsides is about 18.500 tons. The onshore work scope covers fabrication, assembly, erection, testing, mechanical completion, commissioning, weighing, jacking, onshore completion and load-out of integrated deck. The offshore work scope covers offshore hook up and commissioning assistance works.<br/></p><p>The project was undertaken in partnership with Azfen and AMEC.<br/></p><p><b>The detailed scope can be summarised as follows:</b></p><ul><li>Fabrication and fitting out of the Integrated Deck including pressure vessels, tanks, mechanical equipment, piping, electrical and instrumentation cables, cable rack, cable tray and supports. Any detailed engineering necessary for fabrication shop drawings, sub-assemblies, erection, lifting procedures, temporary installation aids and attachments.</li><li>Receipt, storage, fabrication, erection, post-weld heat treatment (PWHT), non-destructive examination (NDE), coating and certification of all structural steel including rolling and field machining as required in and out of country.</li><li>Receipt, storage, fabrication, erection, bolt tensioning, PWHT, NDE, pressure testing, nitrogen/helium leak testing, coating and certification of all piping system components.</li><li>Onshore assembly, mechanical completion, pre-commissioning, commissioning, and offshore hook-up, pre-commissioning, commissioning and start-up assistance of the Integrated Deck.</li><li>Structural weld out of the Integrated Deck, complete the hook-up of all piping, electrical and instrument connections between Integrated Deck and Jacket.</li><li>Load out, sea fastening and transportation of sub-structures to the Integrated Deck Assembly including provision of all facilities, equipment, rigging, load out frames, foundations for lifting/jacking-up and transportation vessels/barges.</li><li>Complete weld out, NDE and coatings touch-up of the Integrated Deck cellar deck to Jacket connection after the mating of Integrated Deck and Jacket, including removal of temporary steelwork, sea fastening and scaffolding.</li></ul>","text_promotion":""},{"id":119,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/341-kapak.jpg","project_type":{"title":"Terminal","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-terminal.png"},"project_status":"Completed","project_location":"Azerbaijan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/68-DSC_9284.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/68-GS8_8107.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/25-GS8_7769.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/42-CS1_7659.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/37-GS8_5037-A.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/45-SNGCHL17-8.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/33-GS7_4787.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/57-GS8_7233.jpg"],"photo_promotion":"None","commence":"27-01-2014","complete":"15-10-2017","title":"Shah Deniz Project Stage 2 Sangachal Onshore Terminal Facility","slug":"shah-deniz-project-stage-2-sangachal-onshore-terminal-facility","job_no":"341","portion":37.0,"client":"BP Exploration (Shah Deniz) Limited","latitude":40.196949,"longitude":49.477476,"contractor":"Tekfen Construction and Installation Co. Inc. - Azfen J.V.","description":"<h3><a href=\"https://youtu.be/-h6ayJBoosU\">Project Movie »</a></h3><p></p><hr/><p><br/>Shah Deniz Stage 2 Onshore Terminal Facility will be constructed at Sangahcal Terminal, located 45 km. South of Baku city centre.<br/></p><p>The facility comprises:</p><ul><li>Onshore Gas and Condensate Processing Plant</li><li>Power Generation</li><li>Storage Tanks</li><li>Utilities</li><li>Telecommunications and Control Room</li><li>Onsite Buildings</li><li>Onshore pipelines from the offshore pipeline beach landing site to the terminal</li><li>Brownfield Works in the existing Sangachal Terminal mainly consisting of process and utility tie-ins and a new Central Control Building.</li><li>Temporary Facilities</li></ul><p>The scope of work associated with the above facilities will include civil engineering work, piling, foundations, underground and open drainage systems, terminal access and internal roads, process equipments, storage tanks including design, pipe racks, piping, electrical and control systems construction and installation activities.<br/></p><p>The preliminary quantities for main scope of activities are :</p><ul><li>Asphalt Roads and pavement: 400.000 m<sup>2</sup></li><li>Excavation: 850.000 m<sup>3</sup></li><li>Concrete: 100.000 m<sup>3</sup></li><li>Piling: 80000 m</li><li>Buildings: 10000 m<sup>2</sup></li><li>Steelwork: 15000 tones</li><li>Tanks: 5000 tones</li><li>Mechanical Equipment: 8700 tones</li><li>Piping: 13700 tones</li><li>Pipelines: 20900 m</li><li>Cabling: 2000 km</li><li>Painting: 360000 m<sup>2</sup></li></ul>","text_promotion":""},{"id":120,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0006_323.jpg","project_type":{"title":"Topside / Offshore Platform & Modules","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-topside.png"},"project_status":"Completed","project_location":"Brazil","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0006_323.jpg"],"photo_promotion":"None","commence":"21-06-2010","complete":"25-09-2012","title":"Petrobras Offshore Platform Module Fabrication - 1","slug":"petrobras-offshore-platform-module-fabrication-1","job_no":"323","portion":100.0,"client":"DASS Trading C.V.","latitude":-19.233874,"longitude":-40.073474,"contractor":"QUIP","description":"<p>As the scope of Tekfen, structural steels of process modules for P58, P62 and P63 FPSO Platforms to be installed at Parque das Baleias, Roncador and Papa Terra Offshore Oil Fields in Brazil, have been fabricated. In addition, fabrications of Topside Deck Panel for Submersible Platform P55 at Roncador Field have been performed. Deck segments fabricated in Ceyhan Steel Factory, have been transported to Iskenderun Port by means of special vehicles, and their assembly have been performed over there at the port. Totally, 12 process modules, of 11.000 tons in weight, have been fabricated and handed over to customer within the scheduled time. The Weight of the completed modules changes between 130 and 620 tons. Dimensions of the biggest module was; W: 29 x L: 20,8 x H: 9,2 m, and the weight was 620 tons.</p>","text_promotion":""},{"id":121,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0005_328.jpg","project_type":{"title":"Topside / Offshore Platform & Modules","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-topside.png"},"project_status":"Completed","project_location":"Brazil","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0005_328.jpg"],"photo_promotion":"None","commence":"04-04-2011","complete":"26-09-2011","title":"Petrobras Offshore Platform Module Fabrication - 2","slug":"petrobras-offshore-platform-module-fabrication-2","job_no":"328","portion":100.0,"client":"Petrobras","latitude":-19.233874,"longitude":-40.073474,"contractor":"UTC","description":"<p>As the scope of Tekfen, structural steels of process modules for P58 and P62 FPSO Platforms to be installed at Parque das Baleias and Roncador Offshore Oil Fields in Brazil, have been fabricated. Deck segments fabricated in Ceyhan Steel Factory, have been transported to Iskenderun Port by means of special vehicles, and their assembly have been performed over there at the port. Totally, 14 process modules, of 4.000 tons in weight, have been fabricated and handed over to customer within the scheduled time. The Weight of the completed modules changes between 174 and 400 tons. Dimensions of the biggest module was; W: 30,6 x L: 22,7 x H: 6,2 m, and the weight was 400 tons.</p>","text_promotion":""},{"id":122,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0004_331_cCn8FAq.jpg","project_type":{"title":"Topside / Offshore Platform & Modules","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-topside.png"},"project_status":"Completed","project_location":"Brazil","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0004_331_cCn8FAq.jpg"],"photo_promotion":"None","commence":"20-09-2011","complete":"30-01-2012","title":"Petrobras Offshore Platform Module Fabrication - 3","slug":"petrobras-offshore-platform-module-fabrication-3","job_no":"331","portion":100.0,"client":"Petrobras","latitude":-19.233874,"longitude":-40.073474,"contractor":"ABB","description":"<p>As the scope of Tekfen, structural steels of E-House process modules for P58, P62 and P63 FPSO Platforms to be installed at Parque das Baleias and Roncador Offshore Oil Fields in Brazil have been fabricated. Deck segments fabricated in Ceyhan Steel Factory, have been transported to Iskenderun Port by means of special vehicles, and their assembly have been performed over there at the port. Two E-House modules, of 1.000 tons in weight, have been fabricated and handed over to customer within the scheduled time. The Weight of the completed modules 470 and 530 tons, and dimensions of the modules were; W: 27,9 x L: 21,3 x H: 10,5 meter.</p>","text_promotion":""},{"id":123,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0003_220_WcaFz1N.jpg","project_type":{"title":"Terminal","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-terminal.png"},"project_status":"Completed","project_location":"Georgia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/220-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/220-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/220-3.jpg"],"photo_promotion":"None","commence":"27-10-1997","complete":"26-03-1999","title":"Mechanical, Electrical, Piping And Instrumentation Works In Supsa Terminal","slug":"mechanical-electrical-piping-and-instrumentation-works-supsa-terminal","job_no":"220","portion":50.0,"client":"Georgian Pipeline Company","latitude":42.044089,"longitude":41.805156,"contractor":"Tekfen Construction and Installation Co., Inc. - Azfen J.V. Alliance","description":"<p>Mechanical, piping, electrical and instrumentation works at the export end of the Baku - Supsa Crude Oil Pipeline at Supsa Terminal. The scheme is part of the Azerbaijan Early Oil Transportation Project of Azerbaijan International Operating Company, AIOC; the Georgian section of the scheme is under the responsibility of GPC / Georgian Pipeline Company.</p><p></p><p><b>QUANTITIES</b></p><ul><li>Fabrication of 350 t pipes (diameters varying between 1/2” and 48”)</li><li>Pipe Erection: 650 t</li><li>Blasting &amp; Painting: 7.400 m<sup>2</sup></li><li>Erection: 70 t</li><li>Equipment Erection: 150 t</li><li>Insulation: 600 m2</li><li>Heat Tracing: 600 m</li><li>Earthing: 9.500 m</li><li>Electrical Cabling: 57.000 m</li><li>Instrumentation Cabling: 19.700 m</li><li>Fire &amp; Safety Cabling: 27.600 m</li><li>Cable Terminations: 10.000</li><li>Instrument Installation: 180</li><li>Cathodic Protection System consisting of 6.000 m Cabling, 150 Anodes, 150 Thermo-welding<br/></li></ul><p>The project was successfully delivered by Tekfen - Azfen Alliance within schedule and complying with the highest international standards.</p>","text_promotion":""},{"id":124,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0002_62.jpg","project_type":{"title":"Terminal","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-terminal.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0002_62.jpg"],"photo_promotion":"None","commence":"21-12-1974","complete":"22-05-1977","title":"Marine Terminal For Iraq - Turkey Crude Oil Pipeline","slug":"marine-terminal-iraq-turkey-crude-oil-pipeline","job_no":"62","portion":25.0,"client":"BOTAŞ, Petroleum Pipelines Corporation","latitude":36.767434,"longitude":35.729936,"contractor":"Tekfen Construction and Installation Co., Inc. and Overseas Construction Company Consortium - Ballast Turkey B.V. J.V.","description":"<p>Iraq crude oil is transported to Turkey by a pipeline terminating at Ceyhan / Yumurtalık Port on the Mediterranean Coast.<br/></p><p>The scope of the terminal project covered construction of a small craft harbour and an approach jetty of approximately 2 km with 2 loading platforms where up to 4 tankers, ranging from 15.000 DWT to 300.000 DWT can be berthed.<br/></p><p>All piping, mechanical and electrical installations, such as metering units, loading arms, electrical panels and related instrumentation were also included within the Project’s scope.<br/></p><p>Erection of 2 diesel generators, 2 x 1000 kVA 6,3 / 0,4 kVA substations, high and medium voltage power and control panels, 300 km cabling, 40 km conduit piping, cathodic protection of jetty piles and installation of ex-proof lighting and navigation systems were successfully undertaken under this scheme.</p>","text_promotion":null},{"id":125,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0001_139_vdiLF0u.jpg","project_type":{"title":"Terminal","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-terminal.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0001_139_vdiLF0u.jpg"],"photo_promotion":"None","commence":"27-05-1986","complete":"14-11-1989","title":"İzmir Refinery New Crude Oil Off-loading Marine Terminal Facilities","slug":"izmir-refinery-new-crude-oil-off-loading-marine-terminal-facilities","job_no":"139","portion":100.0,"client":"TÜPRAŞ, Turkish Petroleum Refineries Co., Inc.","latitude":38.797929,"longitude":26.970973,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Construction of a 1.200 m jetty with berthing capacity of 250.000 DWT for crude oil loading / off-loading facilities and one 120 m long smaller jetty. The main jetty is erected on 136 x 24” and 211 x 40” steel piles with a length of 4.924 m.<br/></p><p>The project also includes concrete works, steel fabrication, dredging and excavation works.<br/></p><p>Tekfen was responsible for construction works while procurement was directly undertaken by the client.<br/></p><p>Total value of the project including procurement of the equipment and materials reached US$ 40 Million.</p><p></p><p>Materials and equipment supplied by the client are:</p><ul><li>Product pipe material; jetty pipes,</li><li>Berthing Dolphins,</li><li>Breasting Dolphins,</li><li>Fire Fighting Systems,</li><li>Navigation and Lighting Systems,</li><li>Unloading arms, auxiliary systems and automatic &amp; telemetric control systems.</li></ul>","text_promotion":""},{"id":126,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/terminal_0000_276.jpg","project_type":{"title":"Terminal","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-terminal.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/276-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/276-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/276-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/276-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/276-5.jpg"],"photo_promotion":"None","commence":"20-09-2002","complete":"30-06-2006","title":"Baku - Tbilisi - Ceyhan (Btc) Marine Terminal","slug":"baku-tbilisi-ceyhan-btc-marine-terminal","job_no":"276, 277","portion":100.0,"client":"BTC Co. (BP)","latitude":36.919823,"longitude":35.987777,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Scope of the project was construction of a Crude Oil Export Terminal at Ceyhan, on Turkey’s south-eastern Mediterranean Coast. The terminal was designed to serve as the storage and export (marine vessel loading) facilities of the 1.760 km long Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline System which crosses three countries; Azerbaijan, Georgia and Turkey before reaching Ceyhan, the export terminal. BTC Pipeline System is designed to transport Azeri crude oil to the Mediterranean. BTC Co. has been the Client of Tekfen Construction and Installation Co., Inc. The total investment of the mentioned pipeline scheme in three countries exceeded US$ 3 Billion.<br/></p><p>Tekfen Construction and Installation Co., Inc.’s scope covered detailed engineering, procurement of some major equipment and construction works for both onshore and offshore terminal facilities. Tekfen Engineering Co., Inc. worked with Tekfen Construction and Installation Co., Inc., in prepering the detailed engineering works.<br/></p><p><b>The Onshore Project Scope;</b></p><ul><li>Earthworks, including roads, tank foundations and offshore causeway construction,</li><li>Construction of access roads,</li><li>Procurement, prefabrication and erection of 7 x 150.000 m<sup>3</sup> (950.000 bbls) floating roof tanks for crude oil storage (dia 100 m, height 20 m each) and 1 x 11.100 m<sup>3</sup> (70.000 bbls) internal floating roof relief tank,</li><li>Piping works (mainly 2x42&quot; dia for crude oil, 30&quot;/24&quot; dia for fire water, 6&quot; dia for flushing, 6&quot; dia for fire fighting foam, 4&quot; dia for service water and 4&quot; dia for potable water),</li><li>Oil receiving facilities (process equipment, fire fighting station, laboratory, substation),</li><li>Erection of metering station and VOC incineration plant,</li><li>Design, procurement and installation of Wax Handling Facilities,</li><li>Procurement and installation of Potable &amp; Waste Water Treatment Facilities,</li><li>Construction of water reservoirs with 500 m<sup>3</sup> and 200 m<sup>3</sup> capacities,</li><li>Construction of housing compound facilities (6 buildings),</li><li>Construction of general facilities (6 buildings),</li><li>Construction of guard houses (3 buildings),</li><li>Electrical and instrumentation works,</li><li>Procurement and installation of control and supervisory sytems (CCTV, fire alarm, intrusion detection),</li><li>Infrastructure for all facilities, water transmission pipeline system to the terminal,</li><li>Procurement and installation of oily water seperation system,</li><li>Fire fighting system comprising two 6.000 lt fire trucks, foam extinguishing of rim fire for all tanks, cooling water system for all tanks, 3 Battler monitors for full-surface fire, distributed fire hydrants.</li></ul><p><b>The Offshore Project Scope;</b></p><ul><li>Construction of 2,6 km long jetty structure, presently the longest in Turkey, (with 496 e.a. permanent 60&quot; jetty piles) with a capacity to serve 2 vessels up to 300.000 DWT,</li><li>Construction of 366 m long causeway,</li><li>Construction of the jetty control building on a seperate platform</li><li>Construction and installation of jetty fire water replenishing pump station on seperate platform,</li><li>Construction and installation of jetty loading platform with 6 crude oil loading arms with a total capacity of 120.000 barrels/hr and 2 Vapour Handling Arms, all having emergency release facility.</li><li>Construction of 9 mooring dolphins,</li><li>Construction of 4 breasting dolphins,</li><li>Piping works (2x42&quot; dia. crude oil, 1x30 dia-20&quot; dia fire water, 1x24&quot; dia VOC, 6 inch.dia flush, 6&quot; dia foam, 4&quot; dia service water, 4&quot; dia potable water),</li><li>Procurement and installation of control and supervisory sytems (closed circuit TV, fire alarm, intrusion detection),</li><li>Procurement and installation of fender systems,</li><li>Procurement and installation of 2 access gangways with cranes,</li><li>Procurement and installation of 2 fire fighting monitor towers,</li><li>Procurement and installation of remote controlled fire extinguishing and excape way cooling system,</li><li>Procurement and installation of fully automated quick release mooring hooks coupled with remote berthing aid system for each berth,</li><li>Procurement and installation of oily water seperation system on loading platform.</li></ul><p></p><p><b>HIGHLIGHTS</b></p><ul><li>Concrete Works: 69.000 m<sup>3</sup> (33.000 m<sup>3</sup> Onshore, 36.000 m<sup>3</sup> Offshore Facilities)</li><li>Reinforcing Steel Works: 6.800 t (2.200 t Onshore, 4.600 t Offshore Facilities)</li><li>Structural Steel Works: 2.350 t (350 t Onshore, 2.000 t Offshore Facilities)</li><li>Steel Plates (Storage Tanks): 20.000 t</li><li>Pile Works: 29.000 m, 496 e.a.</li></ul>","text_promotion":""},{"id":127,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/187-kapak.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Russian Federation","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/187-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/187-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/187-4.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/187-5.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/187-7.jpg"],"photo_promotion":"None","commence":"10-02-1993","complete":"30-06-1995","title":"Tschernoretschje, Samara, Military Housing","slug":"tschernoretschje-samara-military-housing","job_no":"187","portion":100.0,"client":"Ministry of Defence, Russian Federation","latitude":53.206474,"longitude":50.161931,"contractor":"Tekfen Construction and Installation Co., Inc. - Hallesche Mitteldeutsche Bau A.G.* J.V.  *(HMB, Germany is a Tekfen affiliate)","description":"<p>Samara, the location of the Tschernoretschje Housing Project, is an industrial city situated in Urals region, about 1.000 km east of Moscow.</p><p></p><p>According to the Unification Treaty of Former East and West Germany on July 1, 1990, signed between the Russian Federation and the Federal German Government, it had been decided that 100 thousand Russian soldiers based in the former East Germany should be returning to Russia. The Federal German Government would undertake the financing of the housing projects to be constructed for these soldiers and their families and issue tenders for construction of satellite towns at locations all over Russia.</p><p></p><p>Tekfen Construction and Installation Co., Inc. - Hallesche Mitteldeutsche Bau A.G. J.V. was awarded the Tschernoretschje, Samara Project, one of the biggest in this scheme. The engineering works were undertaken by Tekfen Engineering Co., Inc. During the realization of the project, peak manpower reached 6500 and 75 Turkish and foreign subcontractors rendered their services.</p><p></p><p>The scope of the project covered construction of:<br/></p><ul><li>6 different type of flats with net usable areas between 45 m<sup>2</sup> and 90 m<sup>2</sup>,</li><li>The buildings are constructed with the industrial form technology (tunnel shape) with pre-fabricated facade insulation elements,</li><li>1.910 flats in 149 apartment buildings gathered in 24 blocks with a total construction area of 202.000 m<sup>2</sup>,</li><li>2 day care centers each having 330 children capacity with a total construction area of 14.000 m<sup>2</sup>,</li><li>A two flat shopping center with 10.500 m<sup>2</sup> construction area,</li><li>A hospital with 200 bed capacity and 27.830 m<sup>2</sup> construction area; main building with patient rooms, out-patient department of 200 patients / day capacity, surgery and diagnosis department including eye surgery, intensive-care center, infections disease, gynocology, x-ray, pediatrics and pharmacy departments, also as separate buildings,</li><li>School with 44 classrooms, 6 laboratories, 2 gymnasiums and an auditorium with 17.000 m<sup>2</sup> construction area,</li><li>Hotel building with 12.000 m<sup>2</sup> construction area and 350 beds capacity,</li><li>Restaurant building having the capacity to serve 300 people at a time, with 5.500 m<sup>2</sup> construction area,</li><li>Sports Complex with 2 swimming pools, saunas, one multipurpose gymnasium and sports education facilities with a construction area of 8.000 m<sup>2</sup>,</li><li>Bakery having a capacity of 20 t / day with 4.800 m<sup>2</sup> construction area,</li><li>Service building having several shops for daily needs, such as barbershop, tailor and chemist with a net usable area of 4.000 m<sup>2</sup>,</li><li>Cultural and arts center having a theatre with 800 seats, a conference room with 150 seats, several auditoriums and arts education / training facilities with a construction area of 9.000 m<sup>2</sup>,</li><li>Office building for the municipality, bank, post office and similar services with a construction area of 5.800 m<sup>2</sup>,</li><li>Laundry with 2 t / day capacity, bath facility with 200 people capacity and six saunas all gathered in a building with a construction area of 3.000 m<sup>2</sup>,</li><li>Natural gas / diesel oil central heating plant having 106 MW capacity with a construction area of 2.500 m<sup>2</sup>.<br/></li></ul><p>The bulk material for civil works were sourced locally, as far as they were in compliance with the project specifications and readily available. Rebars, cement and similar items were procured from various sources in Russia while paints, insulation and vitrified material were imported mainly from Turkey and European countries.</p><p></p><p><b>FACTS</b><br/></p><ul><li>Total Construction Area: 202.000 m<sup>2</sup></li><li>Social Facilities: 120.000 m<sup>2</sup></li><li>Waste Water Treatment Plant: 6.000 m<sup>3</sup> / day (for 50.000 people)</li><li>Pump Station PS2: 8.000 m<sup>3</sup> / day</li><li>Pump Station PS3: 525 m<sup>3</sup> / day</li><li>Natural Gas Pipeline Distribution System: 11 km</li><li>Transmission Lines: 110kV, 35 kV and 10 kV</li><li>Substation Center: 110 / 35 / 10 kV, 2x10 MVA</li><li>Heating Center: 106 MW<br/></li></ul><p><b>ON - SITE INFRASTRUCTURE WORKS</b><br/></p><ul><li>Landscaping: 45.000 m<sup>2</sup></li><li>Waste Water: 7.600 m</li><li>Tap Water: 7.200 m</li><li>Rain Water: 8.500 m</li><li>Hot Water and Heating System: 19.000 m</li><li>Electrical System Cabling: 40.000 m</li><li>Telephone System Cabling: 11.000 m</li><li>Pedestrian Roads: 21.000 m<br/></li></ul><p><b>OFF - SITE INFRASTRUCTURE WORKS</b><br/></p><p>Off - site Infrastructure Works consists of the drinking water system with four underground water reservoirs and two pump stations, power supply system, roads and one treatment system.<br/></p><p><b>Drinking Water System:</b><br/>11 wells, 20-30 m deep, are drilled at a distance of around 20 km from the site, complete with pumps and pump buildings. Drinking water supplied from these wells is carried by a twin pipeline system of 20 km x DN 300. Approximately 800.000 m3 earth filling is accomplished for the construction of an 8 km long road to the location of the wells. The capacity of the pump station PS2, with 2 x 1.500 m<sup>3</sup> underground concrete reservoirs, is 8.000 m<sup>3</sup> / day. The pump station PS3, with maximum capacity of 525 m<sup>3</sup> / hr in case of fire, has also 2 x 1.500 m<sup>3</sup> underground concrete reservoirs.<br/></p><p><b>Power Supply, Transmission Lines and Substations:</b><br/>Construction and erection of transmission lines (110 kV, 35 kV and 10 kV) with a total length of 80 km, a substation center (110 / 35 / 10 kV, 2 x 10 MVA) at Spiridonowka, a substation (35 / 10 kV, 2 x 10 MVA) at Tschernoretchje and 15 substations (2 x 10 MVA) are completed within the scope of the project.<br/></p><p><b>Treatment System:</b><br/>The treatment system, which is designed for a town of 35.000 habitants, has a capacity of 6.000 m<sup>3</sup> / day and the plant process is based on active sludge technic.<br/></p><p>The treatment system consists of the following units; a pre-treatment unit, sand and grease trap, aeration tanks (7.000 m<sup>3</sup>), clarifiers (2.900 m<sup>3</sup>), thickener, post treatment filter, chlorination, contact tank, sludge drying beds (8.000 m<sup>2</sup>), sludge post-aerisation.</p>","text_promotion":""},{"id":128,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/145-kapak.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/145-1.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/145-2.jpg"],"photo_promotion":"None","commence":"21-03-1988","complete":"29-03-1998","title":"Sinanoba Satellite Town","slug":"sinanoba-satellite-town","job_no":"145, 174","portion":100.0,"client":"Tekfen Construction and Installation Co., Inc. - Türkiye Emlak Bankası Co., Inc. J.V.","latitude":40.99486,"longitude":28.53839,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>The Project comprises of infrastructure and superstructure works of a satellite town located at an area approximately 30 km south-west of Istanbul. Construction of 3.215 apartments, 147 villas and 4 shopping centers were undertaken and successfully accomplished by Tekfen within the schedule in compliance with the highest standards.</p><p></p><p><b>SUPERSTRUCTURE</b></p><ul><li>167 Apartment Blocks,</li><li>3.215 Apartments of different sizes,</li><li>147 Villas,</li><li>4 Shopping Centers.<br/></li></ul><p>The total superstructure area is 575.000 m<sup>2</sup>.<br/></p><p><b>INFRASTRUCTURE</b></p><ul><li>Landscape and related works (97.250 m<sup>2</sup>),</li><li>In-site and peripheral roads (2.380 m),</li><li>Parking area (8.300 m<sup>2</sup>),</li><li>Potable water and sewerage network,</li><li>Potable water distribution line (2.515 m),</li><li>Power distribution center,</li><li>Medium voltage network (2.660 m),</li><li>Transformers (7 units),</li><li>Telecommunication network,</li><li>Biological Treatment Plant (10.000 people capacity),</li><li>Sea filling and rock-fill (367.000 m<sup>3</sup> filling for reclaimed land on sea; 120.000 t of stone &amp; rock used for 1.600 m rock-fill).</li></ul>","text_promotion":""},{"id":129,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/157-kapak.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/157-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/157-3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/157-1.jpg"],"photo_promotion":"None","commence":"11-09-1991","complete":"31-12-1995","title":"Ataşehir Satellite Town","slug":"atasehir-satellite-town","job_no":"157, 184, 188","portion":100.0,"client":"Türkiye Emlak Bankası Co., Inc.","latitude":40.983107,"longitude":29.127244,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Ataşehir Satellite Town is a new development area on the Asian part of İstanbul. Tekfen undertook and successfully completed the construction of 1.775 flats in 6 to 8 storey high 83 apartment blocks, a shopping center, a 21 storey office and residential building together with infrastructure works and landscaping.<br/></p><p>Total construction area is 284.000 m<sup>2</sup>.<br/></p><p><b>OFFICE BLOCK</b></p><p>The project also includes a high rise, called office block, constructed by Tekfen. The building consists of 17 office floors, 1 entrance / reception floor, 3 parking floors and a heating center. The residential part of the 21 storey building consists of 73 apartment units, 3 basement floors, a heating center and shelters.<br/></p><p><b>MAIN QUANTITIES</b></p><ul><li>Excavation: 100.000 m<sup>3</sup></li><li>Reinforced Concrete: 110.000 m<sup>3</sup></li><li>Precast Concrete: 100.000 m<sup>3</sup></li><li>Reinforcing Steel: 9.000 t</li><li>Landscaping: 82.000 m<sup>2</sup></li><li>Tiles: 200.000 m<sup>2</sup></li><li>Aluminium Suspended Ceiling: 22.000 m<sup>2</sup></li><li>Windows / Doors: 62.000 m<sup>2</sup></li></ul>","text_promotion":""},{"id":130,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/real-estate_0006_akmerkez-1_cz3Feym.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/akmerkez-2.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/real-estate_0006_akmerkez-1_cz3Feym.jpg","commence":"01-01-1991","complete":"01-04-1993","title":"Akmerkez","slug":"akmerkez","job_no":"1","portion":100.0,"client":"Tekfen Real Estate","latitude":41.07731,"longitude":29.025302,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p><b>ABOUT US</b></p><p>Since the day it was founded, Tekfen never changed its principle of “Doing in the best way possible what it knows best,” and founded the Tekfen Real Estate Group in 2000 with the aim of creating high-quality innovative projects direly needed in the real estate industry.</p><p>The brand values of the Tekfen Real Estate Development are quality, trust, sustainability, environmental awareness, and functionality; it combines these values with its unique approach to develop real estate projects at international standards. Tekfen Real Estate Development has implemented projects that blend in with the urban fabric, add value to the city, create a difference with their concept, and improve the quality of life of the dwellers.</p><p>Tekfen Real Estate Development has merged with Tekfen İnşaat ve Tesisat A.Ş. as of 9<sup>th</sup> February 2019. From this date the company continues its activities under the name of Tekfen İnşaat ve Tesisat A.Ş.</p><p></p><p><b>DESIGNED TO PROTECT THE ENVIRONMENT</b></p><p>Tekfen Real Estate Development stands out with its projects that create a difference with their concepts during the development period, integrate well with the urban fabric, and focus on sustainability all stages, from design to management.</p><p>Tekfen Real Estate Development has emphasized sustainability and energy efficiency in all the projects it has developed since 2000, receiving the LEED Gold Certificate given by the US Green Building Council (USGBC) for Levent Office, Kağıthane OfficePark, and Tekfen Bomonti Apartments and HEP İstanbul, the very first green projects of Turkey.</p><p>Tekfen Real Estate Development is among the founding members of ÇEDBİK (Environmentally Friendly Buildings Council of Turkey) established in 2007.</p><p></p><p><b>AKMERKEZ</b></p><p>Tekfen is a partner of and takes part in the management of Akmerkez, which is not only a shopping mall but also features two office and one residence building. The project was completed in 1993 and won countless national and international awards, marking it as one of the best real estate projects developed in Turkey.</p><p>In April 2005, Akmerkez was turned into an investment partnership and went public.</p><p></p>","text_promotion":""},{"id":131,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/real-estate_0005_bomonti-1_MLOE00I.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/bomonti-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/bomonti-3.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/real-estate_0005_bomonti-1_cu67nmS.jpg","commence":"01-02-2012","complete":"04-07-2012","title":"Bomonti Apartments","slug":"bomonti-apartments","job_no":"1","portion":100.0,"client":"Tekfen Real Estate Development","latitude":41.059099,"longitude":28.982868,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p><b>ABOUT US</b></p><p>Since the day it was founded, Tekfen never changed its principle of “Doing in the best way possible what it knows best,” and founded the Tekfen Real Estate Group in 2000 with the aim of creating high-quality innovative projects direly needed in the real estate industry.</p><p>The brand values of the Tekfen Real Estate Development are quality, trust, sustainability, environmental awareness, and functionality; it combines these values with its unique approach to develop real estate projects at international standards. Tekfen Real Estate Development has implemented projects that blend in with the urban fabric, add value to the city, create a difference with their concept, and improve the quality of life of the dwellers.</p><p>Tekfen Real Estate Development has merged with Tekfen İnşaat ve Tesisat A.Ş. as of 9<sup>th</sup> February 2019. From this date the company continues its activities under the name of Tekfen İnşaat ve Tesisat A.Ş.</p><p></p><p><b>DESIGNED TO PROTECT THE ENVIRONMENT</b></p><p>Tekfen Real Estate Development stands out with its projects that create a difference with their concepts during the development period, integrate well with the urban fabric, and focus on sustainability all stages, from design to management.</p><p>Tekfen Real Estate Development has emphasized sustainability and energy efficiency in all the projects it has developed since 2000, receiving the LEED Gold Certificate given by the US Green Building Council (USGBC) for Levent Office, Kağıthane OfficePark, and Tekfen Bomonti Apartments and HEP İstanbul, the very first green projects of Turkey.</p><p>Tekfen Real Estate Development is among the founding members of ÇEDBİK (Environmentally Friendly Buildings Council of Turkey) established in 2007.</p><p></p><p><b>BOMONTI APARTMENTS</b></p><p>Bomonti Apartments is located in historical Bomonti, one of Istanbul’s highly cosmopolitan areas. The housing project blends in with the unique fabric of the neighborhood while also meeting the requirements of modern architecture.</p><p>With its low-rise buildings around a central courtyard and its strong architectural identity that is reminiscent of the Bauhaus movement, the project is Bomonti’s new and modern face; its concept design was created by Bünyamin Derman (db Architecture), and interior concept design by Mustafa Toner (Toner Architecture).</p><p>Compliant with environmentally friendly green building standards, the project received the LEED Certificate from the US Green Buildings Council (USGBC).</p>","text_promotion":""},{"id":132,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/real-estate_0004_hep_0wZTDIY.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/hep2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/hep3.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/real-estate_0004_hep_dj1LpTz.jpg","commence":"01-07-2017","complete":"17-07-2017","title":"HEP Istanbul","slug":"hep-istanbul","job_no":"1","portion":100.0,"client":"Tekfen Real Estate Development","latitude":41.008596,"longitude":28.681431,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p><b>ABOUT US</b></p><p>Since the day it was founded, Tekfen never changed its principle of “Doing in the best way possible what it knows best,” and founded the Tekfen Real Estate Group in 2000 with the aim of creating high-quality innovative projects direly needed in the real estate industry.</p><p>The brand values of the Tekfen Real Estate Development are quality, trust, sustainability, environmental awareness, and functionality; it combines these values with its unique approach to develop real estate projects at international standards. Tekfen Real Estate Development has implemented projects that blend in with the urban fabric, add value to the city, create a difference with their concept, and improve the quality of life of the dwellers.</p><p>Tekfen Real Estate Development has merged with Tekfen İnşaat ve Tesisat A.Ş. as of 9<sup>th</sup> February 2019. From this date the company continues its activities under the name of Tekfen İnşaat ve Tesisat A.Ş.</p><p></p><p><b>DESIGNED TO PROTECT THE ENVIRONMENT</b></p><p>Tekfen Real Estate Development stands out with its projects that create a difference with their concepts during the development period, integrate well with the urban fabric, and focus on sustainability all stages, from design to management.</p><p>Tekfen Real Estate Development has emphasized sustainability and energy efficiency in all the projects it has developed since 2000, receiving the LEED Gold Certificate given by the US Green Building Council (USGBC) for Levent Office, Kağıthane OfficePark, and Tekfen Bomonti Apartments and HEP İstanbul, the very first green projects of Turkey.</p><p>Tekfen Real Estate Development is among the founding members of ÇEDBİK (Environmentally Friendly Buildings Council of Turkey) established in 2007.</p><p></p><p><b>HEP ISTANBUL</b></p><p>HEP Istanbul is a big-scale housing project located at the intersection of the Avcılar, Beylikdüzü, and Esenyurt districts in the vicinity of the city’s airport on the European side, built with the aim of creating a multifaceted living space that is more than just a housing.</p><p>The concept and architectural design of the project was created by Cem Sorguç (CM Architecture), where the borders between outdoor and indoor spaces are visually and practically flexible. The project did not aim to be a self-enclosed sprawl, designed instead as a project that allows for neighbourly relations.</p><p>Built in compliance with environmentally friendly green building standards, the project is the first of its kind in the area to receive the LEED Certificate given by the US Green Buildings Council (USGBC) in the housing category.</p>","text_promotion":""},{"id":133,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/real-estate_0003_ofispark_ZA5MgMK.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/ofispark3.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/ofispark2.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/real-estate_0003_ofispark_ZA5MgMK.jpg","commence":"11-07-2012","complete":"09-08-2012","title":"Kağıthane Officepark","slug":"kagithane-officepark","job_no":"1","portion":100.0,"client":"Tekfen Real Estate Development","latitude":41.084871,"longitude":28.973609,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p><b>ABOUT US</b></p><p>Since the day it was founded, Tekfen never changed its principle of “Doing in the best way possible what it knows best,” and founded the Tekfen Real Estate Group in 2000 with the aim of creating high-quality innovative projects direly needed in the real estate industry.</p><p>The brand values of the Tekfen Real Estate Development are quality, trust, sustainability, environmental awareness, and functionality; it combines these values with its unique approach to develop real estate projects at international standards. Tekfen Real Estate Development has implemented projects that blend in with the urban fabric, add value to the city, create a difference with their concept, and improve the quality of life of the dwellers.</p><p>Tekfen Real Estate Development has merged with Tekfen İnşaat ve Tesisat A.Ş. as of 9<sup>th</sup> February 2019. From this date the company continues its activities under the name of Tekfen İnşaat ve Tesisat A.Ş.</p><p></p><p><b>DESIGNED TO PROTECT THE ENVIRONMENT</b></p><p>Tekfen Real Estate Development stands out with its projects that create a difference with their concepts during the development period, integrate well with the urban fabric, and focus on sustainability all stages, from design to management.</p><p>Tekfen Real Estate Development has emphasized sustainability and energy efficiency in all the projects it has developed since 2000, receiving the LEED Gold Certificate given by the US Green Building Council (USGBC) for Levent Office, Kağıthane OfficePark, and Tekfen Bomonti Apartments and HEP İstanbul, the very first green projects of Turkey.</p><p>Tekfen Real Estate Development is among the founding members of ÇEDBİK (Environmentally Friendly Buildings Council of Turkey) established in 2007.</p><p></p><p><b>KAĞITHANE OFFICEPARK</b></p><p>Istanbul’s first green office park project, Tekfen Kağıthane Office-Park is in the centrally located district of Kağıthane, an area with a fast developing transportation infrastructure.</p><p>Emre Arolat (EAA Mimarlık) created the concept and architectural design for the project, which set out to be a modern take on the current fabric of the area.</p><p>Spread around a central courtyard, the offices were supplemented by shops, cafés, and social areas. Kağıthane Office-Park is one of the few projects in Turkey that boasts with a LEED Gold certificate in the Core&amp;Shell category given by the US Green Buildings Council (USGBC). It has also received the office project award at the MIPIM Architectural Review Future Project Awards in 2009 and the award of appreciation in the office category at the European Commercial Property Awards in 2010 presented to projects in the European real estate market.</p><p>Kağıthane Office-Park was the recipient of the Construction Award at the 13th National Architecture Awards by the architectural magazine Arkitera.</p>","text_promotion":""},{"id":134,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/real-estate_0002_leventofis_xLH4fT7.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/leventofispark2.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/real-estate_0002_leventofis_xLH4fT7.jpg","commence":"01-07-2010","complete":"01-07-2010","title":"Levent Office","slug":"levent-office","job_no":"1","portion":100.0,"client":"Tekfen Real Estate Devepolment","latitude":41.079415,"longitude":29.009309,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p><b>ABOUT US</b></p><p>Since the day it was founded, Tekfen never changed its principle of “Doing in the best way possible what it knows best,” and founded the Tekfen Real Estate Group in 2000 with the aim of creating high-quality innovative projects direly needed in the real estate industry.</p><p>The brand values of the Tekfen Real Estate Development are quality, trust, sustainability, environmental awareness, and functionality; it combines these values with its unique approach to develop real estate projects at international standards. Tekfen Real Estate Development has implemented projects that blend in with the urban fabric, add value to the city, create a difference with their concept, and improve the quality of life of the dwellers.</p><p>Tekfen Real Estate Development has merged with Tekfen İnşaat ve Tesisat A.Ş. as of 9<sup>th</sup> February 2019. From this date the company continues its activities under the name of Tekfen İnşaat ve Tesisat A.Ş.</p><p></p><p><b>DESIGNED TO PROTECT THE ENVIRONMENT</b></p><p>Tekfen Real Estate Development stands out with its projects that create a difference with their concepts during the development period, integrate well with the urban fabric, and focus on sustainability all stages, from design to management.</p><p>Tekfen Real Estate Development has emphasized sustainability and energy efficiency in all the projects it has developed since 2000, receiving the LEED Gold Certificate given by the US Green Building Council (USGBC) for Levent Office, Kağıthane OfficePark, and Tekfen Bomonti Apartments and HEP İstanbul, the very first green projects of Turkey.</p><p>Tekfen Real Estate Development is among the founding members of ÇEDBİK (Environmentally Friendly Buildings Council of Turkey) established in 2007.</p><p></p><p><b>LEVENT OFFICE</b></p><p>Innovative in its design, construction, and many other aspects, Levent Office is the district’s greenest office project and offers greater comfort as well as efficiency.</p><p>Professor Juan Pablo Molestina (M. Arch., BDA) has created the concept design, while Swanke Hayden Connell Architects (SHCA) has created the architectural design, meeting the criteria set by the LEED Certificate given by the US Green Buildings Council (USGBC).</p><p>Levent Office is the first office building in Turkey to receive the LEED Gold certificate in the Shell&amp;Core category, and was selected as one of three finalists from among 100 projects from 27 countries in the Green Buildings category of the 2011 MIPIM International Real Estate Awards.</p>","text_promotion":""},{"id":135,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/real-estate_0000_yalikavak-1_DyFUtNc.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/yalikavak-2.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/real-estate_0000_yalikavak-1_DyFUtNc.jpg","commence":"04-06-2008","complete":"10-07-2008","title":"Tekfen Yalıkavak Homes","slug":"tekfen-yalikavak-homes","job_no":"1","portion":100.0,"client":"Tekfen Real Estate Development","latitude":37.131936,"longitude":27.313283,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p><b>ABOUT US</b></p><p>Since the day it was founded, Tekfen never changed its principle of “Doing in the best way possible what it knows best,” and founded the Tekfen Real Estate Group in 2000 with the aim of creating high-quality innovative projects direly needed in the real estate industry.</p><p>The brand values of the Tekfen Real Estate Development are quality, trust, sustainability, environmental awareness, and functionality; it combines these values with its unique approach to develop real estate projects at international standards. Tekfen Real Estate Development has implemented projects that blend in with the urban fabric, add value to the city, create a difference with their concept, and improve the quality of life of the dwellers.</p><p>Tekfen Real Estate Development has merged with Tekfen İnşaat ve Tesisat A.Ş. as of 9<sup>th</sup> February 2019. From this date the company continues its activities under the name of Tekfen İnşaat ve Tesisat A.Ş.</p><p></p><p><b>DESIGNED TO PROTECT THE ENVIRONMENT</b></p><p>Tekfen Real Estate Development stands out with its projects that create a difference with their concepts during the development period, integrate well with the urban fabric, and focus on sustainability all stages, from design to management.</p><p>Tekfen Real Estate Development has emphasized sustainability and energy efficiency in all the projects it has developed since 2000, receiving the LEED Gold Certificate given by the US Green Building Council (USGBC) for Levent Office, Kağıthane OfficePark, and Tekfen Bomonti Apartments and HEP İstanbul, the very first green projects of Turkey.</p><p>Tekfen Real Estate Development is among the founding members of ÇEDBİK (Environmentally Friendly Buildings Council of Turkey) established in 2007.</p><p></p><p><b>TEKFEN YALIKAVAK HOMES</b></p><p>Tekfen Yalıkavak Homes is a summer housing project on the Aegean coast, in one of Bodrum’s most beautiful bays, with 86 houses and a 40-room boutique hotel. There is also a swimming pool and a restaurant for the use of hotel guests and house owners.</p><p>The architectural design of Tekfen Yalıkavak Homes was created by Trafo Architecture, and was selected as one of the 7 projects from Turkey to compete in the European Union Prize for Contemporary Architecture - Mies van der Rohe Award. The buildings are managed by Tekfen Services.</p>","text_promotion":""},{"id":136,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/real-estate_0001_taksim-1_THFfA05.jpg","project_type":{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/tekfen-residences-2.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/real-estate_0001_taksim-1_om5nQZY.jpg","commence":"01-06-2006","complete":"01-07-2006","title":"Taksim Residences","slug":"taksim-residences","job_no":"1","portion":100.0,"client":"Tekfen Real Estate Development","latitude":41.042128,"longitude":28.989283,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p><b>ABOUT US</b></p><p>Since the day it was founded, Tekfen never changed its principle of “Doing in the best way possible what it knows best,” and founded the Tekfen Real Estate Group in 2000 with the aim of creating high-quality innovative projects direly needed in the real estate industry.</p><p>The brand values of the Tekfen Real Estate Development are quality, trust, sustainability, environmental awareness, and functionality; it combines these values with its unique approach to develop real estate projects at international standards. Tekfen Real Estate Development has implemented projects that blend in with the urban fabric, add value to the city, create a difference with their concept, and improve the quality of life of the dwellers.</p><p>Tekfen Real Estate Development has merged with Tekfen İnşaat ve Tesisat A.Ş. as of 9<sup>th</sup> February 2019. From this date the company continues its activities under the name of Tekfen İnşaat ve Tesisat A.Ş.</p><p></p><p><b>DESIGNED TO PROTECT THE ENVIRONMENT</b></p><p>Tekfen Real Estate Development stands out with its projects that create a difference with their concepts during the development period, integrate well with the urban fabric, and focus on sustainability all stages, from design to management.</p><p>Tekfen Real Estate Development has emphasized sustainability and energy efficiency in all the projects it has developed since 2000, receiving the LEED Gold Certificate given by the US Green Building Council (USGBC) for Levent Office, Kağıthane OfficePark, and Tekfen Bomonti Apartments and HEP İstanbul, the very first green projects of Turkey.</p><p>Tekfen Real Estate Development is among the founding members of ÇEDBİK (Environmentally Friendly Buildings Council of Turkey) established in 2007.</p><p></p><p><b>TAKSIM RESIDENCES</b></p><p>Taksim Residences is a high-end boutique housing project at the center of the city, made up of three blocks and 59 apartments.</p><p>One of the blocks is the historical building that served as the French Pasteur Hospital until 1991, renovated according to the original plans.</p><p>Taksim Residences is close to all key points in Istanbul, while also offering great comfort to its dwellers with its spacious and manicured garden and an indoor swimming pool suffused by daylight, all carefully managed by Tekfen Services.</p>","text_promotion":""},{"id":149,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/DJI_0136.JPG","project_type":{"title":"Project Management","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-project-management.png"},"project_status":"Completed","project_location":"Azerbaijan","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/DJI_0136.JPG","https://api.tekfeninsaat.com.tr/en/media/original_images/DJI_0106.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/371-2.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/371-1.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/371.jpg","commence":"01-04-2019","complete":"01-06-2023","title":"Project Management & Support Works of Azeri Central East Production Drilling and Quarters Platform (ACE-PDQ)","slug":"project-management-support-works-azeri-central-east-production","job_no":"371","portion":100.0,"client":"AZFEN J.V.","latitude":36.919823,"longitude":35.987777,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>In 2019, the Project awarded and started construction activities in July. These activities continued to ramp up through the year. ACE (Azeri Central East) platform topsides and drilling fabrication activities continued at the Bibi-Heybat fabrication yard. ACE is a new offshore platform and facilities designed to process up to 100,000 barrels of oil per day. The project is expected to produce up to 300 million barrels over its lifetime. The Azeri Central East (ACE) Project is centred on a new 48-slot production, drilling and quarters platform located mid-way between the existing Central Azeri and East Azeri platforms in a water depth of approximately 140 meters. Construction activities took place in-country utilizing local resources. At the peak, construction activities created up to 8,000 jobs. The Project required new infield pipelines to transfer oil and gas from the ACE platform to the existing ACG Phase 2 oil and gas export pipelines for transportation to the onshore Sangachal Terminal. An inter stage draw off from the Gas Injection Compressor provides gas lift for ACE wells. ACE drilling facilities are based on a Mast Equipment Package and Modular Drilling Support Modules, which is a change from previous Azeri-Chirag-Gunashli projects where there is a Drilling Equipment Set with Drilling Support Modules integrated into the topsides design.</p><p><b>FACTS AND FIGURES</b></p><ul><li>Integrated Deck: 13,362 tonnes</li><li>Modular Drilling Support Module : 2,227 tonnes</li><li>Drilling Equipment Set: 2,445 tonnes</li><li>Living Quarters: 1,327 tonnes</li><li>Flare Structure: 206 tonnes</li><li>Temps, First Fill and Drilling: 701 tonnes</li></ul>","text_promotion":""},{"id":141,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/TUPRAS_2107252847.jpg","project_type":{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},"project_status":"Ongoing","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/TUPRAS_2107252847.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/TUPRAS_2107252847.jpg","commence":"01-06-2022","complete":"31-05-2025","title":"TÜPRAŞ - Sulphur Recovery Unit Project of Kirikkale Refinery","slug":"tupras-sulphur-recovery-unit-project-of-the-kirikkale-refinery","job_no":"380","portion":100.0,"client":"TUPRAS, Turkish Petroleum Refineries Co.","latitude":39.75509,"longitude":33.44866,"contractor":"Tekfen Construction and Installation Co., Inc. & HMB (Consortium)","description":"<p>The consortium formed by Tekfen Construction, and its sister company HMB Hallesche Mitteldeutsche Bau AG, has undertaken the building of the Sulphur Recovery Unit at Tüpraş Kırıkkale Refinery, on an EPC (engineering, procurement, construction) basis. Tekfen Construction has extensive experience and competence in realising Engineering, Procurement and Construction (EPC)-based projects.</p><p>TUPRAS Kırıkkale Refinery that has an annual 5.4 million ton crude oil processing capacity , established in 1986 to meet the petroleum demands of the Ankara, Central Anatolia, Eastern Mediterranean and Eastern Black Sea regions, the Kırıkkale Refinery has become a facility with mid-level complexity by Mediterranean standards with the addition of hydrocracker, isomerization, diesel desulphurization and CCR reformer units.</p><p>Project scope consists of engineering, procurement, construction and commissioning, sulphur degassing section with liquid sulphur truck loading, sulphur solidification and solid sulphur storage silos with solid sulphur truck loading, solid sulphur storage area, substation, stack, utilities, sour water, gas, fire water, air, sewage, electrical and instrumentation and other necessary connections to and from the existing refinery required for the integration of the new unit with the existing refinery facilities. Consortium (Tekfen Construction – HMB) scope of work includes all necessary modifications, alterations, relocations, replacement and additions for the existing facilities.</p><p>New SRU unit with a capacity of 130 tons/day will be constructed and with the establismet of &quot;O2 Enrichment Process&quot; that is aimed to increase the previously-mentioned capacity by 25%.</p><p>Worley Nederland B.V. – Jacobs-Comprimo Sulfur Solutions are the technology licensors for the project.<br/></p><p><b>FACTS AND FIGURES</b></p><p><b>The plant consists of following process sections, </b></p><ul><li>Sulphur Recovery Unit (SRU)</li><li>OSBL (offsite integration)</li><li>Sulphur Solidification Unit</li><li>Sulphur Handling Unit</li><li>Sulphur Degassing Section with Liquid Sulphur Truck Loading,</li><li>Solid Sulphur Storage Silos with Solid Sulphur Truck Loading</li><li>New Solid Sulphur Storage Area</li><li>Electrical Substation and Control Panel Building</li></ul><p></p><p><b>The main works and the relevant quantities,</b> </p><ul><li>Excavation: 11,194 m<sup>3</sup></li><li>Backfilling: 6,787 m<sup>3</sup></li><li>Reinforced Concrete: 6,464 m<sup>3</sup></li><li>Structural Steel Fabrication and Erection: 824 t</li><li>Equipment Erection: 917 t</li><li>Piping Fabrication and Erection: 722 t</li><li>Cable Tray Erection: 15,555 m</li><li>Electrical Cable Laying: 73,848 m</li><li>Instrument Cable Laying: 43,820 m</li><li>Fireproofing: 7,054 m<sup>2</sup></li></ul>","text_promotion":""},{"id":142,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/refinerygeneric.png","project_type":{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},"project_status":"Completed","project_location":"Iraq","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/refinerygeneric.png"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/refinerygeneric.png","commence":"01-03-2022","complete":"31-03-2023","title":"Basra Refinery Upgrading Project Civil Structures & Underground Facilities Construction Works","slug":"basrah-refinery-upgrading-project-civil-structures-underground-facilities","job_no":"381","portion":100.0,"client":"JGC, JGC Corporation., Inc","latitude":30.46553,"longitude":47.67087,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>The Client JGC (Japan Gas Corporation), and the project include units such as Liquid Catalytic Cracking Unit, Vacuum Distillation Unit, Diesel Desulfurization Unit, etc. were installed on the land adjacent to the existing Basra refinery in Basra, Iraq, within the scope of modernization works. includes the construction of works.</p><p>Scope of work to be done; Partial material supply, pile head treatment works, sheet piling and, equipment foundation concrete works, manhole, duct bank works, pipe rack foundation concrete works, sleeper concrete works, infrastructure excavation, and piping works belonging to a certain part of the new land, called CV-1 package includes construction and installation works.</p><p><b>FACTS AND FIGURES</b></p><p><b>The main works and the relevant quantities, </b></p><ul><li>Excavation: 51,180.58 m<sup>3</sup></li><li>Backfilling: 48,748.64 m<sup>3</sup></li><li>Concrete Works - Formwork: 39,855.52 m<sup>2</sup></li><li>Concrete Works - Reinforcement: 1,996.2 ton</li><li>Concrete Works - Concrete: 12,352.57 m<sup>3</sup></li><li>Embedded Items: 64,297.91 kg</li><li>Pile Head Treatment: 1,690 pieces</li><li>Pipe Installation: 10,138 m</li><li>Earthing Works: 10,200 m</li></ul>","text_promotion":""},{"id":143,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/2024_Katar_0690.jpg","project_type":{"title":"Oil & Gas Facility","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-oil-gas.png"},"project_status":"Ongoing","project_location":"Qatar","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/2024_Katar_0690.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/2024_Katar_0690.jpg","commence":"05-12-2021","complete":"30-04-2026","title":"North Field East General Works Project","slug":"north-field-east-general-works-project","job_no":"383","portion":100.0,"client":"QATARGAS Operating Company Limited","latitude":25.92103,"longitude":51.52423,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>Qatargas is a global energy operator which operates 14 Liquefied Natural Gas (LNG) trains with a total annual production capacity of 77 million tons per annum (Mtpa). This makes Qatargas the largest LNG producer in the world.</p><p>CTJV, a joint venture between Chiyoda Corporation and Technip Energies, has been awarded a major Engineering, Procurement, Construction and Commissioning (EPCC) contract by Qatargas for the onshore facilities of the North Field East Project (NFE) EPC-1 Package in Ras Laffan Industrial City (RLIC), Qatar.</p><p>This award will cover the delivery of 4 mega trains, each with a capacity of 8 Mtpa of LNG, and associated utility facilities. It will include a large CO2 Carbon Capture and Sequestration facility, leading to more than 25% reduction of Green House Gas emissions when compared to similar LNG facilities.</p><p>The new facilities will receive approximately 6 billion standard cubic feet per day of feed gas from the Eastern sector of Qatar’s North Field, which is the largest non-associated gas field in the world. The expansion project will produce approximately 33 Mtpa of additional LNG, increasing Qatar’s total production from 77 to 110 Mtpa.</p><p>TEKFEN has been awarded a contract with an amount of 448 million USD from CTJV for General Works for Offsites 2 of the North Field East Onshore Project EPC-1 Package. Contract includes the execution of all Construction Works for Civil Works, Piping Fabrication and Erection works, Painting and Insulation Works, Steel Structure Erection, Mechanical Erection, Electrical and Instruments Installation and Pre-commissioning activities.</p><p></p><p><b>FACTS AND FIGURES</b></p><p><b>The scope consists of following areas &amp; units, </b></p><ul><li>Inlet Facilities</li><li>Sour Water Treatment Area </li><li>Oily Water Treatment Area </li><li>Waste Recycle Reduction Area </li><li>Fresh Water Area </li><li>CW Blowdown Area </li><li>Sludges &amp; Transformers LLCC Area</li><li>Refrigerant Storage Area</li><li>Flare Area</li><li>Retention Ponds Area</li><li>Waste Management Facilities Area</li><li>South and West Interconnecting Piperack</li><li>Substations</li><li>ITR buildings   <br/></li></ul><p><b>The main works and the relevant quantities, </b></p><ul><li>Excavation: 237.500 m<sup>3</sup></li><li>Backfilling: 492.000 m<sup>3</sup></li><li>Concrete: 122.000 m<sup>3</sup></li><li>Structural Steel Erection: 9.600 t</li><li>Equipment Erection: 10.000 t</li><li>Piping Fabrication and Erection: 1.177.000 WDI</li><li>Painting (shop and site): 339.400 m<sup>2</sup></li><li>Cable Laying: 2.100.000 m</li></ul>","text_promotion":""},{"id":144,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/Son-TITAS_FCC_0514.jpg","project_type":{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},"project_status":"Ongoing","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/Son-TITAS_FCC_0514.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/Son-TITAS_FCC_0514.jpg","commence":"11-06-2022","complete":"11-03-2025","title":"TÜPRAŞ İzmir Refinery Fluid Catalytic Cracking Revamp Installation Works","slug":"tupras-izmir-refinery-fluid-catalytic-cracker-revamp-installation","job_no":"384","portion":100.0,"client":"TÜPRAŞ, Turkish Petroleum Refineries Co., Inc.","latitude":38.79615,"longitude":26.9532,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>TEKFEN will carry out the renovation of the FCC unit within the scope of the signed contract in the TÜPRAŞ İzmir Refinery.</p><p>Facilities that convert or break down low-value crude oil into lighter products such as higher-value gasoline and LPG are called FCC units, in refineries. With this project, it is aimed to reduce emissions and increase efficiency through compliance with regulations within TÜPRAŞ İzmir Refinery.</p><p>UOP is the technology licensor and TEKFEN Engineering is responsible for detailed engineering services for the project. </p><p>TEKFEN has been awarded to a contract from TUPRAS. Contract includes the execution of all Construction Works for Civil Works, Steel Structure Engineering, Supply and Erection, Mechanical Erection, Electrical and Instruments Supply and Installation, Painting, Insulation, Fireproofing and Pre-commissioning, Commissioning Activities.</p><p><b>The main works and the relevant quantities, </b></p><ul><li>Excavation: 4.500 m<sup>3</sup></li><li>Backfilling: 2.200 m<sup>3</sup></li><li>Piling: 2042 m</li><li>Reinforced Concrete: 3.650 m<sup>3</sup></li><li>Structural Steel Fabrication and Erection: 2.100 T</li><li>Reactor : 180 T</li><li>Regenerator: 264 T</li><li>Equipment Erection: 2500 T</li><li>Piping Fabrication and Erection: 77.000 WDI</li><li>Cable Tray Erection: 8.650 m</li><li>Cable Laying: 67.500 m</li><li>Fireproofing: 7.500 m<sup>2</sup></li><li>Insulation: 4,625 m<sup>2</sup></li><li>Painting: 3,500 m<sup>2</sup></li></ul>","text_promotion":""},{"id":145,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/refinerygeneric.png","project_type":{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/refinerygeneric.png"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/refinerygeneric.png","commence":"14-10-2022","complete":"31-03-2023","title":"TÜPRAŞ İzmir Refinery D-7205 Connection Flare Lines Leveling Works","slug":"tupras-izmir-refinery-d-7205-connection-flare-lines-leveling-works","job_no":"386","portion":100.0,"client":"TÜPRAŞ, Turkish Petroleum Refineries Co., Inc.","latitude":38.79615,"longitude":26.9532,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p><b>GENERAL</b></p><p>Under the Call-Off Framework Agreement signed with TÜPRAŞ on 14 September 2020, Site Engineering (if required), Procurement, Construction and Pre-Commissioning activities required to increase the operational performance of the existing units in the refineries.</p><p><b>İZMİR REFINERY</b></p><p>With the aim of meeting Turkey&#x27;s growing requirement for petroleum product, İzmir Refinery was brought intro operation in 1972. The refinery, which started production with an annual crude oil processing capacity of 3 million tons is now registered as having an annual refining capacity of 11.9 million tons following significant capacity increases and unit modernizations carried out over the years. The İzmir refinery is the only refinery in Turkey to have a machine oil production complex, with a 400,000 tons/year capacity.</p><p><b>PROJECT</b> <b>DESCRIPTION</b></p><ul><li>Preparation of required piping projects inside and outside the unit.</li><li>Supply and manufacture of the required materials and disassembly of the existing pipeline fittings.</li><li>Project design and installation of the new pipeline by passing it over a different route or over the existing route.</li><li>Designing pipeline re-route and supplying materials.</li><li>Performing all tests of the pipeline and replace the concentric reduction in the main header into an eccentric reduction.</li></ul>","text_promotion":""},{"id":146,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/repair-generic.png","project_type":{"title":"Repair, Maintenance And O&M Services","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-repair.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/repair-generic.png"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/repair-generic.png","commence":"30-09-2022","complete":"17-04-2023","title":"TÜPRAŞ İzmir Refinery 2022 Turn around and Miscellaneous Project Works","slug":"tupras-izmir-refinery-2022-turn-around-and-miscellaneous","job_no":"391","portion":100.0,"client":"TÜPRAŞ, Turkish Petroleum Refineries Co., Inc.","latitude":38.79615,"longitude":26.9532,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p><b>GENERAL</b></p><p>Under the Call-Off Framework Agreement signed with TÜPRAŞ on 14 September 2020, Site Engineering (if required), Procurement, Construction and Pre-Commissioning activities required to increase the operational performance of the existing units in the refineries.</p><p><b>İZMİR REFINERY</b></p><p>With the aim of meeting Turkey&#x27;s growing requirement for petroleum product, İzmir Refinery was brought intro operation in 1972. The refinery, which started production with an annual crude oil processing capacity of 3 million tons is now registered as having an annual refining capacity of 11.9 million tons following significant capacity increases and unit modernizations carried out over the years. The İzmir refinery is the only refinery in Turkey to have a machine oil production complex, with a 400,000 tons/year capacity.<br/></p><p><b>PROJECT</b> <b>DESCRIPTION</b></p><ol><li>All disassembly, piping, civil and temporary/permanent steel erection works for replacing the existing gasketed E41 exchanger in 901Y Unit with a new plated E41 exchanger (TÜPRAŞ supply).</li><li>All disassembly, assembly, piping, testing and commissioning works for the new E-8413A/B exchangers (TÜPRAŞ supply) in the U-8400 Unit before and during the planned shutdown.</li><li>All disassembly, assembly, testing and commissioning works for the replacement of the existing E-9904 exchanger in the 9900 DHP Unit with the new E-9904 twisted tube type exchanger.</li><li>Disassembly of the old pipelines that remained idle due to the piping related to the E-9928A/B exchangers that were commissioning in the last planned shutdown in the 9900 DHP Unit.</li><li>Revision of the alloyed pipelines at the inlet and outlet of E-9928A/B exchangers during the planned shutdown.</li><li>Disassembly of existing cranes and strengthening of steel parts for the assembly of 20 tons capacity overhead cranes (TÜPRAŞ supply) to be used in the maintenance of the exchangers on the 7000 Unit P structure.</li><li>Installation of a block valve on the line close to the entrance of the U-7000 Slop line from the output of P-7271 and P-7272.</li><li>Replacement of U-9200 CCR Unit Platformer Reactors Internals with CatMax.</li></ol>","text_promotion":""},{"id":147,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/refinerygeneric.png","project_type":{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},"project_status":"Completed","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/refinerygeneric.png"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/refinerygeneric.png","commence":"04-01-2023","complete":"30-09-2023","title":"TÜPRAŞ Kirikkale Refinery 7290 Wagon Bottom Filling Area Construction Works","slug":"tupras-kirikkale-refinery-7290-wagon-bottom-filling-area-construction-works","job_no":"394","portion":100.0,"client":"TÜPRAŞ, Turkish Petroleum Refineries Co., Inc.","latitude":39.75509,"longitude":33.44866,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p><b>GENERAL</b></p><p>Under the Call-Off Framework Agreement signed with TÜPRAŞ on 14 September 2020, Site Engineering (if required), Procurement, Construction and Pre-Commissioning activities required to increase the operational performance of the existing units in the refineries.</p><p><b>KIRIKKALE REFINERY</b></p><p>TUPRAS Kırıkkale Refinery, established to meet the petroleum demands of Central Anatolia primarily Ankara, Eastern Mediterranean and Eastern Black Sea regions and the Kırıkkale Refinery has an annual 5.4 million ton crude oil processing capacity. The Kırıkkale Refinery has Turkey’s largest road tanker filling capacity.<br/></p><p><b>PROJECT</b> <b>DESCRIPTION</b></p><ul><li>Installation of 6 filling skids and 24 filling arms to be supplied by TÜPRAŞ.</li><li>Procurement of pump, hot water apparatus, valves, pipes &amp; fittings and installation works.</li><li>Detailed engineering, procurement, fabrication and installation works for platform steels.</li><li>Construction of reinforced concrete foundations of skid equipment and platform steels.</li><li>Electrical, instrument and communication cable pulling works and installation of Fire and Gas equipment.</li></ul>","text_promotion":""},{"id":148,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/repair-generic.png","project_type":{"title":"Repair, Maintenance And O&M Services","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-repair.png"},"project_status":"Ongoing","project_location":"Turkey","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/repair-generic.png"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/repair-generic.png","commence":"02-01-2023","complete":"02-01-2026","title":"TANAP Emergency Pipeline Repair, Non-Emergency Pipeline Repair and Project Modifications Services for Trans Anatolian Natural Gas Pipeline System","slug":"pipeline-repair-and-project-modifications-services-trans-anatolian-natural-gas-pipeline-system","job_no":"395","portion":100.0,"client":"TANAP","latitude":41.58383,"longitude":42.818105,"contractor":"Tekfen Construction and Installation Co., Inc.","description":"<p>As part of the Southern Gas Corridor, the Trans Anatolian Natural Gas Pipeline (TANAP) has been built to transport Azerbaijani gas from the Shah Deniz 2 Gas Fields in the Caspian Sea and other fields of Azerbaijan (and other possible neighbouring countries) to Turkey and to Europe at Turkish/Greek border through the Trans-Adriatic Pipeline. </p><p>TANAP comprises of 56” Pipeline section, which reduces to 48” as part of onshore sections with 36” offshore pipeline crossing section:</p><ul><li>56” Section of onshore pipeline - Stretching approximately 1338.9 km from the Interconnection point with SCP System at the Georgian – Turkey border to the TANAP compressor station enter point at Eskişehir. This includes all associated facilities which make up the TANAP System for this section.</li><li>48&quot; Section of onshore pipeline - Stretching approximately 455.3 km from the TANAP compressor station exit point at Eskişehir to the Interconnection point with TAP System at the Turkey – Greek border including the Exit Point at Thrace. This includes all associated facilities which make up the TANAP System for this section.</li><li>Two 36” Section off-shore pipelines – Running two parallel lines and merges into the onshore Station sections Dardanelle East and West either side of the Sea of Marmara. This section is approximately 17.5 km in length.</li></ul><p>TANAP System within the Republic of Turkey reaches a total of approximately 1811.7 km.</p><p><b>This includes off-take stations and aboveground installations as detailed below:</b></p><ul><li>7 Compressor Stations (2 existing and 5 future)</li><li>1 Offtake Compressor Station to supply Turkey’s national natural gas network</li><li>4 Metering Stations</li><li>11 Pigging Stations</li><li>49 Block Valve Stations</li><li>1 Main Control Centre (MCC), located at Golbasi, near Ankara</li><li>1 Back Up Control Centre (BCC) Located within the CS5 Facility at Eskişehir</li><li>Pipeline Monitoring System, SCADA/Telecoms/Security Systems, SOCAR Fibre Optic System and Fibre Optic Cable Network connecting the Containers at AGIs for TANAP &amp; SOCAR<br/></li></ul><p>TEKFEN has been awarded a contract from TANAP as main contractor for Emergency &amp; Non-Emergency Pipeline Repairs and Project Modifications scopes. The contract includes providing equipment and personnel which are ready to mobilize in 48 hours for an emergency repair situation. Emergency repair scope comprises the items below;</p><ul><li>Welding of Pipeline / Full Section Replacement of Pipeline (ASME B31.8)</li><li>Welding of Piping for Stations (AG/UG Piping) (ASME B31.3)</li><li>In-Service Welding</li></ul><p>TEKFEN’s scope is not limited with emergency repairs. There will be several project modifications works and non-emergency repairs along the pipeline and stations. These works will be issued with separated service orders / call offs.</p><p><b>Non-Emergency Pipeline Repair Scope;</b></p><ul><li>Application of full encirclement welded steel sleeve</li><li>Application of epoxy grout filled sleeve</li><li>Application of mechanical leak sealing repair clamp</li><li>Application of pinhole bolting clamp</li><li>Application of composite reinforcement sleeve and wrap repair</li><li>Coating Repair</li><li>Composite Repairs</li></ul><p><b>Project Modifications Scope;</b></p><ul><li>Civil modifications/mitigations such as slope breaker, Rip-Rap, concrete works, retaining wall, drainage works to mitigate ground subsidence, erosion and gully, etc, temporary/permanent fence, access road, earth works, etc.</li><li>Structural steel, support, and cladding works etc.</li><li>Piping modifications and pipe support applications etc.</li><li>Equipment modifications etc.</li><li>OHTL, underground power supply and E&amp;I modifications etc.</li><li>HVAC and mechanical works etc.</li><li>Painting, Coating and Composite Material applications.</li><li>Other possible non-integrity design &amp; engineering and/or modification works.</li></ul>","text_promotion":""},{"id":151,"image":"https://api.tekfeninsaat.com.tr/en/media/original_images/Is_403_-_Master_Gas_Sistemi_Genisletme_Fazi_3_Ana_Boru_Hatti_Projesi_ED16_.jpg","project_type":{"title":"Oil & Gas Facility","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-oil-gas.png"},"project_status":"Ongoing","project_location":"Saudi Arabia","project_image":["https://api.tekfeninsaat.com.tr/en/media/original_images/Is_403_-_image17.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/Is_403_-_image16_-_Duzenlendi.jpg","https://api.tekfeninsaat.com.tr/en/media/original_images/Is_403_-_image18.jpg"],"photo_promotion":"https://api.tekfeninsaat.com.tr/en/media/original_images/Is_403_-_Master_Gas_Sistemi_Genisletme_Fazi_3_Ana_Boru_Hatti_Projesi_ED16_.jpg","commence":"05-09-2024","complete":"29-01-2028","title":"Master Gas System Expansion Phase 3 Main Pipelines Project JED16: Jeddah Cluster","slug":"master-gas-system-expansion-phase-3-main-pipelines-project-jed16-jeddah-cluster","job_no":"403","portion":100.0,"client":"Saudi Arabian Oil Company (Saudi Aramco)","latitude":21.4925,"longitude":39.17757,"contractor":"Tekfen Construction and Installation Co. Inc.","description":"<p>Master Gas System Expansion Phase 3 Main Pipelines Project JED16: Jeddah Cluster is a Lumpsum Turnkey Project including engineering, procurement (except main pipelines’ pipes) and construction works.</p><p>The purpose of the project is to efficiently meet the transmission requirements due to the forecasted demand increase, including sales gas supply to Shoaiba and Shoqaiq regions by 2028, and aiming to cover the energy requirements up to the year 2030.</p><p>Project consists of totally 7 different below ground pipelines having a total length of 77.3 km with variable diameter from 30’’ to 4’’ and various above ground facilities.</p><p>Total Length of Below Ground Pipelines: 77.3 km</p><ul><li>30&quot; JDIFG-1 / South Jeddah Hub: 35 km</li><li>12&quot; SRBCFG-1 / Saudi Red Brick Co.: 24 km</li><li>16&quot; JD3FG-1 / Jeddah 3rd industrial City: 5 km</li><li>8&quot; JD2FG-1 / Jeddah 2nd industrial City: 4,3 km</li><li>12&quot; JD1FG-1 / Jeddah-1st Industrial City: 4 km</li><li>8&quot; UCIFG-1 / United Cement industry: 3 km</li><li>4” MEPCFG-1 / Middle East Paper Co.: 2 km</li></ul><p>Scope of Above Ground Facilities</p><ul><li>14 nos. Scrapper Launcher Stations</li><li>14 nos. Scraper Receiver Stations</li><li>6 nos. Main Line Isolation Valves Stations</li><li>12 nos. Burn Pits</li><li>17 nos. Open-cut Crossing</li><li>17 nos. Trenchless Crossing</li><li>2 Metering Station</li><li>4 Security Buildings</li><li>1 Radio Tower (TETRA)</li></ul><p>The Main Quantities</p><ul><li>Excavation: 242.253 m3</li><li>Bedding &amp;Padding &amp; Backfilling: 257.306 m3</li><li>Structural Filling: 321.091 m3</li><li>Reinforced Concrete: 6.688 m3</li><li>Fiber Optic Cable: 292.383 m</li><li>Manual Welding: 5.114 joints</li></ul>","text_promotion":""}],"Project_type":[{"title":"Terminal","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-terminal.png"},{"title":"Motorway","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-highway.png"},{"title":"Tankage","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-tankage.png"},{"title":"Energy","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-energy.png"},{"title":"Pipeline","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-pipeline.png"},{"title":"Chemical","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-chemical.png"},{"title":"Metro & Railway","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-metro.png"},{"title":"Oil & Gas Facility","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-oil-gas.png"},{"title":"Refinery","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-refinery.png"},{"title":"Topside / Offshore Platform & Modules","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-topside.png"},{"title":"Superstructure & Real Estate","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-superstructure.png"},{"title":"Repair, Maintenance And O&M Services","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-repair.png"},{"title":"Project Management","icon":"https://api.tekfeninsaat.com.tr/en/media/icons/ikon-project-management.png"}],"Project_status":["Completed","Ongoing"],"Project_location":["Azerbaijan","Brazil","Bulgaria","Georgia","Germany","Iraq","Kazakhstan","Kuwait","Libya","Morocco","Qatar","Russian Federation","Saudi Arabia","Sultanate of Oman","Turkey","Turkmenistan","United Arab Emirates","Uzbekistan"]}}